Hitachi RAK-35RPC Инструкция по эксплуатации онлайн

1 Installation of Hanger , Wall Penetration and Installation of Protection Pipe
CAUTION
s The draining of the water container inside the Indoor unit can be done from the left.
Therefore the hanger must be fixed horizontally or slightly tilted towards the side of
drain hose. Otherwise, condensed water may overflow the water container.
Direct Mounting On The Wall
s Please use hidden beams in the wall to hold the hanger.
Screw the hanger at the
positions possibly near the
upper and lower hooks where
the indoor unit is hung. Use 4 or
more screws to fix the hanger.
The remote controller
must be slide in
the remote controller
holder, in the direction
as shown in the figure,
until it hooks at the
lower end of the remote
controller holder.
Screw (2 pieces)
Remote
Controller
Holder
Remote
Controller
FOR
SERVICE
PERSONNEL
ONLY
SAFETY PRECAUTION
s Read the safety precautions carefully before operating the unit.
s The contents of this section are vital to ensure safety. Please pay special attention to the following sign.
WARNING .......... Incorrect methods of installation may cause death or serious injury.
CAUTION .......... Improper installation may result in serious consequence.
Make sure to connect earth line.
This sign in the figures indicates prohibition.
Be sure that the unit operates in proper condition after installation. Explain to customer the proper operation and maintenance of
the unit as described in the user' s guide. Ask a customer to keep this installation manual together with the instruction manual.
WARNING
s Please request your sales agent or qualified technician to install your unit. Water leakage, short circuit or fire may occur if you do the
installation work yourself.
s Please observe the installation stated in the installation manual during the process of installation. Improper installation may cause
water leakage, electric shock and fire.
s Make sure that the units are mounted at locations which are able to provide full support to the weight of the units. If not, the units may
collapse and impose danger.
s Observe the rules and regulations of the electrical installation and the methods described in the installation manual when dealing
with the electrical work. Use cables which are approved official in your country. Be sure to use the specified circuit. A short circuit and
fire may occur due to the use of low quality wire or improper work.
s Be sure to use the specified cables for connecting the indoor and outdoor units. Please ensure that the connections are tight after the
conductors of the wire are inserted into the terminals to prevent the external force is being applied to the connection section of the
terminal base. Improper insertion and loose contact may cause over-heating and fire.
s Please use the specified components for installation work. Otherwise, the unit may collapse or water leakage, electric shock, fire or
stronger vibration may occur.
s
Be sure to use the specified piping set for R410A. Otherwise, this may result in broken copper pipes or faults.
s
When installing or transferring an air conditioner to another location, make sure that air other than the specified refrigerant (R410A)
does not enter the refrigeration cycle. If other air should enter, the pressure level of the refrigeration cycle may increase abnormally
which could result in a rupture and injury.
s Be sure to ventilate fully if a refrigerant gas leak while at work. If the refrigerant gas comes into contact with fire, a poisonous gas may
occur.
s After completion of installation work, check to make sure that there is no refrigeration gas leakage. If the refrigerant gas leaks into the
room, coming into contact with fire in the fan-driven heater, space heater, etc., a poisonous gas may occur.
s Unauthorized modifications to the air conditioner may be dangerous. If a breakdown occurs please call a qualified air conditioner
technician or electrician. Improper repairs may result in water leakage, electric shock and fire, etc.
s Be sure to connect the earth line from the power supply wire to the outdoor unit and between
the outdoor and indoor unit. Do not connect the earth line to the gas tube, water pipe, lighting rod or the earth line of the
telephone unit. Improper earthing may cause electric shocks.
s When finishing the refrigerant collection (pumping down), stop the compressor and then remove the coolant pipe.
If you remove the refrigerant pipe while the compressor is operating and the service valve is released, air is sucked and a
pressure in the freezing cycle system will build up steeply, causing an explosion or injury.
s When installing the unit, be sure to install the refrigerant pipe before starting the compressor.
If the refrigerant pipe is not installed and the compressor is operated with the service valve released, air is sucked and the
pressure level of the refrigeration cycle may increase abnormally which could result in a rupture and injury.
A circuit breaker must be installed in the house distribution box for the direct
connected power supply cables to the outdoor unit. In case of other
installations
a main switch with a contact gap or more than 3mm has to be installed.
Without a circuit breaker, the danger of electric shock exists.
Do not install the unit near a location where there is flammable gas.
The outdoor unit may catch fire if flammable gas leaks around it.
