Mahlkoenig Tanzania [11/28] Positioning the machine

Mahlkoenig Tanzania [11/28] Positioning the machine
|
LADENMÜHLEN SHOP GRINDER
6 Installing the machine
Remove any adhesive tapes and remaining packaging.
6.1 Installation
Procedure:
1. Decide where the machine’s final position will be.
2. Fit the support surface for the Coffee Grinder. Make sure that the sup-
port surface for the machine is flat and stable. Ideal support height
for the machine: 750 mm (30”) from the floor.
6.2 Installing the collecting tray
Place the collecting tray (1) onto the two mounting brackets (2).
A ( 2 : 1 )
A
1
2
3. If you discover transport damage, notify both the transport and dis-
patching companies immediately. Please refer to the chapter 14 en-
titled “Contact addresses” for the address and contact numbers of the
machine manufacturer.
Make a photographic record of the damage. In addition, retain all the
packaging material to assist any further clarifications!
4. Place the machine in its final position.
The dimensions of the packaging material match those of the machine.
We recommend that you store this material in a dry place for any future
transport.
5 Positioning the machine
5.1 Installation site requirements
The installation site must be dry and well ventilated. Always install the
grinder on a flat, nonskid surface to ensure that it can neither fall over
nor slide.
HINT
Keep the machine out of the reach of children. Children do not recognize
the dangers associated with electrical equipment.
The mains plug has to be easily accessible after installation!

Содержание

Похожие устройства

Скачать