Daikin EKEQMCBV3 [4/299] Part 5 control box ekeq cbv3 9

Daikin EKEQMCBV3 [4/299] Part 5 control box ekeq cbv3 9
ESiEN09-06
ii Table of Contents
5.2 Demand Operation.................................................................................43
5.3 Heating Operation Prohibition ................................................................43
6. Outline of Control ..................................................................................44
6.1 Thermostat Sensor in Remote Control (only for Z-control) ....................44
6.2 .......................................Hot Start Control (In Heating Operation Only)45
6.3 Freeze Prevention ..................................................................................46
6.4 Low Outdoor Air Temperature Protection Control ..................................47
Part 5 Control Box EKEQ - CBV3 ................................................ 49
1. Different Systems with their Control Boxes...........................................50
1.1 System A: PAIR......................................................................................50
1.2 System B: MULTI ...................................................................................52
2. X, Y, Z Control.......................................................................................55
2.1 X-Control ................................................................................................55
2.2 Y-Control ................................................................................................56
2.3 Z-Control ................................................................................................57
3. Wiring Diagram of Control Box..............................................................58
3.1 D-box......................................................................................................58
3.2 F-box ......................................................................................................59
4. Attention Points .....................................................................................60
5. System A: EKEQF & EKEQD-box: Installation and Operation Manual.61
6. System B: EKEQM-box: Installation and Operation Manual .................76
Part 6 Test Operation ................................................................. 89
1. Test Operation ......................................................................................90
1.1 Installation Process ................................................................................90
1.2 Procedure and Outline ...........................................................................91
1.3 Operation When Power is Turned On ..................................................104
2. Outdoor Unit PC Board Layout ...........................................................105
3. Field Setting ........................................................................................106
3.1 Field Setting from Remote Control .......................................................106
3.2 Field Setting from Outdoor Unit............................................................114
Part 7 Installation and Operation Manual ................................ 137
Part 8 Troubleshooting ............................................................. 169
1. Symptom-based Troubleshooting .......................................................171
2. Troubleshooting by Remote Control ...................................................174
2.1 The INSPECTION / TEST Button.........................................................174
2.2 Self-diagnosis by Wired Remote Control .............................................175
2.3 Remote Control Service Mode .............................................................176
2.4 Remote Control Self-Diagnosis Function .............................................178
3. Troubleshooting by Indication on the Remote Control ........................185
3.1 “A0” AHU: Error of External Protection Device.....................................185
3.2 “A1” AHU: PC Board Defect .................................................................186
3.3 “A3” AHU: Malfunction of Drain Level Control System (S1L) ...............187
3.4 “A6” AHU: Fan Motor (M1F) Lock, Overload........................................189
3.5 “A9” AHU:
Malfunction of Moving Part of Electronic Expansion Valve (Y1E)
.190
ESiEN09-06.pdf 2 2/16/2010 4:42:24 PM

Содержание

Скачать