Please ensure smooth flow of water when installing the drain hose. Improper
installing may wet your fu niture.
An IEC approved power cord should be used. Power cord type:
NYM.
MODEL
INDOOR UNIT
The electric cables should neither be reworked nor added.
Make sure to use an exclusive circuit breaker.
Otherwise fire or electric shock might occur by connection failure, isolation failure or over current.
Make sure to connect cables to terminal properly and terminal cover should close firmly.
Otherwise, over heating at terminal contact, fire or electric shock might occur.
Make sure that there is no dust on any connected points of electric cables and fix firmly.
Otherwise, fire or electric shock might occur.
s
s
s
WARNING
s
The unit should be mounted at stable, non-vibratory location which can provide
full support to the unit.
CAUTION
s No nearby heat source and no obstruction near the air outlet is allowed.
s
The clearance distances from top, right and left are specified in figure
below.
s
The location must be convenient for water drainage and pipe connection
with the Outdoor unit.
s To avoid interference from noise, please place the unit and its remote
controller at least 1m from the radio and television.
s
To avoid any error in signal transmission from the remote controller, please
put the controller far away from high-frequency machines and high-power
wireless systems.
CAUTION
s
s
s
s
THE CHOICE OF MOUNTING SITE
(Please note the following matters and obtain permission from customer before installation.)
s Drill a ø65mm hole on wall which is
slightly tilted towards the outdoor side.
Drill the wall at a small angle.
s
Cut the protection pipe according to the
wall thickness.
s
Empty gap in the sleeve of protection
pipe should be completely sealed with
putty to avoid dripping of rain water into
the room.
s
Please ensure smooth flow of water
when installing the drain hose. Improper
installing may wet your funiture.
s
An IEC approved power cord should be
used. Power cord type: NYM.
WARNING
Be sure that the wire is not in contact with any metal in the wall.
Please use the protection pipe as wire passing through the
hollow part of the wall so as to prevent the possibility of
damaged by mouse. Unless it seals completely,any air with high
humidity flows from outdoor and any dew may drop.
Seal with
putty
Protection
pipe
Sleeve of
protection
pipe
Seal with
putty
Outdoor
Indoor
2-5mm
2 Installation Of The Indoor Unit
WALL
1
PIPING FROM THE RIGHT SIDE
(BACKWARD, DOWNWARD, HORIZONTAL)
Preparation
s
Connect connecting cord.
s
Pull out the pipe, connecting
cord and drain hose.
Installation
s
Insert the pipe through the wall hole.
1 The
upper part of the Indoor unit
is hanged on the hanger.
2
1
1
2
The projection at the lower part
of the Indoor unit is hooked onto
the hanger.
Connecting cords, pipe and
drain hose must be laid
together with Vinyl tape.
Cutting Low Cover bush
s
While installing the pipe from the right, left or bottom
side, use a knife to cut openings as shown in figure.
Then smoothen the edges of openings with a file.
Wall Penetration and Installation of Protection Pipe
Installation Of Remote Controller
s
s
The remote controller can be placed in its holder which is fixed on
wall or beam.
To operate the remote controller at its holder, please ensure that the
unit can receive signal transmitted from the controller at the place where
the holder is to be fixed.The unit will beep when signal is received from
the remote controller . The signal transmission is weaken by the fluorescent
light. Therefore, during the installation of the remote control holder, please
switch on the light, even during day time, to determine the mounting
location
of
the holder
.
Wall hole
Lift the body
of the unit
upwards and
then force it
downwards.
1
Hanger
Refrigerating
Pipe
Protection
Pipe
Drain Hose
Connecting Cord
Projection
Pipe
Drain hose
Cable
Drain layout of
backward piping
Hanger
Names of Indoor Components
Direction of Piping
Backward piping
from left
Connection
Figure showing the Installation
of Indoor Unit.
Procedures of Installation and Precautions
s Procedures to fix the hanger.
1.Drill holes on wall.
(As shown below)
2.Push plug into the holes.
(As shown below)
3.Fix the hanger on wall
with 4.1 x 32 screw.
(As shown in figure below)
s Procedures to fix the holder of remote control.
1.Drill holes on wall.
(As shown below)
2.Push plug into the holes.
(As shown below)
Remote
Control
Holder
32mm
Wall
ømm8
.4
1
Hanger
2
Screw
Wall
Plug (Procure locally)
Screw
20mm
ømm4
.4
Wall
Plug
(Procure
locally)
Ceiling
1
2
above
50mm
above
50mm
above
50mm
mm003 tuoba
about 450mm
dneb
ton tsu
m
The indoor piping
should be insulated
with the enclosed
insulation pipe. (If the
insulator is insufficient,
please use commercial
products.)
