Daikin RXYSQ10TY1 [7/72] For the installer

Daikin RXYSQ10TY1 [7/72] For the installer
3 About the box
Installer and user reference guide
7
RXYSQ8~12TMY1B
VRV IV-S system air conditioner
4P404225-1A – 2015.11
Installer and user reference guide:
Preparation of the installation, technical specifications,
reference data,…
Detailed step-by-step instructions and background information
for basic and advanced usage
Format: Digital files on http://www.daikineurope.com/support-
and-manuals/product-information/
Latest revisions of the supplied documentation may be available on
the regional Daikin website or via your dealer.
The original documentation is written in English. All other languages
are translations.
For the installer
3 About the box
3.1 Overview: About the box
This chapter describes what you have to do after the box with the
outdoor unit is delivered on-site.
It contains information about:
Unpacking and handling the units
Removing the accessories from the units
Removing the transportation stay
Keep the following in mind:
At delivery, the unit must be checked for damage. Any damage
must be reported immediately to the carrier's claims agent.
Bring the packed unit as close as possible to its final installation
position to prevent damage during transport.
When handling the unit, take into account the following:
Fragile, handle the unit with care.
Keep the unit upright in order to avoid compressor
damage.
Choose on beforehand the path along which the unit is to be
brought in.
3.2 Outdoor unit
3.2.1 To unpack the outdoor unit
2
1
3
1
2
8 HP
2
1
10+12 HP
3.2.2 To handle the outdoor unit
Carry the unit slowly as shown:
CAUTION
To avoid injury, do NOT touch the air inlet or aluminum fins
of the unit.
Forklift. As long as the unit
remains on its pallet, you can
also use a forklift.
Crane. In case of RXYSQ10+12,
you can also use a crane and lift
the unit as follows:
c
b
a
b
d

Содержание

Скачать