SPECK Pumpen IN-VB 10-10 F — руководство по пуску и остановке насосного оборудования [71/100]
![SPECK Pumpen IN-VB-S 60-10 [71/100] Commissioning decommissioning](/views2/1622751/page71/bg47.png)
Commissioning/Decommissioning
11|2018 EN 21
6 Commissioning/Decommissioning
6.1 Commissioning
NOTICE
The pump/unit can be damaged if it runs dry!
Ensure that the pump/unit is always full of water. This also applies to checking the rotation
direction.
6.1.1 Pre-requisites for commissioning
• Electrical connection is available.
• Pump/unit is filled with pumped fluid.
• Pump/unit is positioned correctly.
• Additional connections are assembled and working.
• Before commissioning turn the shaft by hand and check for smooth running.
• Ensure that all preservatives are completely removed from the wetted parts. If necessary
disassemble the pump and clean the parts individually.
– Pumps with thrust bearing housing:
• Axial clearance between thrust bearing housing and motor shaft is set correctly.
• Thrust bearing housing is lubricated – for design with grease nipples.
6.1.2 Filling pump/unit with pumped fluid and ventilating
NOTICE
The pump can be damaged if it runs dry!
Shut-off valves may not be closed during the filling procedure.
Ensure that the pump/unit is always full of water.
Filling up with an open or closed circulation system with sufficient supply pressure (intake mode)
WG56.00.007-P
A
B
C
Fig. 8
A Shut-off valve suction line B
Shut-off valve pressure line
C Filling plug G 3/8
1. Close the shut-off valves (A and B) in the suction and pressure lines.
2. Open the filling plug (C).
3. Open the shut-off valve in the suction line (A) gradually until the pumped fluid flows out of the filling
plug (C).
4. Spin the pump shaft over the motor shaft (impeller fan) several times when filling.
5. Close the filling plug (C).
6. Open the shut-off valves (A and B) in the suction and pressure lines.
Pay attention to the pump’s correct direction of rotation.
Содержание
- In vb in vb s p.1
- Inhaltsverzeichnis p.5
- Glossar p.8
- Umgang mit dieser anleitung p.9
- Mitgeltende dokumente p.9
- Zu diesem dokument p.9
- Zielgruppe p.9
- Unvollständige maschine p.9
- Bestimmungsgemäße verwendung p.10
- Sicherheitsvorschriften p.10
- Sicherheit p.10
- Personalqualifikation p.10
- Schutzeinrichtungen p.11
- Schilder p.11
- Restrisiken p.11
- Bauliche veränderungen und ersatzteile p.11
- Vermeidung von sachschäden p.12
- Störungen p.12
- Beschreibung p.14
- Benennung p.14
- Funktion p.14
- Typenschild p.15
- Ausführung p.15
- Produktinformationen gemäß verordnung 547 2012 für wasserpumpen mit maximaler wellenleistung von 150 kw zur richtlinie 2009 125 eg öko design richtlinie p.16
- Pumpe anheben p.17
- Transport und zwischenlagerung p.17
- Transport p.17
- Rücksendung p.18
- Lagerung p.18
- Rohrleitungen p.19
- Installation p.19
- Einbauort p.19
- Aufstellung p.20
- Elektrischer anschluss p.21
- Drehrichtung prüfen p.21
- Überlastschutzeinrichtung p.22
- Inbetriebnahme außerbetriebnahme p.23
- Inbetriebnahme p.23
- Außerbetriebnahme p.26
- Übersicht p.27
- Störungen p.27
- Wartung während des betriebes p.29
- Wartung instandhaltung p.29
- Schmierung p.29
- Instandhaltungsarbeiten p.29
- Entleeren p.30
- Demontage der pumpe anlage p.30
- Pumpe anlage montieren p.34
- Schraubenanzugsmomente p.36
- Gewährleistung p.37
- Ersatzteile p.37
- Entsorgung p.38
- Maßzeichnung 10 maßzeichnung p.39
- In vb s v p.39
- In vb s f p.39
- In vb s p.39
- 2018 de 37 p.39
- Technische daten p.39
- Technische daten p.40
- De 11 2018 p.40
- Technische daten p.41
- 2018 de 39 p.41
- Technische daten p.42
- De 11 2018 p.42
- Technische daten p.43
- 2018 de 41 p.43
- Technische daten p.44
- De 11 2018 p.44
- Technische daten p.45
- 2018 de 43 p.45
- Schnittzeichnung p.46
- En translation of original operation manual in vb in vb s p.51
- Table of contents p.53
- Glossary p.56
- Using this manual p.57
- Target group p.57
- Other applicable documents p.57
- Incomplete machine p.57
- About this document p.57
- Safety regulations p.58
- Safety p.58
- Personnel qualification p.58
- Intended use p.58
- Structural modifications and spare parts p.59
- Residual risk p.59
- Protective equipment p.59
- Preventing material damage p.60
- Faults p.60
- Description p.62
- Function p.62
- Designation p.62
- Name plate p.63
- Design p.63
- Product information according to 547 2012 for water pumps with a maximum shaft performance of 150 kw for the 2009 125 eg standard eco design guidelines p.64
- Transport and intermediate storage p.65
- Transport p.65
- Lifting the pump p.65
- Storage p.66
- Returns p.66
- Installation p.67
- Installation site p.67
- Installation p.68
- Electrical connection p.69
- Check the direction of rotation p.69
- Current p.70
- Overload protection device p.70
- Commissioning decommissioning p.71
- Commissioning p.71
- Decommissioning p.74
- Overview p.75
- Faults p.75
- Maintenance work p.77
- Maintenance during operation p.77
- Maintenance p.77
- Lubrication p.77
- Draining p.78
- Disassembling of the pump unit p.78
- Assembling pump unit p.82
- Screw tightening torque p.84
- Warranty p.85
- Spare parts p.85
- Disposal p.86
- Technical data p.87
- In vb s v p.87
- In vb s f p.87
- In vb s p.87
- Dimensional drawing 10 dimensional drawing p.87
- 2018 en 37 p.87
- Technical data p.88
- En 11 2018 p.88
- Technical data p.89
- 2018 en 39 p.89
- Technical data p.90
- En 11 2018 p.90
- Technical data p.91
- 2018 en 41 p.91
- En 11 2018 p.92
- Technical data p.92
- Technical data p.93
- 2018 en 43 p.93
- Sectional drawing p.94
- Eg konformitätserklärung p.100
Похожие устройства
-
SPECK Pumpen IN-VB-S-V 6-90Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-90Инструкция по эксплуатации -
SPECK Pumpen IN-VB-S-V 6-80Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-80Инструкция по эксплуатации -
SPECK Pumpen IN-VB-S-V 6-70Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-70Инструкция по эксплуатации -
SPECK Pumpen IN-VB-S-V 6-60Инструкция по эксплуатации -
SPECK Pumpen IN-VB-S-V 6-60Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-50Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-50Инструкция по эксплуатации -
SPECK Pumpen IN-VB-S-V 6-40Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-40Инструкция по эксплуатации
Узнайте, как правильно запустить и остановить насосное оборудование. Следуйте инструкциям по заполнению, проверке и обслуживанию для предотвращения повреждений.