2300 mm or more
Plug
3
4
There are 6 directions
allowed,namely,backward
piping, backward piping
from left,horizontally piping
from right,horizontally piping
from left,vertically down from
right,vertically down from left.
Openings
Openings
Be sure to
completely
seal any
gap with
putty.
9
7
8
7
8
No. Item Qty
Hanger
Screw for Hanger
AAA size Battery
Remote Controller
1
2
3
4
6
7
8
9
2
2
2
C-case
Air
Cleaning Mesh
Wasabi-Nano Titanium
Screw for Remote
Controller Holder
Remote Controller Holder
2
Insulation sheet
5
Wall hole
Weight
Line
Hanger
Level
Screw for Hanger
Drain Hose
Visible outline of the
Indoor Unit
The installation height should be at least 2300 mm or more
from the floor.
s
EN
1
668
mm
37 mm
115 mm
180 mm
160 mm
mm
100
mm
100
193 mm
900 mm
295 mm
42.5 mm
42.5 mm
772 mm
284 mm
550 mm
275 mm
23 mm
39 mm
Wiring of The Indoor Unit
s
For wire connection of the Indoor unit, you need to remove the front
cover, the
low cover under the body of the unit and terminal cover.
s
Remove the cover from the terminal base and screw the cable.
Method to remove the low cover
s
Pull at the 1 and
2
in
the directions as shown
by arrows to remove the
cover.
1
2
Detail of Cutting the Connecting Cord
Preparation
Changed of Drain Hose and Installation Procedures.
s
Exchange the location of drain hose and drain cap while installing the pipe from the left side as
shown in below. Be sure to plug in the drain hose until the insulating material folds upon itself.
s Please use pliers to pull out the drain cap.
(This is an easier way to remove the drain
cap).
CAUTION
Insufficient insert may
result in water leakage.
Drain Hose
Drain cap
s
Remove low cover
s
Insert drain cap up to the
location securely till the
cap stops.
s
Push the pipe deeply until the insulating
section of the drain hose end gets over the
rib at the indoor unit side.
CAUTION
s
The rubber strap used for fixing the insulator should not
be tied with great force. Otherwise,this will damage heat
insulation and causes water condensation.
s Please pull the lower part of the Indoor unit outwards to
check if the unit is hooked onto the hanger. Improper
installation may cause vibration and noise.
s Transform the piping while holding down the
lower portion
of pipe-support by hand.
Pipe
Rubber strap tied
with great force
INSTALLATION AFTER CONNECTION OF REFRIGERATING PIPES
s The refrigerating pipe should be adjusted to fit into
the hole on the wall and then ready for further
connection.
s The terminals of 2 connected pipes must be covered
with insulator used for terminal connection. Then the
pipes are wrapped with insulation pipe.
s Connect the connecting cord after removing low
cover.
(Refer to "CONNECTION OF POWER CORD")
s After adjustment, fit the connecting cord and pipes
into the space available under the unit. Use holder to
hold them tight.
s Holder can be attached at the either of 2 places.
Please select the easier position.
THE CONNECTION OF REFRIGERATING PIPE DURING
THE INSTALLATION OF INDOOR UNIT
Preparation To Install Refrigerating Pipes
s The refrigerating pipes and connecting cord
transform and are attached.
Please bend at a small
radius to form an arc
Installation
Hang the indoor unit onto the hanger. Use the temporary stan
d
at the back of the Indoor unit to push its lower part 15cm
forwards.
s Place the drain hose through the hole on the wall.
s Wrap the refrigerating pipes with insulation pipe afte
r
connecting refrigerating pipe.
s Connect the connecting cord after removing low cover.
(Refer to "Connection of Power Cord")
s After adjustment, the connecting cord and refrigerating pipes
are placed into the space available under the Indoor unit.
s The projection of Indoor unit must hook to the hanger.
Pull this to the front during the
connection of refrigerating
pipe to ease task.
4 Installation of Drain Hose
CAUTION
Be sure that the drain hose is
not loosely connected bend or
proper condition like left figure.
CAUTION
You are free to choose the side (left or right) for the installation of drain
hose. Please ensure the smooth flow of condensed water of the Indoor
unit during installation. (Careless may result in water leakage.)
s The connected terminals should be completed sealed
with heat insulator and then tied up with rubber strap.
s Do not tie the terminals with the tape too tight.
