5.3.3 Refrigerantpipinginsulation
Usepolyethylenefoamasinsulationmaterial:
withaheattransferratebetween0.041and0.052W/mK(0.035
and0.045kcal/mh°C)
withaheatresistanceofatleast120°C
Insulationthickness
Ambient
temperature
Humidity Minimumthickness
≤30°C 75%to80%RH 15mm
>30°C ≥80%RH 20mm
5.4 Preparingelectricalwiring
5.4.1 Aboutpreparingelectricalwiring
INFORMATION
Also read the precautions and requirements in the
"Generalsafetyprecautions"chapter.
INFORMATION
Also read "6.7.5 Specifications of standard wiring
components"onpage22.
WARNING
If the power supply has a missing or wrong Nphase,
equipmentmightbreakdown.
Establish proper earthing.Do NOT earth the unit to a
utility pipe, surge absorber, or telephone earth.
Incompleteearthingmaycauseelectricalshock.
Installtherequiredfusesorcircuitbreakers.
Secure the electrical wiring with cable ties so that the
cables do NOT come in contact with sharp edges or
piping,particularlyonthehighpressureside.
Do NOT use taped wires, stranded conductor wires,
extension cords, or connections from a star system.
Theycancauseoverheating,electricalshockorfire.
DoNOTinstallaphaseadvancingcapacitor,because
this unit is equipped with an inverter. A phase
advancing capacitor will reduce performanceand may
causeaccidents.
WARNING
All wiring must be performed by an authorized
electrician and must comply with the applicable
legislation.
Makeelectricalconnectionstothefixedwiring.
All components procured on the site and all electrical
construction must comply with the applicable
legislation.
WARNING
ALWAYSusemulticorecableforpowersupplycables.
6 Installation
6.1 Overview:Installation
This chapter describes what you have to do and know onsite to
installthesystem.
Typicalworkflow
Installationtypicallyconsistsofthefollowingstages:
Mountingtheoutdoorunit.
Mountingtheindoorunits.
Connectingtherefrigerantpiping.
Checkingtherefrigerantpiping.
Chargingrefrigerant.
Connectingtheelectricalwiring.
Finishingtheoutdoorinstallation.
Finishingtheindoorinstallation.
INFORMATION
Forinstallationoftheindoorunit(mountingtheindoorunit,
connecting the refrigerant piping to the indoor unit,
connecting the electrical wiring to the indoor unit …), see
theinstallationmanualoftheindoorunit.
6.2 Openingtheunits
6.2.1 Aboutopeningtheunits
Atcertaintimes,youhavetoopentheunit.Example:
Whenconnectingtherefrigerantpiping
Whenconnectingtheelectricalwiring
Whenmaintainingorservicingtheunit
DANGER:RISKOFELECTROCUTION
DoNOTleavetheunitunattendedwhentheservicecover
isremoved.
6.2.2 Toopentheoutdoorunit
1
2

Содержание

Похожие устройства

Скачать