Sames Kremlin 25-2000µ 000790020 Каталог онлайн [113/120] 869914

Sames Kremlin 25-2000µ 000790020 Каталог онлайн [113/120] 869914
113
www.sames-kremlin.com
Airmix
®
spraying & equipment
Catalog V5.3
General informations
Spray gunsMachines & Controllers PumpsAccessoriesGeneral informations
Temperatures (°C) Viscosity - CA4 (seconds)
Spray gun output (cm3/mm)
morning, cool workshops 15 23 460
Later - workshop heats up 20 20 520
An oven switched on 25 17 560
Paint
Quality problems tend to arise when the temperature of the paint changes during the course of
the day. For example : During the course of this day, the viscosity of the paint has moved from
23 to 17 seconds, which leads to a 22 % increase in the output of the spray guns, leading to
over-coloring and excessive product consumption.
Worse still, paint prepared in a hot workshop at 20 seconds can be at 28 seconds the following
morning, before the workshop has got up to full working temperature: this would lead to a less fine
spray and a much greater drying time.
Drying of paints
he component of paint can be classed in two groups :
»
Dry extracts
»
VOC (Volatile organic compounds), or water in case of water-based paints
Drying paint is all about allowing the volatile products to evaporate and the film to harden. We must
distinguish between hardening and drying.
Drying gives us the dry film purely by the evaporation of the volatile products. This happens at two
stages: during spraying and within the film. Depending on the temperature, the density of the spray,
the type of spray gun and the distance of the spray, the paint can arrive on the surface more or
less dry. That means that the majority of the solvent has evaporated before the paint reaches the
surface. The drying of the wet film is accelerated when the surface is in a well-ventilated area which
has dry air and is dust-free.

Похожие устройства

Скачать