If any clearance or over-tightening may cause
condensation.
s Please tie the pipe and power line together with vinyl
tape as shown in the figure showing the installation of
Indoor and Outdoor units.
s To enhance the heat insulation and to prevent water
condensation, please cover the outdoor part of the
drain hose and pipe with insulation pipe.
s Completely seal any gap with putty.
Insulation material for pipe
connection
Sleeve of
protection pipe
Putty
Putty
The end of the refrigerating pipes are at
locations marked with “
” symbol.
3 Heat Insulation and Finish of the Piping
Drain cap
Pipe
support
Transform after
bending downward.
Pipe
Connecting
cord
Drain hose
Insulation pipe (must be wrapped with
vinyl tape at every 120 mm)
5mm
Protection
pipe
Connecting cord
Connected
section
Drain hose
below
pond
Bending upwards
Condensed water
Ditch
about 15cm
Hook
Projection
pond
Condensed water
s Remove burr and jagged edge will cause leakage.
s Point the side to be trimmed downwards during
trimming to prevent copper chips from entering the pipe.
s Before flaring, please put on the flare nut.
A
Die
Die
Copper pipe
s Please use
exclusive tool for
refrigerant R410A.
2 Pipe Connection
CAUTION
s In case of removing flare nut of a indoor unit, first remove
a nut of small diameter side, or a seal cap of big diameter
side will fly out. Free from water into the piping when
working.
s Be sure to tighten the flare nut to the specified torque with
a torque wrench.
If the flare nut is overtightened, the nut may be split after a
long period has passed, and may cause a refrigerant leak.
s Please be careful when bending the copper pipe.
s Screw in manually while adjusting the center.
After that, use a torque wrench to tighten the
connection.
Torque
wrench
Flare nut
Wrench
Gas leakage inspection
Please use gas leakage detector to check if
leakage
occurs at
connection of Flare nut
as shown
If gas leakage
occurs,
further tighten the connection
to stop leakage.
1 Preparation of Pipe
s Use a pipe cutter to cut the copper pipe and remove burr.
CAUTION
s
Push up the [PUSH] sections at the bottom of the indoor unit
and pull the bottom plate towards you. Then the claws are
released from the stationary plate.
(The [PUSH] sections are indicated by 2 arrows in the right
figure)
HOW TO REMOVE INDOOR UNIT
[PUSH] mark positions
2
WARNING
s
s
FINAL STAGE OF INSTALLATION
DROC REW
OP FO NOITCENNOC
WARNING
s THIS APPLIANCE MUST BE EARTHED.
Leave some space in the connecting cord for
maintenance purpose and be sure to secure
it with the cord band.
Secure the connecting cord along the coated part of the wire using
the cord band. Do not exert pressure on the wire as this may cause
overheating or fire.
INSTALLATION OF REFRIGERATING PIPES AND AIR REMOVAL
70mm
10mm
10mm
45mm
1
2
3
Strip
wires
Connecting cord
Green + Yellow
(ground)
Indoor Unit
Connecting
cord
Cord band
After remove the screw
and terminal cover, and
put the connecting cords
and fix the terminal cover
with screw.
Earth
Copper pipe
Trimming tool
s Please check and confirm manuals attached to each
optional parts for more connection details.
s You can refer to this installation manual how to remove
and re-attach the front cover.
s Please be careful not to damage lead wires by edge of
plate when connecting the optional parts.
CN7
CN20
CN6
CN6
CN7
CN21
How to remove the front cover
How to Attach the Front Cover
Check that the drain pan is securely attached.
After installing the front cover onto the unit, hook three claws
at upper side of the cover securely. Then, push the center of
the front cover to lock the claws.
Tighten the three screws.
Install the filter.
1
1
2
Remove the filters.
After removing three screws, pull the center of
the front cover towards you and release the claws.
Pull the side faces (lower sections) of the front
cover towards you as shown in the figure and
remove the cover.
