Tohatsu MFS 9.8 A3 — inspection and Maintenance of Cooling Systems: Key Procedures [34/84]

Содержание

CHAPTER 3 INSPECTION AND MAINTENANCE 9 Inspection of Cooling System 1 Thermostat test Put the thermostat in a proper vessel and pour water or warm water into it Heat the vessel together with the thermostat inside and check to see if the valve operates normally Valve operation start temperature 60 C 1 5 C 140 F 3 F Valve full open temperature 75 C 1 5 C 167 F 3 F Valve full open lift 3 mm 0 12 in or more 2 Water pump impeller replacement Remove the spring pin 3 10 from the shift rod joint with the spring pin tool Remove the four 4 gear case bolts and the pull the gear case assembly Remove the three 3 pump case bolts and the pull up the pump case with the liner Remove the pump impeller and replace it with new one Note Besides the impeller inspect the guide plate and liner also If they are badly worn replace them Lower water pipe grommet Water pump case Pump case liner Pump impeller Water pump guide plate Lower water pump case Pump case gasket Guide plate gasket Pump impeller key Pump case bolt 31

Learn essential inspection and maintenance procedures for cooling systems, including thermostat testing and water pump impeller replacement. Ensure optimal performance and longevity.

Скачать