BCT_T Rev.00 05-2015 pag. 89
6 – SETTING UP
AFTER INSTALLING THE APPLIANCE, WAIT AT LEAST TWO HOURS BEFORE TURNING IT ON.
6.1 – CONNECTIONS
6.1.1 – ELECTRICAL CONNECTION
Electrical connection must be made by a specialised electrician.
Check that the power supply voltage given on the ID plate corresponds to that available at the
installation site.
Connections must be made to current regulations; the supply mains must have an efficient
earthing system compliant with electricity regulations in the country; this is a responsibility of
the customer.
Do not make tight bends on the power lead and do not place any object whatsoever on top of it.
If it is necessary to unplug the mains supply, first make sure the circuit board is on OFF on
the display.
The manufacture declines all responsibility for damage or accidents caused by failure to observe
such regulations.
ELECTRICAL CONNECTION PROCEDURE
The appliance is supplied by the manufacturer complete with power plug. Just connect the power plug to a socket at the
installation site; the system must be carried out to current regulations.
The electricity supply at the installation site must have the following requisites:
Voltage: 230 Vac
Frequency: 50 Hz
6.2 – PRELIMINARY CHECKS
The electrician fitter shall train the operator in the correct use of the blast chiller and give the basic notions of
maintenance.
METHOD
The operations to prepare the blast chiller for initial start-up must be carried out by a specialised engineer, in the
presence of the operator, who can acquire information to carry out certain routine maintenance and cleaning.
Before starting up the appliance, a series of checks and inspections must be carried out for the purpose of preventing
errors or accidents during start-up.
Check that the appliance has not been damaged during transport.
Check with special care for any damage to the electrical box, push button control panel, wiring and pipes.
Check that all external power sources have been connected properly.
Check that the machine is perfectly level.
6.2.1 – REGULATION
Regulation carried out by unauthorized personnel may damage the appliance and expose the
operator to serious hazards. Regulation carried out by unauthorized personnel is considered
tampering with the appliance and as such null the warranty and relieve the manufacturer of any
responsibility.
Содержание
- Bct 05 bct 10 bct 15 bct 24 1
- Istruzioni d uso instructions for use 1
- Serie new runner 1
- Sommario index 3
- Messa in opera 23 4
- Setting up setting up 89 4
- Use use 90 4
- Uso 25 4
- Alimentation électrique câble 3x1 m 10
- Alimentazione elettrica cavo 3x1 m 10
- Avec fiche schuko l 4000 mm 10
- Bct 05 10
- Completo di spina schuko l 4000 mm 10
- Descrizione della macchina 2 dati tecnici 10
- Electricity supply 3x1 m 10
- Elektrischer stromanschluss kabel 3x1 5 m 10
- Fig 2 a 10
- Komplett mit schukostecker l 4000 mm 10
- Wire complete with schuko plug l 4000 mm 10
- Alimentation électrique câble 3x1 m 11
- Alimentazione elettrica cavo 3x1 m 11
- Avec fiche schuko l 4000 mm 11
- Bct 10 11
- Completo di spina schuko l 4000 mm 11
- Electricity supply 3x1 m 11
- Elektrischer stromanschluss kabel 3x1 5 m 11
- Fig 2 b 11
- Komplett mit schukostecker l 4000 mm 11
- Wire complete with schuko plug l 4000 mm 11
- Alimentation électrique câble 5x1 m 12
- Alimentazione elettrica cavo 5x1 m 12
- Avec fiche schuko l 4000 mm 12
- Bct 15 12
- Completo di spina schuko l 4000 mm 12
- Electricity supply 5x1 m 12
- Elektrischer stromanschluss kabel 5x1 5 m 12
- Fig 2 c 12
- Komplett mit schukostecker l 4000 mm 12
- Wire complete with schuko plug l 4000 mm 12
- Alimentation électrique câble 5x1 m 13
- Alimentazione elettrica cavo 5x1 m 13
- Avec fiche schuko l 4000 mm 13
- Bct 24 13
- Completo di spina schuko l 4000 mm 13
- Electricity supply 5x1 m 13
- Elektrischer stromanschluss kabel 5x1 5 m 13
- Fig 2 d 13
- Komplett mit schukostecker l 4000 mm 13
- Wire complete with schuko plug l 4000 mm 13
- General information thank you for choosing a blast chiller of our production read this manual very carefully and make sure it is available to those who will install use and maintain the equipment 1 marking the id plates are located on the outside of the appliance in the bottom right hand corner of the front fig 1 below shows copies 73
- Bct 05 77
- Machine description 2 technical data 77
- Bct 10 78
- Bct 15 79
- Bct 24 80
- Foreword 91
- Switching the device on off 92
Похожие устройства
- Gemm BCB/03 (встр. агрегат) Инструкция по эксплуатации
- Gemm BCT/24 (встр. агрегат) Инструкция по эксплуатации
- Gemm BCT/10 (встр. агрегат) Инструкция по эксплуатации
- Gemm BCB/10 (встр. агрегат) Инструкция по эксплуатации
- Gemm BCB/15 (встр. агрегат) Инструкция по эксплуатации
- Gemm WL5/126S Инструкция по эксплуатации
- Gemm BCB/10P (встр. агрегат) Инструкция по эксплуатации
- Gemm BCT/15 (встр. агрегат) Инструкция по эксплуатации
- Gemm AFBV/70 Инструкция по эксплуатации
- Gemm AFB/70 Инструкция по эксплуатации
- Gemm AFB/60 Инструкция по эксплуатации
- Gemm BCB/05P (встр. агрегат) Инструкция по эксплуатации
- Gemm AFB/140 Инструкция по эксплуатации
- Gemm EFN/01 Инструкция по эксплуатации
- Gemm EFN/02 Инструкция по эксплуатации
- Gemm EFNV/02 Инструкция по эксплуатации
- Gemm AFB/120 Инструкция по эксплуатации
- Gemm EFB/02 Инструкция по эксплуатации
- Smeg SF4750VCAO Инструкция по эксплуатации
- Kovinastroj (Kogast) EKT-40-DI Инструкция по эксплуатации