Fubag iw-111 100111 [4/10] Page03

Содержание

Operator s manual Fubag www fubag ru 4 Connection and operation It is necessary to re activate the tool before the operation start To re activate the tool pour the pure paraffin through the inlet connecting pipe when the trigger is open then blow the tool through with the dry compressed air Repeat it 2 or 3 times The system of the compressed air lead in to the tool is in the below diagram Before the first putting the tool into operation it is necessary to pour in 5 10 ml of the machine oil as per specification SAE 10 or its analog through the connecting pipe of the compressed air lead in Blow the air hose through Connect it to the tool press the starting lever and operate the tool at no load running within 2 3 minutes After it release the starting lever If the lubricator is not used during the operation it is necessary to pour 5 10 ml of the machine oil as per specification SAE 10 or its analogue into the inlet connecting pipe of the tool every operating hour Use only the recommended lubricators Check the thread connection tightening firmness on the housing of the tool periodically during the maintenance their slackening is not allowed The tool provides fast gripping screwing and unscrewing of the thread hardware The heads are to be of the impact type with the corresponding size Do not use any other head types The moment of the reinforce of the button rotation the values of the moment are indicated around can be adjusted The lower value denotes little force the high ony denotes high force Make sure the reverse switcher is set up every time before screwing and unscrewing in a proper way The symbol F denotes screwing while the symbol R stands for unscrewing Screwing is defined as clockwise rotation Avoid mechanical damages of the tool as it may cause malfunctions or failure Keep the tool clean to provide its proper operation 1 Air tool 2 Oil lubricator 3 Pressure governor 4 Filter 5 Closing cock 6 Pressure release cock 7 Conduit 8 Compressor 9 Hose

Скачать