Daikin EWWD500J-SS [5/11] D eimwc01006 11eu 6 192
![Daikin EWWD280J-SS [5/11] D eimwc01006 11eu 6 192](/views2/1661789/page5/bg5.png)
D - EIMWC01006-11EU - 6/192
Condenser Leaving
Water Temperature (°C)
• BMS-Connection (MODBUS, BACNET, LON)
Features
• Glycol application for leaving evaporator water
temperature down to –10°C
• Sight glass with moisture indication
• Voltage free contacts
• general operation/pumpcontact
• alarm
(1) Refer to the engineering data book for the complete list of specifications,
options and features.
• Changeable voltage free contacts
• condenser pump
• Changeable remote inputs
• remote start/stop
• dual setpoint
• enable/disable capacity limitation
• Changeable analog input
• Setpoint override 4/20 mA
• Multiple language selection
Standard supplied accessories
Filter kit for installation in front of the evaporator
water inlet
OPERATION RANGE
15
20
25
30
35
40
45
50
55
60
65
-12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1
2
3
1
2
3
Evaporator Leaving Water Temperature (°C)
1 Operation with Glycol - ICE LWE MODE
2 Operation with Glycol (below 4°C Evap LWT)
3 Some units can work partialized
in this area
MAIN COMPONENTS
Compressor
Evaporator
Condenser
(only for EWWD J)
Switchbox
Air purge condenser
(only for EWWD J)
Water drain condenser
(only for EWWD J)
Charge valve
Safety valve
High pressure switch
Drier
Chilled water in
Chilled water out
Condenser water in
(only for EWWD J)
Condenser water out
(only for EWWD J)
Entering water temperature sensor (EEWT)
Leaving water temperature sensor (EWLT)
Discharge stopvalve
Condenser entering water temperature sensor
(only
for EWWD J)
Digital display controller
Emergy Stop
Power supply intake
Field wiring intake
Eyebolts for lifting
Transportbeam
Ballvalve liquid pipe
Main isolator switch
Filter
(only for EWWD J)
Flowswitch
(only for EWWD J)
SELECTION OF LOCATION
The units are designed for indoor installation and should
be installed in a location that meets the following
requirements:
1. The foundation is strong enough to support the
weight of the unit and the floor is flat to prevent
vibration and noise generation.
2. The space around the unit is adequate for
servicing.
3. There is no danger of fire due to leakage of
infiammable gas.
4. Select the location of the unit in such a way that the
sound generated by to the unit does not disturb
anyone.
5. Ensure that water cannot cause any damage to the
location in case it drips out the unit.
NOTE Pull-down operation is restricted to one
hour maximum.
INSPECTING AND HANDLING THE UNIT
At delivery, the unit should be checked and any damage
should be reported immediately to the carrier claims
agent.
When handling the unit, take into account the following:
1. List the unit preferably with a crane and belts in
accordance with the instructions on the unit.
The length of the ropes (1) to be used for lifting are
4 m minimum each.
2. The unit is shipped with wooden beams (2) under it,
these have to be removed before installation.
NOTE Try to reduce the drilling in the unit to a
minimum. It drilling is impreventable,
remove the iron filling thoroughly in order
to prevent surface rust.
