Daikin EWAH240TZ-SSB1 [16/102] Electrical options on request

Daikin EWAH600TZ-SRB2 [16/102] Electrical options on request
15/100
OPTIONS
Electrical options On request
Energy meter (including current limit) (opt. code 16a)
Device installed inside the control box that displays all chiller electrical power parameters at line input such as
line voltage and phase current, input active and reactive power, active and reactive energy, including current
limit option. An integrated RS485 module allows a Modbus communication to an external BMS.
Speedtrol (opt. code 42) - Opt. incompatibility 99a-142.
Continuous fan speed regulation on the first fan (VFD driven) of each circuit. It allows unit operation down to -
18ºC (available only for SILVER version).
For GOLD and PLATINUM series the operation down to -18°C is allowed without additional options.
Evaporator flow switch (opt. code 58)
Supplied separately to be wired and installed on the evaporator water piping (by the customer). The installation
of the flow switch in mandatory.
Compressors circuit breakers (opt. code 95)
Safety devices that include in a single device all safety functions otherwise provided by standard fuses and
optional thermal relays, such as protection against overcurrent, overload, current unbalance - Opt. incompatibility
11.
Fans speed regulation (INVERTER) (opt. code 99a provided as standard on GOLD series)
Available on Silver series as option.
Not available on Platinum series that provides the EC fans as standard.
Opt. incompatibility 42-142.
Ground fault relay (opt. code 102)
To shut down the entire unit if a ground fault condition is detected.
Rapid restart (opt. code 110)
Rapid Restart is the ideal solution for those application where we cannot afford the loose of cooling such as data
centers, health care facilities, process cooling …etc. For this kind of applications, in case of a power failure, chiller
equipment are required to restore the cooling supply to the system as fast as possible. Standard unit (without
the Rapid Restart option) will be starting within 310 seconds after the power is restored and it will be reaching
full load cooling capacity within 20 ÷ 25 minutes (obviously depending on the load demand). Rapid Restart option
includes an UPS unit for the chiller controller allowing the chiller to start in 10 seconds after power is restored
and to reach full load cooling capacity in less than 3 minutes from the unit restart.
For more details about this option please refer to the Control Manual.
Inverter kit for pumps:
-
INVERTER KIT FOR 1 CENTR PUMP LOW LIFT (opt. code 120e) opt. incompatibility 120f120g-120 h.
-
INVERTER KIT FOR 1 CENTR PUMP HIGH LIFT (opt. code 120f) opt. incompatibility 120f120g-120 h.
-
INVERTER KIT FOR 2 CENTR PUMP LOW LIFT (opt. code 120g) opt. incompatibility 120f120g-120 h.
-
INVERTER KIT FOR 2 CENTR PUMP HIGH LIFT (opt. code 120h) opt. incompatibility 120f120g-120 h.
note: the Inverter kit must be associated with the corresponding hydronic kit (opt.code 78/79/80/81).
The inverter kit can be used for the following purposes:
- Tuning the water flow during unit commissioning.
- Control the pump speed via external input from Building Management System (BMS)
For this application a 0-10V signal for the pump speed must be provided from the plant manager according to
the specific control strategy of the plant. The water must be within the minimum and maximum value allowed for
the unit (refer to the “Operating limit” chapter). The change in water flow rate must not be exceed more than
10% of the design water flow rate per minute.
- Set a “thermostat off” pump speed. Providing the unit with the inverter kit for the on-board pump is possible
to manage two different water flow settings. A setting for water flow during the "Thermostat ON" mode (when
the chiller is actually providing cooling to the plant), and a set for the “thermostat off” mode (when the plant load
is satisfied and the compressors are waiting to start). This feature allows to achieve energy saving on plant
operating cost by reducing the speed of the pumps when the chiller has reached the set point.

Содержание

Скачать