Rondell RDE-1112 Инструкция по эксплуатации онлайн [26/52] 810684

Rondell RDE-1112 Инструкция по эксплуатации онлайн [26/52] 810684
26
Add clean room temperature water to the water tank.
Do not exceed the MAX mark. It is recommended to
fill the water tank by 3/4 to the MAX mark.
Install the water tank in the coffee machine and
press its lower left edge until it is completely fixed
(Fig. 2).
Notes: The tank (4) can be filled only with clean water
at room temperature. Do not pour hot or ice water, as
well as mineral water and milk into the tank. Failure to
comply with this requirement will lead to cracks in the
container or damage to the device. When installing and
removing the water tank, always hold it by the recess at
the bottom of the tank. It is forbidden to hold the tank
by its upper part. This may cause its damage, fall and
spill of the liquid.
Open the lid of the bean container (8).
Before the first use, add 30 to 200 g of coffee beans
to the bean container (10) (Fig. 3).
Notes: Only coffee beans can be placed in the con-
tainer (10), please do not add water, ground coffee,
sugar, spices, coffee beans mixed with solid particles
to it. This can lead to the failure of the knives and the
coffee grinder mechanism itself.
UNIT OPERATION
Switching the coffee machine on/off
Connect the plug of the power cord of the device to the
mains (Fig. 4).
Press the On button (16) on the control panel (7).
When switched on, the coffee machine runs a self-diag-
nosis and automatic washing.
Note:
To prevent the removable tray (1) from overflowing
with dirty water during rinsing, place a cup or other
suitable container under the coffee supply unit (2)
(Fig. 5).
To prevent droplets from splashing, always adjust
the height of the coffee supply unit (2) to the height
of the cup.
The automatic flushing mode starts when you turn
it on for the first time, as well as when the machine
is activated from standby mode. After the washing
process is completed, dirty water can be poured out
of the container.
The process of preparing the machine for operation is
reflected on the display (18) (Fig. 6-7).
When the preparatory processes are completed, the
device will enter standby mode. A message will appear
on the display (18) (Fig. 8).
To turn off the coffee machine and put it into standby
mode, press and hold the button (16) for 2 seconds.
The flushing process will start. Information will be
shown on the display (Fig. 9). Then the coffee machine
will return to the «Off» mode.
MAKING DRINKS
Place a cup under the adjustable coffee spout (2)
of the coffee machine and adjust its height (fig. 5).
Before the first use, set the grinding degree control
knob (14) of coffee beans to the middle position.
To prepare a drink, press one of the buttons on the con-
trol panel according to your choice of «Espresso» (26),
«Americano» (25), «Cappuccino» (19), «Latte» (20),
«Hot water» (24) (Fig. 10).
The preparation process will end automatically when
the coffee machine has made the programmed
amount of drink.
To get a double portion of the drink, press the
«Double portion» button (23) until the coffee prepa-
ration process is completed. The corresponding pic-
ture «x2» will appear on the display (Fig. 11).
To interrupt the process of making the drink at any
stage, press the «On/Off/Exit» button (16).
When the coffee making process is finished, take the
cup with the drink away.
Preparation of a drink from ground coffee
To prepare a drink from ground coffee, press the button
(28) «Ground coffee/Input» on the control panel in the
standby mode.
An animated load image will be shown on the dis-
play (Fig. 12).
Open the lid of the grain container (8) and remove
the protective cover of the funnel for loading ground
coffee (9).
Using a measuring spoon from the delivery set, pour
one portion of ground coffee into the loading chan-
nel (Fig. 13).