Содержание
- Installation operation and maintenance manual 1
- Water cooled screw chillers ewwd120j ss ewwd560j ss condenserless water cooled screw chillers ewld110j ss ewld530j ss refrigerant r 134a 1
- D eimwc01006 11eu 4 192 3
- Ewwd120j ss 280j ss ewld 110j ss 265j ss 3
- Ewwd310j ss 560j ss ewld 290j ss 530j ss 3
- Label identification 3
- Contents content 4
- D eimwc01006 11eu 5 192 4
- Electrical specification 4
- Introducion 4
- Options 4
- Options and feature 4
- Technical specification 4
- D eimwc01006 11eu 6 192 5
- Features 5
- Inspecting and handling the unit 5
- Main components 5
- Operation range 5
- Selection of location 5
- Air or dirt gets in the water circuit problems may occur therefore always take into account the following when connecting the water circuit 6
- D eimwc01006 11eu 7 192 6
- Ewld j version connecting the refrigerant circuit this product is factory charged with 6
- Important information regarding the refrigerant used 6
- Leak test and vacuum drying 6
- The units are equipped with a refrigerant inlet discharge side and a refrigerant outlet liquid side for the connection to a remote condenser this circuit must be provided by a licensed technician and must comply with all relevant european and national regulations precautions when handling piping 6
- Unpacking and placing the unit 1 remove the wooden beams from the unit 2 install vibration mountings in case of an installation where noise and vibration might an impediment 3 set the unit on a solid and level foundation the unit should be installed on a solid base it is recommended to fix the unit on a concrete base with anchor bolts 6
- Air or dirt gets in the water circuit problems may occur therefore always take into account the following when connecting the water circuit 7
- Charging the unit 7
- D eimwc01006 11eu 8 192 7
- Fine tuning of refrigerant charge while unit is in operation 7
- Preparing checking and connecting the water circuit the units are equipped with a water inlet and water outlet for connection to a chiller water circuit this circuit must be provided by a licensed technician and must comply with all relevant european and national regulations 7
- Preparing the unit for connection to the water circuit 7
- Superheat must be between 3 and 8 k subcooling must be between 3 and 8 k 4 verify the oil sightglass level must be within the sightglass 4 verify the liquid line sightglass it should be sealed and not indicate moisture in the refrigerant 4 as long as the liquid line sightglass is not sailed add refrigerant in steps of 1 kg and wait until the 7
- Water inlet of the evaporator 2 flowswitch 3 inlet water sensor 4 water inlet pipe containing the flowswitch and the water inlet temperature sensor 5 victaulic coupling 6 counter pipe 7 field water pipe circuit 8 filter 9 filter and cup 7
- D eimwc01006 11eu 9 192 8
- Water charge flow and quality 8
- Connection of the watercooled water chiller power supply 1 using the appropriate cable connect the power circuit to the l1 l2 and l3 terminals of the unit 2 connect the earth conductor yellow green to the earthing terminal pe 9
- D eimwc01006 11eu 10 192 9
- Discharge from pressure relief devices 9
- Field wiring 9
- Parts table 9
- Piping insulation 9
- Power circuit and cable requirements 1 the electrical power supply to the unit should be arranged so that it can be switched on or off independently of the electrical supply to other items of the plant and equipment in general 2 a power circuit must be provided for connection of the unit this circuit must be protected with the required safety devices i e a circuit breaker a slow blow fuse on each phase and an earth leak detector recommended fuses are mentioned on the wiring diagram supplied with the unit 9
- D eimwc01006 11eu 11 192 10
- D eimwc01006 11eu 12 192 11
- Legend 1s compressor status 1 2s compressor status 2 al analog inputs ao analog output c 3w condenser 3 way valve c l current limit cfs condensator flow switch cle current limit enable cp vfd condenser pump vfd d l demand limit di digital inputs 11
Похожие устройства
- Daikin EWWD500J-SS Технические данные
- Daikin EWWD530J-SS Технические данные
- Daikin EWWD530J-SS Инструкция по эксплуатации
- Daikin EWWD540J-SS Инструкция по эксплуатации
- Daikin EWWD540J-SS Технические данные
- Daikin EUWAN5KBZW1 Технические данные
- Daikin EUWAN8KBZW1 Технические данные
- Daikin EUWAN10KBZW1 Технические данные
- Daikin EUWAN12KBZW1 Технические данные
- Daikin EUWAN16KBZW1 Технические данные
- Daikin EUWAN20KBZW1 Технические данные
- Daikin EUWAN24KBZW1 Технические данные
- Daikin EUWAP5KBZW1 Технические данные
- Daikin EUWAP8KBZW1 Технические данные
- Daikin EUWAP10KBZW1 Технические данные
- Daikin EUWAP12KBZW1 Технические данные
- Daikin EUWAP16KBZW1 Технические данные
- Daikin EUWAP20KBZW1 Технические данные
- Daikin EUWAP24KBZW1 Технические данные
- Daikin EUWAB5KBZW1 Технические данные