Sea-Doo GTX Limited iS 2009 Инструкция по эксплуатации онлайн [46/555] 12053

Sea-Doo GTX Limited iS 2009 Инструкция по эксплуатации онлайн [46/555] 12053
Section 02 ENGINE
Subsection 01 (ENGINE REMOVAL AND INSTALLATION)
When alignment and longitudinal position of en-
gine are correct, tighten engine mount screws.
Refer to
ENGINE MOUNTS
in this subsection.
Recheck engine alignment.
ENGINE MOUNTS
If engine mounts have been removed, apply LOC-
TITE 243 (BLUE) (P/N 293 800 060)
on screw threads
or use new screws with self-locking product.
Torque all engine mount screws to 25 N•m
(18 lbf•ft).
1
Loctite
243
2
1
Loctite 243
2
1
Loctite
243
2
smr2009-016-033_a
1. Torque
to 25 N•m (18 lbf•ft)
2. Position conical spring washer with its concave side towards hull
smr2009-016 23
Скачать