Daikin R2CND024A4AA [23/28] Installation
![Daikin R2TND012A4AA [23/28] Installation](/views2/1796825/page23/bg17.png)
4 Installation
Installation manual
23
R2CND024A4AA + R2TND012~024A4AA
Wall-mounted condensing boiler
3P469346-4E – 2017.07
Flue part Order code
Extension flex PP 80mm 10m EKFGP6340
15m EKFGP6344
25m EKFGP6341
50m EKFGP6342
Connector flex - flex PP 80 EKFGP6324
Spacer PP 80 to 100mm EKFGP6333
90° elbow 60mm DR90ELBOW60AA
45° elbow 60mm DR45ELBOW60AA
Extension duct 60mm 500mm DREXDUC0500AA
1000mm DREXDUC1000AA
B33 flue kit DRB33FLUKITAA
4.9 To fill the system with water
CAUTION
Water filling must be done while the boiler is in standby
mode.
Method 1
(For models R2TND012A4AA, R2TND018A4AA and
R2TND024A4AA)
a
1 2 3 4
6
7 5
E D
F
B A
a Use a disconnector or a double check valve according to
local regulations.
After all system connections are performed with care, perform the
following steps:
1 Connect the appliance to the main power supply. Due to low
pressure, error code "Err HJ-09" will appear on the user
interface and the status indicator light will be red.
2 Open all radiator valves.
3 Set all isolating valves to closed position.
4 Connect fresh water supply pipe to valve 5.
5 Open valves 1, 2, 3, 4, 5, 6.
6 Slowly turn the valve 7 to open position until pressure reaches
a value around 0.8bar for system heights up to 6metres. For
longer system heights, see "4.5 Central heating system
requirements" on page10 to determine filling pressure. Filling
operation should be done slowly. When pressure exceeds
0.8bar, error code will disappear and the status indicator light
will turn to blue. Turn the valve 7 off.
7 Turn the valve 5 off. Remove the filling loop if it is required by
local regulations.
8 Check the central heating circuit - especially the couplings of
the circuit - for leakage.
9 Make sure the automatic air vent valves located on the pump
and heat exchanger are opened. Vent the air from the
installation with the manual air vent screws on the radiators.
Make sure screws are tightened after venting.
10 If after the venting the pressure decreases below 0.8bar, refill
with water until the pressure reaches 0.8bar again.
11 Isolate the appliance from power mains.
Method 2
(For model R2CND024A4AA)
E
1 2 4
3 6
5
D F B
7
a
8
A
a Use a disconnector or a double check valve according to
local regulations.
After all system connections are performed with care, perform the
following steps:
1 Connect the appliance to the main power supply. Due to low
pressure, error code "Err HJ-09" will appear on the user
interface and the status indicator light will be red.
2 Open all radiator valves.
3 Set all isolating valves to closed position.
4 Connect the filling loop to the valve 7 and valve 8.
5 Set valves 1, 3, 5, 6 and 8 to open position.
6 Slowly open the valve 7 until pressure reaches a value around
0.8 bar for system heights up to 6metres. For longer system
heights, see "4.5 Central heating system requirements" on
page 10 to determine filling pressure. Filling operation should
be done slowly. When pressure exceeds 0.8bar, error code will
disappear and the status indicator light will turn to blue. Turn
the valve 7 off.
7 You can monitor the system pressure value from the user
interface.
8 Make sure the automatic air vent valves located on the pump
and heat exchanger are opened. Vent the air from the
installation with the manual air vent screws on the radiators.
Make sure screws are tightened after venting.
9 If after the venting the pressure decreases below 0.8bar, refill
with water until the pressure reaches 0.8 bar again.
10 Set valve 8 to off position. Remove the filling loop if it is
required by local regulations.
11 Check the central heating circuit - especially the couplings of
the circuit - for leakage.
12 Isolate the boiler from power mains.
4.10 Converting for use with a different
type of gas
WARNING
Gas conversion operation can only be carried out by
qualified competent persons.
Содержание
- Installation manual 1
- Wall mounted condensing boiler 1
- 02 94005 02 2
- Boiler efficiency 92 42 eec 2
- Electromagnetic compatibility 2014 30 eu 2
- En15502 1 en60335 2 102 2
- Gas appliances 2009 142 ec 2
- Georg blümel 2
- Installation manual 2
- Kiwa nb0063 2
- Low voltage 2014 35 eu 2
- Managing director 2
- P475131 2b 2
- R2cnd028 r2tnd028 r2cnd035 r2tnd035 2
- R2tnd012 r2tnd018 r2cnd024 r2tnd024 2
- Rd of july 2017 2
- Tcf 01 6 2
- About the documentation 3
- About the unit 4 3
- Caution 3
- Commissioning 24 3
- Danger 3
- Disposal 3
- Hand over to the user 25 3
- Identification label 3
- Indicates a situation that could result in death or serious injury 3
- Indicates a situation that could result in equipment or property damage 3
- Indicates a situation that could result in minor or moderate injury 3
- Indicates a situation that results in death or serious injury 3
- Indicates useful tips or additional information 3
- Information 3
- Installation 8 3
- Installers and they cover very important topics follow them carefully 3
- Introduction 3
- Introduction 3 3
- Languages are translations 3
- Meaning of warnings and symbols 3
- Notice 3
- Old units must be appropriately disposed of in accordance with local and national regulations the components are easy to separate and the plastics are marked this allows the various components to be sorted for appropriate recycling or disposal 3
- Please read the operation manual and installation manual prior to 3
- Safety instructions 4 3
- Table of contents 3
- The instructions contained in this document are intended to guide you through the installation of the unit damage caused by non observance of these instructions are not under the responsibility of rotex 3
