Airwell SWS 1902 HFС 407C [21/82] Start up

Airwell SWS 2202 HFС 134a [21/82] Start up
Page 20
Start-up
5.3 Checking the operation
Check the following:
I
The temperature of the water entering the evapo-
rator.
I
The temperature of the water leaving the evapora-
tor.
I
The level of the water flow rate in the evaporator,
if possible.
I
The current absorption upon the start of the com-
pressor and in case of stabilised operation.
Check that the condensing and evaporation temper-
atures, during operation at high and low pressure
detected by the pressure gauges of the refrigerant,
are within the following range:
(On the units not provided with HP/LP pressure
gauges for the refrigerant, connect a pressure gauge
to the Schreader valves on the refrigeration circuit).
5.4 Delivery to the customer
I
Train the user according to the instructions provid-
ed in Section 6.
HP side
Approx 7 to 11°C above the inlet
water teperature of condenser, for
R407C units; approx 2 to 5°C
above the inlet water temperature
of condenser, for R134a units.
LP side
Approx 3.5 to 5°C below the tem-
perature of the leaving chilled wa-
ter, for R407C; approx 3.5 to 6°C
below the temperature of the leav-
ing chilled water, for R134a units.