Airwell SLS 1602 [22/77] Checking the operation

Airwell SLS 3402 [22/77] Checking the operation
Page 21
English
Start-up
5.3 Checking the operation
Check the following:
I
The temperature of the water entering the evapo-
rator.
I
The temperature of the water leaving the evapora-
tor.
I
The level of the water flow rate in the evaporator,
if possible.
I
The current absorption upon the start of the com-
pressor and in case of stabilised operation.
I
The fan’s current absorption.
Check that the condensing and evaporation temper-
atures, during operation at high and low pressure
detected by the pressure gauges of the refrigerant,
are within the following range:
(On the units not provided with HP/LP pressure
gauges for the refrigerant, connect a pressure gauge
to the Schreader valves on the refrigeration circuit).
5.4 Delivery to the customer
I
Train the user according to the instructions provid-
ed in Section 6.
HP side
Approx. 15 to 21°C above the
temperature of the air entering the
condenser, for R134a units.
LP side
Approx. 2 to 7°C below the tem-
perature of the leaving chilled wa-
ter, for R134a units.
SLS1-en.qxp 29-06-2007 15:37 Pagina 21

Содержание

Скачать