1
1
2
3
2
3
4
5
2
3
4
1
2
Outer A (mm) Rigid Flaring Tool
Diameter (Ø) For R410A tool For R22 tool
6.35 (1/4") 0 - 0.5 1.0
9.52 (3/8") 0 - 0.5 1.0
0 - 0.5 1.012.7 (1/2")
6.35 (1/4”) 13.7 – 18.6 (140 – 190)
)054 – 053( 1.44 – 3.43 )”8/3( 25.9
)”2/1( 7.21
44.1 – 53.9 (450 – 550)
)052 – 002( 5.42 – 6.91 )”4/1( 53.6
)052 – 002( 5.42 – 6.91 )”8/3( 25.9
)053 – 003( 3.43 – 4.92 )”
2/1( 7.21
12.3 – 15.7 (125 – 160)
Valve head
cap
Small diameter side
Large diameter side
Small diameter side
Large diameter side
Valve core cap
Outer diameter
of pipe (ø)
Torque N·m
(kgf·cm)
Remove the front panel
Push the end of the right-side arm outward to
release the tab.
Move the left-side arm outward to release the
left tab, and then pull the panel towards you.
Arm
Arm
Push
Insert the shaft of the left arm along the step on the unit into
the hole.
Securely insert the shaft of the right arm along the step on
the unit into the hole.
Make sure that the front panel is securely attached, and then
close the front panel.
Attaching the Front Panel
Arm
Arm
Step
Step
s
s
s
in below.
s For cable connection to control P.W.B., you need to
remove front cover and electrical box cover.
Each connecting location is as below.
H-LINK RAC Adapter:CN7
Wired Remote Control : CN20
1
2
3
(H-LINK RAC Adapter, Dry contact, Wired Remote
Controller)
Dry contact: CN6
How to connect the optional parts
ler
Wall hole
Pipe
Drain
hose
Cable
Drain layout of
backward piping
from left
Heat
insulation pipe
Refrigerating
pipe
Connecting
cord
PIPING FROM THE LEFT SIDE (BACKWARD, DOWNWARD, HORIZONTAL)
r
RAK-50RPC
RAK-35RPC
Содержание
- Aaa size battery 1
- About 15cm 1
- Above 50mm 1
- After remove the screw and terminal cover and put the connecting cords and fix the terminal cover with screw 1
- Air cleaning mesh 1
- And pull the bottom plate towards you then the claws are released from the stationary plate the push sections are indicated by 2 arrows in the right figure 1
- And re attach the front cover 1
- Attaching the front panel 1
- Backward downward horizontal 1
- Backward piping from left 1
- Bending upwards condensed water 1
- C case 1
- Caution 1
- Ceiling 1
- Close the front panel 1
- Connecting cord 1
- Connecting cords pipe and 1
- Connection 1
- Copper pipe 1
- Cord band 1
- Cover the low cover under the body of the unit and terminal cover 1
- Cutting low cover bush 1
- D n e b t o n ts u m 1
- D r o c r e w 1
- Detail of cutting the connecting cord 1
- Die die 1
- Direct mounting on the wall 1
- Direction of piping 1
- Drain hose 1
- Drain hose cable 1
- Drain hose drain cap 1
- Drain layout of backward piping from left 1
- Dry contact cn6 1
- Each connecting location is as below 1
- Exchange the location of drain hose and drain cap while installing the pipe from the left side as 1
- Figure showing the installation of indoor unit 1
- Final stage of installation 1
- Flare nut 1
- For cable connection to control p w b you need to 1
- For service personnel only 1
- For wire connection of the indoor unit you need to remove the front 1
- From left horizontally piping 1
- From left vertically down from right vertically down from left 1
- From right horizontally piping 1
- Gas leakage inspection 1
- Green yellow ground 1
- H link rac adapter cn7 1
- H link rac adapter dry contact wired remote controller 1
- Hanger 1
- Heat insulation and finish of the piping 1
- Heat insulation pipe 1
- How to attach the front cover 1
- How to connect the optional parts 1
- How to remove indoor unit 1
- How to remove the front cover 1
- Indoor unit 1
- Insert drain cap up to the 1
- Insert the shaft of the left arm along the step on the unit into the hole 1
- Installation after connection of refrigerating pipes 1
- Installation of drain hose 1
- Installation of hanger wall penetration and installation of protection pipe 1
- Installation of remote controller 1
- Installation of the indoor unit 1
- Insulation material for pipe connection 1
- Insulation pipe must be wrapped with vinyl tape at every 120 mm 1
- Insulation sheet 1
- Insulator is insufficient insulator is insufficient please use commercial 1
- Kgf cm 1
- Leave some space in the connecting cord for maintenance purpose and be sure to secure it with the cord band secure the connecting cord along the coated part of the wire using 1
