Chillers ULTIMA FREECOOL
Chillers
Installation & Maintenance Manual : 903-125 IM E 05/04/A
31
Commissioning Data
ELECTRICAL DATA
Compressor Start-Up
Information
642
642642
L1
L2
L3
PE
531
OL1
6
5
4
3
CP1
2
1
6
5
4
3
CP3
2
1
6
5
4
3
CP5
2
153
CP7
1
POWER
FACTOR
CORRECTION
CAPACITOR
53
PF1
1
RED
YEL
BLU
CB1
6
5
4
3
2
1
CLIENTS
INCOMING
SUPPLY
400/3/50
WU
PRR1
V
PHASE
ROTATION
RELA
Y
6
5
CB2
4
3
2
1
14
12
11
14
12
11
E
COMPRESSOR
3~
X
Z
Y
U
V
W
M1
RED
YEL
BLU
POWER
FACTOR
CORRECTION
CAPACITOR
RED
YEL
BLU
RED
YEL
BLU
RED
YEL
BLU
RED
YEL
BLU
RED
YEL
BLU
RED
YEL
BLU
POWER FACTOR CORRECTION
OPTIONAL EXTRA
CLOSED TRANSITION START
OPTIONAL EXTRA
Starting Sequence (Star-
Delta Starting)
CP5
On
CP1
On
CP5
Off
CP3
On
5 Sec ± 1
(1)
< 40 ms
Star
Delta
(1) 0.7 seconds when Closed Transition optional extra selected.
OPERATIONAL SEQUENCE
Refrigerant Charge
Liquid refrigerant should be charged into the condenser before compressor starting to
ensure that refrigerant is present at compressor start-up.
Crankcase Heater
The mains supply to the crankcase (oil) heater should be switched on at least 8 hours
prior to compressor starting to avoid refrigerant migration.
CAUTION
A separately fused, locally isolated, permanent single phase and neutral supply
MUST BE FITTED
for the compressor sump heater, evaporator trace heating and
control circuits, FAILURE to do so could INVALIDATE WARRANTY
.
Pre-Start-Up Check
Before compressor start-up, make sure that an oil level is showing in the compressor
sight glass, and that all refrigerant ball valves are opened.
Checks at Compressor
Start-up
As soon as the compressor starts, make sure that the solenoid valve for liquid injection
opens, and that the suction and liquid/discharge pressure gauges are showing low and
high pressures respectively.
If there is no liquid present or no differential pressure occurs, isolate immediately.
CAUTION
Check phase rotation by connecting pressure gauges to the suction and
discharge ports.
Liquid Injection - Never shut down the liquid injection circuit whilst the compressor
is still running, at any loading condition as this may permanently damage
the compressor.