Sea-Doo GTX Limited iS 2009 Инструкция по эксплуатации онлайн [95/555] 12053

Sea-Doo GTX Limited iS 2009 Инструкция по эксплуатации онлайн [95/555] 12053
Section 02 ENGINE
Subsection 07 (PTO HOUSING AND MAGNETO)
WARNING
Always disconnect battery cables exactly in
the specified order, BLACK negative cable
first.
2. Remove the moving deck and deck extension.
Refer to
BODY
subsection.
3. Drain the engine oil. Refer to
LUBRICATION
SYSTEM
subsection.
4. Remove the cylinder head cover. Refer to
CYLINDER HEAD
subsection.
5. Using
SUCTION PUMP (P/N 529 035 880), insert
the tube in the lower area of the timing chain.
Syphon remaining oil.
smr2006
-006-003_a
1. Oil siphoning tube
2. Edge of cylinder block
6. Drain e
ngine coolant, refer to the
COOLING
SYSTEM
subsection.
Remove the air intake silencer. Refer to
AIR IN-
TAKE SYSTEM
subsection.
Remove the supercharger air outlet hose.
Move mu
ffler rearwards. Refer to
EXHAUST SYS-
TEM
sub
section.
Remove the supercharger, refer to the
SUPER-
CHARGER
subsection.
smr2009-020-005_b
1. Supercharger
Refer to
STEERING AND PROPULSION
and re-
move the following:
Jet pump
Drive shaft
Drive shaft bellows.
Disconnect CPS connector from wiring harness.
smr2008-023-016_a
CPS CONNECTOR
Discon
nect the magneto connector from wiring
harnes
s. The connector is located between ECM
and th
rottle body.
72 smr2009-022
Скачать