- The original documentation is written in english all other 3
- The precautions described in this document are written for 3
- This means that electrical and electronic products may not be mixed with unsorted household waste do not try to dismantle the system yourself the dismantling of the system treatment of the refrigerant of oil and of other parts must be done by an authorized installer and must comply with applicable legislation units must be treated at a specialized treatment facility for reuse recycling and recovery by ensuring this product is disposed of correctly you will help to prevent potential negative consequences for the environment and human health for more information contact your installer or local authority 3
- Units are marked with the following symbol 3
- Use and keep them for future reference 3
- Warning 3
- You can find data about the unit on its identification label which is located at the bottom of the right cover of the unit 3
- About the unit 4
- Safety instructions 4
- Safety systems 4
- Symbols on the package 4
- About the unit 5
- Dimensions 5
- About the unit 6
- Components 6
- Components of model r2cnd024a4aa 6
- Components of models r2tnd012a4aa r2tnd018a4aa and r2tnd024a4aa 6
- A 20 30 for hungary 7
- About the unit 7
- Installation manual 7
- R2cnd024a4aa r2tnd012 024a4aa wall mounted condensing boiler 3p469346 4e 2017 7 7
- Technical specifications 7
- A control panel 8
- A front cover 8
- A high temperature regime means 60 c return temperature at heater inlet and 80 c feed temperature at heater outlet 8
- B low temperature means for condensing boilers 30 c for low temperature boilers 37 c and for other heaters 50 c return temperature at heater inlet 8
- Certain actions explained in this document such as gas conversion optional equipment connection require that the front cover is opened 8
- Dismantle the two mounting clips that hold the front cover 2 8
- Installation 8
- Installation manual 8
- Installation site requirements 8
- Loosen the screw that holds the right mounting clips 1 8
- Loosen the two screws of the control panel 4 8
- Mount this unit on vertical flat walls only 8
- Only qualified competent persons are allowed to open the unit 8
- P469346 4e 2017 7 8
- R2cnd024a4aa r2tnd012 024a4aa 8
- Remove the front cover forwards 3 8
- Shift the control panel downwards 5 and then pull it forwards 6 8
- The boiler must be installed by a qualified installer in accordance with local and national regulations 8
- The following instructions shall be observed when determining the installation site 8
- To open the unit 8
- Wall mounted condensing boiler 8
- Warning 8
- Installation 9
- Minimum installation clearances 9
- To unpack the unit 9
- Central heating system requirements 10
- Installation 10
- To mount the unit 10
- Connections 11
- Installation 11
- Piping connections 11
- Residual pump lift graph 11
- Underfloor heating requirements 11
- B f d e 12
- Guidelines when connecting the gas piping 12
- Guidelines when connecting the water piping 12
- Installation 12
- Guidelines when connecting options to the boiler 13
- Guidelines when connecting the electrical wiring 13
- Installation 13
- Installation 14
- Installation 15
- Wiring diagram 15
- Guidelines for condensate piping termination 16
- Guidelines when connecting the condensate piping 16
- Installation 16
- Applicable flue systems 17
- Guidelines when connecting the boiler to the flue gas system 17
- Installation 17
- Type c13x concentric flue system 17
- 125 mm flue system 18
- Installation 18
- Type c33x concentric flue system 18
- Installation 19
- Type c43x concentric flue system 19
- Type c53x twin pipes flue system 19
- Type c63x concentric flue system 19
- Installation 20
- Type c83x twin pipes flue system 20
- Type c93x 20
- Installation 21
- Type b53 open flue system 21
- Flue parts order codes 22
- Installation 22
- Type b33 open flue system 22
- Converting for use with a different type of gas 23
- Installation 23
- To fill the system with water 23
- Commissioning 24
- Gas air ratio no need to adjust 24
- To check for gas leakage 24
- To commission the unit 24
- To convert the system for use with a different type of gas 24
- To fill the condensate trap 24
- To modify settings for gas conversion 24
- Hand over to the user 25
- To commission the central heating 25
- To commission the central heating capacity setting 25
- To commission the domestic hot water 25
- P469346 4e 28
- Subject to change and correction 28
Похожие устройства
- Daikin R2TND012A4AA Инструкция по эксплуатации
- Daikin R2TND012A4AA Инструкция по монтажу
- Daikin R2TND018A4AA Инструкция по эксплуатации
- Daikin R2TND024A4AA Инструкция по эксплуатации
- Daikin R2TND024A4AA Инструкция по монтажу
- Daikin R2TND018A4AA Инструкция по монтажу
- Samsung Galaxy Z Fold3 256GB Black (SM-F926B) Руководство пользователя
- Samsung Galaxy Z Flip3 128GB Beige (SM-F711B) Руководство пользователя
- Wolta STD ДПО13-36-101-4К Руководство по монтажу и эксплуатации
- Wolta STD ДПО13-36-101-4К Презентация
- Wolta STD ДПО13-36-101-5К Руководство по монтажу и эксплуатации
- Wolta STD ДПО13-36-101-5К Презентация
- Wolta STD ДПО13-36-101-6К Руководство по монтажу и эксплуатации
- Wolta STD ДПО13-36-101-6К Презентация
- Wolta STD ДПО13-36-102-4К Руководство по монтажу и эксплуатации
- Wolta STD ДПО13-36-102-4К Презентация
- Wolta STD ДПО13-36-102-5К Презентация
- Wolta STD ДПО13-36-102-5К Руководство по монтажу и эксплуатации
- Wolta STD ДПО13-36-102-6К Презентация
- Wolta STD ДПО13-36-102-6К Руководство по монтажу и эксплуатации