Removal and Vacuumizing
The maintenance or other operations of the refrigeration circuit shall be made as per conventional procedures.
Moreover, the flammability of refrigerant shall also be mainly considered. The following procedures shall be
followed:
• Refrigerant clearing;
• Pipeline purification with inert gas;
• Vacuumizing;
• Pipeline purification again with inert gas;
• Pipeline cutting or welding. The refrigerant shall be recovered to a proper cylinder. The system shall be
purged with OFN, to ensure safety. The step above may need to be repeated for several times. Compressed air or
oxygen cannot be used for purging.
In the course of purging, OFN shall be charged inside the refrigeration system under vacuum state, to reach
the operating pressure. Afterwards, the OFN shall be discharged to the atmosphere. Finally, the system shall be
vacuumized. The step above shall be repeated until all the refrigerants in the system are cleared. The OFN charged
for the last time shall be discharged to the atmosphere. Afterwards, the system can be welded. The operation
above is
necessary in case of pipeline welding.
It shall be guaranteed that no alight fire source is around the outlet of the vacuum pump and the ventilation is
favorable.
Welding
• Favorable ventilation must be guaranteed in the maintenance area. After the maintenance machine is subject
to the vacuumizing above, the system refrigerant can be discharged on the outdoor unit side.
• Before the outdoor unit is welded, it must be guaranteed that no refrigerant is inside the outdoor unit and the
system refrigerant has been discharged and cleared.
• The refrigeration pipelines cannot be cut with a welding gun under any circumstance. The refrigeration
pipelines must be disassembled with a pipe cutter, and the disassembly must be carried out around a ventilation
opening.
Refrigerant Charging Procedures
The following requirements are added as the supplementation of conventional procedures:
• During the
use of refrigerant charging tools, cross contamination of different refrigerants shall be avoided.
The total length (including the refrigerant pipelines) shall be shortened as much as possible, to reduce the residual
of refrigerant inside;
• The cylinders of refrigerant shall be kept upright;
• Before refrigerant charging, the refrigeration system shall be earthed;
• A label must be pasted on the refrigeration system after refrigerant charging;
• Excessive charging is not allowed; the refrigerant shall be charged slowly;
• In case system leakage is identified, refrigerant charging is not allowed unless the leak point is plugged;
• During refrigerant charging, the charging amount shall be measured with an electronic scale or a spring
scale. The connecting hose between the refrigerant cylinder and the charging equipment shall be relaxed
appropriately, to avoid impact on the measuring accuracy due to stress.
Requirements on storage site of refrigerant
• The cylinder of refrigerant shall be placed in a -10~50°C environment with favorable ventilation, and
warning labels
shall be pasted;
• The maintenance tool in contact with the refrigerant shall be stored and used separately, and the
maintenance tool of different refrigerants cannot be mixed.
Scrapping and Recovery
Scrapping
Before scrapping, the technician shall be completely familiar with the equipment and all its features. The safe
recovery of refrigerant is recommended. In case the refrigerant recovered needs to be reused, before which the
sample of refrigerant and oil shall be analyzed. The power supply required shall be guaranteed before tests.
(1) The equipment and operation shall be well known;
(2) Power supply shall be switched off;
(3) The followings shall be guaranteed before scrapping:
• The mechanical equipment shall be convenient for operation on the cylinder of refrigerant (if necessary);
• All personal protective equipment is available and being used correctly;
• The whole course of recovery shall be guided by qualified personnel;
• The recovery equipment and cylinders shall be in line with corresponding standards.
(4) The refrigeration system shall be vacuumized if possible;
10
Содержание
- Room air conditioner installation manual 1
- U26macfra 1u35macfra 1u53racfra 1
- U71racfra 1
- Contents 2
- Keep this manual where the user can easily find it 3
- Read the precautions in this manual carefully before operating the unit this appliance is filled with r32 3
- Warning 3
- Cautio 4
- Contains fluorinated greenhouse gases covered by the kyoto protocol 4
- How to use dred appliance 4
- Important information rega rding the refrigerant used 4
- The filled out label must be adhered in the proximity of the product charging port e g onto the inside of the stop value cover a contains fluorinated greenhouse gases covered by the kyoto protocol b factory refrigerant charge of the product see unit name plate c additional refrigerant amount charged in the field d total refrigerant charge e outdoor unit f refrigerant cylinder and manifold for charging 4
- The maximum refrigerant charge amount m 5
- Maintenance items 11
- Adhesive tape 14
- Air inlet 14
- Air outlet 14
- Compressor inside of unit 14
- Drain hose 14
- Heating insulating material 14
- Indoor outdoor unit installation drawings 14
- Non adhesive tape 14
- Optional parts for piping 14
- Piping hole cover 14
- Please be subjected to the actual product purchased 14
- Saddle l s with screws connecting electric cable for indoor and outdoor drain hose 14
- The marks from to in the gure are the parts numbers the indoor unit should be installed at the recommended height 2m 14
- When installing the unit to wall roof or rooftop fix a supporter surely with nails or wires in preparation of earthquake and strong wind 2 air conditioner mounted not above and one meter away from electric equipment such as television 14
- Hfc 410a 21
- A 110mm 22
- A 120mm 22
- A 126mm 22
- A 212mm 22
- Cushion rubber 22
- Installation dimension unit mm 22
- Caution 23
- Connection of pipes 23
- Ceramic type of ac 250v t25a 26
- Outdoor unit 27
- Australia 1300 729 948 haier com au new zealand 0800 424 372 haier co nz 28
- For haier appliances 28
Похожие устройства
- Haier AS26TACHRA Брошюра
- Haier AS26TACHRA Инструкция по эксплуатации
- Haier AS26TACHRA Инструкция по монтажу
- Haier AS35TBCHRA Брошюра
- Haier AS35TBCHRA Инструкция по эксплуатации
- Haier AS35TBCHRA Инструкция по монтажу
- Haier AS53TCCHRA Брошюра
- Haier AS53TCCHRA Инструкция по эксплуатации
- Haier AS53TCCHRA Инструкция по монтажу
- Haier AS71TECHRA Брошюра
- Haier AS71TECHRA Инструкция по эксплуатации
- Haier AS71TECHRA Инструкция по монтажу
- Haier 1U09MACFRA Инструкция по монтажу
- Haier 1U12MACFRA Инструкция по монтажу
- Haier 1U18RACFRA Инструкция по монтажу
- Haier 1U24RACFRA Инструкция по монтажу
- Haier 1U26MACFRA Инструкция по монтажу
- Haier 1U35MACFRA Инструкция по монтажу
- Haier 1U53RACFRA Инструкция по монтажу
- Haier 1U71RACFRA Инструкция по монтажу