Mi MJXDD01SYL Эксплуатационная инструкция онлайн [3/12] 980411
Превью страниц
Страница 3 /
12
![Mi MJXDD01SYL Эксплуатационная инструкция онлайн [3/12] 980411](/views2/2245279/page3/bg3.png)
11
Installation
1. Drill holes
Place the base in the position the ceiling light will be installed, and mark the positions
of the mounting holes, then remove the base. Use a φ6 mm drill to drill holes with a
depth of at least 40 mm, then insert the included four wall plugs into the holes.
Note: Try to wiggle the base around to make sure it is properly and firmly installed.
Otherwise, it may fall down.
2. Fix the base
Lead the stripped wires through the wiring hole in the base, and then align the
mounting holes with the wall plugs. Screw the included four self-tapping screws into
the wall plugs to fix the base onto the ceiling. Make sure the base is securely installed.
EN
Похожие устройства
-
Yeelight YLXD01YLИнструкция по инсталляции -
Camelion LCL-1018Руководство по использованию -
Camelion LCL-1017Инструкция по применению -
Camelion LCL-1033Руководство по использованию -
Camelion LCL-1053Руководство по использованию -
Camelion LCL-1028Руководство пользователя -
Camelion LCL-1027Руководство по эксплуатации -
Camelion LCL-1026Инструкция пользователя -
Camelion LCL-1025Инструкция к устройству -
Camelion LCL-1024Инструкция по применению -
Ritter S23352Руководство по настройке -
EKF Умный потолочный светильник 600 мм EKF ConnectРуководство по эксплуатации