Ecosoft FK1054CIMIXP Инструкция к Ecosoft FU1354CE онлайн [8/88] 867213

Ecosoft FK1054CIMIXP Инструкция к Ecosoft FU1354CE онлайн [8/88] 867213
INSTRUCTION MANUAL ECOSOFT
®
MEDIA SYSTEMS
8
Fiberglass reinforced plastic tank is the cylinder shaped plastic vessel with the lter
media. Control valve is mounted on the threaded top opening. Riser pipe runs down to
the bottom of the tank inside the pressure vessel, transporting water out of the lter during
service and into the lter during backwash. Bottom distributor is attached to its end to spread
ow of water uniformly and screen against ne particles.
Brine regenerable systems (FU and FK) include a brine tank – a plastic container with salt
pellets where the brine is stored then drawn from during regeneration.
Control valve.
CE, CI, and CT type control valves use a plunger piston mechanism to route inuent water
accordingly to the current cycle of operation. DV valves use a rotary disk mechanism.
CE, CI and DV control valves for softening systems (FU and FK series) have 5 cycles;
non-brine regenerable lters have 3 cycle CT control valves. The cycles are as follows:
1. in service mode, inlet water is sent through the lter bed to the puried water outlet;
2. during backwash, the control valve sends inlet water across the lter bed in the upow
direction to u󰀨 it up and release trapped impurities to drain outlet;
3. during fast rinse, inlet water is sent through lter bed downow and then to drain outlet;
4. (CE, CI, and DV only) during brine regeneration, inlet water is sent through brine injection
system to suction brine from brine tank and slowly displace it across lter bed to drain outlet;
5. (CE, CI, and DV only) during brine tank rell, inlet water is sent through the lter bed,
softened e󰀪uent rells the brine tank.
Control valve
type
Operating
cycles
Meter and
brine system
Special
connectivity
Special
rmware
functionality
CE;
Twin
5 Yes 2 motorized valves
dP switch
NO/NC 12 VDC wet contact
Twin interconnect
63 day history/diagnostics
4 display languages
Selectable physical units
CI 5 Yes 1 motorized valve
dP switch
Twin interconnect
63 day history/diagnostics
CT 3 dP switch
DV 5 Yes 63 day history/diagnostics
For more information about your control valve, please refer to control valve manual.

Похожие устройства

Скачать