Daikin EWWD800CJYNN [24/28] Appendix 2 unit start up sequence

Daikin EWWD480CJYNN [24/28] Appendix 2 unit start up sequence
24
Appendix 2: Unit start-up sequence
In the following paragraphs, the unit start-up, management and shutdown procedures are shown. In addition to this, the
compressors loading and unloading strategy is shown.
Unit Startup request
Evaporator and condenser pump startup
Evaporator flow switch consent within 20 s
(manufacturer set)
30s waiting (user set)
PID operation start
30s waiting
Compressors start enabled
PID requires LOAD
PID requires STANDBY
PID requires UNLOAD
NO UNIT ALARM 005
(Evap Flow Alarm)
YES
A new compressor is required
No new compressor
required
The compressor with lower
working hours is selected
Liquid solenoid opening
3s waiting
Compressor Start
Transition confirm
within 10 s
8s compressor unloading
Compressor enabled to load
COMPRESSOR ALARM 008
(Transition fault)
NO
YE
S
Compressors loading
Compressor stop required
Compressor complete unloading (max 30s)
Luiquid solenoid closing
Low pressure alarm disabling
Expansion valve closing
Line relay opening
Waiting for the evaporating pressure
setpoint is reached (with a maximum time)
No compressor stop
required
Compressors unloading
Unit startup and compressors management