Primula ECOVAPOR [5/15] Operating instructions
![Primula ECOVAPOR [5/15] Operating instructions](/views2/1499844/page5/bg5.png)
5
* Attention !
- Any thermal intervention or welding to the boiler No 1, without being advised by
the manufacturer, is strictly forbidden.
(In that case, the manufacturer does not have any responsibility).
- Any modification to the technical specifications of the machine(electrical or
mechani- cal) is strictly forbidden to the third persons.
(In that case the manufacturer does not have any responsibility).
Fill the feedwater tank of 25lt(No 01) with clear water, using preferably soft water
(up to 8 dh hardness).Turn on the main switch(No 02).Press the button No 03 .The
water pump starts to feed water into the boiler and the lamp No 04 is on. The steam
lamp No 05 will be lighted after a while.During operation the boiler refills
automatically.
Within a few seconds the boiler starts heating the water in order to supply steam in
about 15-20 min. The manometer(No 06) should reach 3,5 bars. The machine is ready
to work.Press the irons button(s)(No 07 ), only one button if the requested produced
steam is for 1 steam iron, or both buttons if the requested produced steam is for 2
steam irons.(That depends on whether you have Ecovapor for steam supply for one
or two irons). Adjust the temperature of the iron using the thermostat knob,
according to the fabric requirements. Adjust the steam quantity by the adjustor knob
(No 08 ) ac- cording to the fabric requirements. You can start ironing!
Operating instructions
Содержание
- Ecovapor 1
- Instruction manual 1
- Admissible design pressure 6 2 bars 3
- All specifications have been made to the best of our knowledge specifications may be subject to change without any prior notice 3
- Blue neutral wire green yellow earth wire brown or black phase 3
- Boiler capacity 8 5lt 3
- Caution please read carefully the instruction manual before installing the steam generator 3
- Condensate tank 10lt 3
- Electric connections neutral wire and earth wire separate according to vde regulations 3
- Feeding water tank 25lt 3
- For all 5 models 3
- Heating up time ca 15 20 minutes 3
- Max boiler s water capacity 4lt 3
- Max working pressure 4 2 bars 3
- Min boiler s water capacity 3 5lt 3
- Models technical specifications 3
- Normal working pressure 3 5 bars 3
- Steam temperature 3 5bars 14 3
- Wiring according to european specifications 3
- A few words by the manufacturer 4
- Electrical connection 4
- Installation 4
- Remarkable advantages 4
- Operating instructions 5
- After you finishing working 6
- Test the good operation of the machine 6
- Maintenance 7
- Troubles shooting 7
- Wiring diagram steam generator ecovapor 14
Похожие устройства
- Primula VAPORMAT Руководство по эксплуатации
- Primula MA 1140 Руководство по эксплуатации
- Primula AU 1140 Руководство по эксплуатации
- Lelit PS 21 Руководство по эксплуатации
- Lelit PG029N Руководство по эксплуатации
- Lelit PS 20 Руководство по эксплуатации
- Lelit PS 05B Руководство по эксплуатации
- Lelit PS 09N Руководство по эксплуатации
- Lelit PS 325 Руководство по эксплуатации
- Lelit PG 029N35 Руководство по эксплуатации
- Lelit PG 027 Руководство по эксплуатации
- Lelit PG 029N Руководство по эксплуатации
- Lelit PG 036 Руководство по эксплуатации
- Lelit PGAUTO5N Руководство по эксплуатации
- Lelit PGAUT09 Руководство по эксплуатации
- Lelit PG1 Руководство по эксплуатации
- Lelit PA 013 Руководство по эксплуатации
- Lelit PA 71N Руководство по эксплуатации
- Lelit KS200/D Руководство по эксплуатации
- Lelit PUS200/D Руководство по эксплуатации
Скачать
Случайные обсуждения