- Lift the body of the unit upwards and then force it downwards 1
- Location securely till the cap stops 1
- M m 0 0 3 t u o b a 1
- Make sure that the front panel is securely attached and then 1
- Mm or more 1
- No item qty 1
- O p f o n o i t c e n n o c 1
- Of pipe ø 1
- Optional parts for more connection details 1
- Outdoor indoor 1
- Outer diameter 1
- Overheating or fire 1
- Pipe connecting cord 1
- Pipe connection 1
- Pipe rubber strap tied with great force 1
- Piping from the left side backward downward horizontal 1
- Piping from the right side 1
- Plate when connecting the optional parts 1
- Please be careful not to damage lead wires by edge of 1
- Please bend at a small radius to form an arc 1
- Please check and confirm manuals attached to each 1
- Please note the following matters and obtain permission from customer before installation 1
- Plug procure locally 1
- Pond condensed water 1
- Preparation of pipe 1
- Procedures of installation and precautions 1
- Products 1
- Projection 1
- Protection pipe 1
- Protection pipe drain hose connecting cord 1
- Protection pipe sleeve of protection pipe 1
- Pull at the 1
- Pull this to the front during the connection of refrigerating pipe to ease task 1
- Push mark positions 1
- Push the end of the right side arm outward to release the tab move the left side arm outward to release the left tab and then pull the panel towards you 1
- Push the pipe deeply until the insulating 1
- Push up the push sections at the bottom of the indoor unit 1
- Refrigerating pipe 1
- Remote control holder 1
- Remote controller 1
- Remote controller holder 1
- Remove front cover and electrical box cover 1
- Remove low cover 1
- Remove the cover from the terminal base and screw the cable 1
- Screw 2 pieces 1
- Screw for hanger 1
- Screw for remote controller holder 1
- Screw screw 1
- Screw the hanger at the positions possibly near the upper and lower hooks where the indoor unit is hung use 4 or more screws to fix the hanger 1
- Seal with putty 1
- Section of the drain hose end gets over the rib at the indoor unit side 1
- Securely insert the shaft of the right arm along the step on 1
- Shown in below be sure to plug in the drain hose until the insulating material folds upon itself 1
- Sleeve of protection pipe 1
- Step step 1
- Strip wires 1
- The choice of mounting site 1
- The connection of refrigerating pipe during the installation of indoor unit 1
- The cord band do not exert pressure on the wire as this may cause 1
- The directions as shown by arrows to remove the cover 1
- The end of the refrigerating pipes are at locations marked with symbol 1
- The front cover towards you and release the claws 1
- The indoor piping should be insulated with the enclosed insulation pipe if the 1
- The unit into the hole 1
- There are 6 directions allowed namely backward piping backward piping 1
- Torque n m 1
- Torque wrench 1
- Trimming tool 1
- Wall hole 1
- Wall penetration and installation of protection pipe 1
- Warnin 1
- Warning 1
- Wasabi nano titanium 1
- Wired remote control cn20 1
- Wiring of the indoor unit 1
- Wrench 1
- You can refer to this installation manual how to remove 1
- _50rpb_im a2 en 1
- Ø m m 4 4 1
- Ø m m 8 4 1
Похожие устройства
- Hitachi RAK-35RPC Каталог кондиционеров Hitachi
- Lelit Gilli PL68 Инструкция по эксплуатации
- Hitachi RAK-50RXB Инструкция по эксплуатации
- Hitachi RAK-50RXB Каталог кондиционеров Hitachi
- Hitachi RAK-25RPB Инструкция по эксплуатации
- Hitachi RAK-25RPB Каталог кондиционеров Hitachi
- Hitachi RAK-50RPC Инструкция по эксплуатации
- Hitachi RAK-50RPC Каталог кондиционеров Hitachi
- Hitachi RAD-18QPB Инструкция по эксплуатации
- Hitachi RAD-18QPB Каталог кондиционеров Hitachi
- Lelit Anna PL41ЕМ Инструкция по эксплуатации
- Lelit Anna PL41ЕМ Каталог оборудования Lelit 2017
- Hitachi RAK-35RXB Инструкция по эксплуатации
- Hitachi RAK-35RXB Каталог кондиционеров Hitachi
- Lelit Anita PL042EM Инструкция по эксплуатации
- Lelit Anita PL042EM Каталог оборудования Lelit 2017
- Hitachi RAK-25RXB Инструкция по эксплуатации
- Hitachi RAK-25RXB Каталог кондиционеров Hitachi
- Lelit Gilda PL41PLUS Инструкция по эксплуатации
- Lelit Gilda PL41PLUS Каталог оборудования Lelit 2017