Commax CMD-101BU Инструкция по эксплуатации(ENG) онлайн [12/15] 283685

11
NO. If the builiding distributor is extended to several sets in a building, 7/8 number
line has been set up when the Switch 6 is made on.
NO. If the builiding distributor is extended to several sets in a building, 9/10number
line has been set up when the Switch 7 is made on.
NO. If the builiding distributor is extended to several sets in a building, 11/12 num-
ber line has been set up when the Switch 8 is made on.
Ex) Number 1 ~ 4 Line : Switch 3, 4 ON / Switch 5 ~ 8 OFF
www.safemag.ru
www.safemag.ru
Скачать