Daikin EKHBRD011ADV17 Инструкция по монтажу онлайн
Содержание
- Installation manual p.1
- Indoor unit for air to water heat pump system p.1
- A pozitivně zjištěno p.3
- A daikin europe n v jogosult a műszaki konstrukciós dokumentáció összeállítására p.3
- Zgodnie z postanowieniami dyrektyw p.3
- Opomba p.3
- Direktive z vsemi spremembami p.3
- V skladu s p.3
- Laikantis nuostatų pateikiamų p.3
- Declara bajo su única responsabilidad que el equipo al que hace p.3
- Společnost daikin europe n v má oprávnění ke kompilaci souboru technické konstrukce p.3
- Information p.3
- Daikin europe n v is authorised to compile the technical construction file p.3
- Директиви с техните изменения p.3
- Respektive utrustning är utförd i överensstämmelse med och följer följande standard er eller andra normgivande dokument under förutsättning att användning sker i överensstämmelse med våra instruktioner p.3
- Erklærer som eneansvarlig at udstyret som er omfattet af denne erklæring p.3
- Bemærk p.3
- Zgodnie z dokumentacją p.3
- On vastavuses järgmis t e standardi te ga või teiste normatiivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele p.3
- Direktiv med företagna ändringar p.3
- V platném znění p.3
- La declaración p.3
- De acuerdo con el p.3
- Spełniają wymogi następujących norm i innych dokumentów normalizacyjnych pod warunkiem że używane są zgodnie z naszymi instrukcjami p.3
- In odobreno s strani p.3
- Daikin europe n v ir autorizēts sastādīt tehnisko dokumentāciju p.3
- Директив со всеми поправками p.3
- Remarque p.3
- Erklærer et fullstendig ansvar for at det utstyr som berøres av denne deklarasjon innebærer at p.3
- Bemerk p.3
- Zertifikat p.3
- On hyväksynyt p.3
- Direktiivid koos muudatustega p.3
- Under iagttagelse af bestemmelserne i p.3
- Kā norādīts p.3
- De acordo com o previsto em p.3
- Sont conformes à la aux norme s ou autre s document s normatif s pour autant qu ils soient utilisés conformément à nos instructions p.3
- Ilmoittaa yksinomaan omalla vastuullaan että tämän ilmoituksen tarkoittamat laitteet p.3
- Daikin europe n v hat die berechtigung die technische konstruktionsakte zusammenzustellen p.3
- Декларира на своя отговорност че оборудването за което се отнася тази декларация p.3
- Prohlašuje ve své plné odpovědnosti že zařízení k němuž se toto prohlášení vztahuje p.3
- Erklärt auf seine alleinige verantwortung dass die ausrüstung für die diese erklärung bestimmt ist p.3
- Aşa cum este stabilit în p.3
- Og positivt vurderet af p.3
- Direktiivejä sellaisina kuin ne ovat muutettuina p.3
- Un atbilstoši p.3
- Követi a z p.3
- De acordo com o p.3
- Съответстват на следните стандарти или други нормативни документи при условие че се използват съгласно нашите инструкции p.3
- Sono conformi al i seguente i standard s o altro i documento i a carattere normativo a patto che vengano usati in conformità alle nostre istruzioni p.3
- Igazolta a megfelelést a z p.3
- Daikin europe n v har tillatelse til å kompilere den tekniske konstruksjonsfilen p.3
- В соответствии с положениями p.3
- Prema odredbama p.3
- Enligt villkoren i p.3
- Aufgeführt und von p.3
- Za předpokladu že jsou využívány v souladu s našimi pokyny odpovídají následujícím normám nebo normativním dokumentům p.3
- U skladu sa slijedećim standardom ima ili drugim normativnim dokumentom ima uz uvjet da se oni koriste u skladu s našim uputama p.3
- Kot je določeno v p.3
- Daikin europe n v е оторизирана да състави акта за техническа конструкция p.3
- Съгласно p.3
- Som det fremkommer i p.3
- Ifølge p.3
- Daikin europe n v está autorizado a compilar el archivo de construcción técnica p.3
- Şi apreciat pozitiv de p.3
- Pozytywną opinią p.3
- Enligt p.3
- Atitinka žemiau nurodytus standartus ir arba kitus norminius dokumentus su sąlyga kad yra naudojami pagal mūsų nurodymus p.3
- Za dodržení ustanovení předpisu p.3
- Og gjennom positiv bedømmelse av p.3
- Directives telles que modifiées p.3
- Teljes felelőssége tudatában kijelenti hogy a berendezések melyekre e nyilatkozat vonatkozik p.3
- Kinnitab oma täielikul vastutusel et käesoleva deklaratsiooni alla kuuluv varustus p.3
- Daikin europe n v è autorizzata a redigere il file tecnico di costruzione p.3
- Соответствуют следующим стандартам или другим нормативным документам при условии их использования согласно нашим инструкциям p.3
- Som anført i p.3
- Ievērojot prasības kas noteiktas p.3
- Daikin europe n v este autorizat să compileze dosarul tehnic de construcţie p.3
- Ürünün talimatlarımıza göre kullanılması koşuluyla aşağıdaki standartlar ve norm belirten belgelerle uyumludur p.3
- Poznámka p.3
- En60335 2 40 p.3
- As set out in p.3
- Z vso odgovornostjo izjavlja da je oprema naprav na katero se izjava nanaša p.3
- Održiavajúc ustanovenia p.3
- Directives as amended p.3
- Tel que défini dans p.3
- Kako je izloženo u p.3
- Daikin europe n v är bemyndigade att sammanställa den tekniska konstruktionsfilen p.3
- Согласно p.3
- Smjernice kako je izmijenjeno p.3
- I pozitivno ocijenjeno od strane p.3
- Daikin europe n v est autorisé à compiler le dossier de construction technique p.3
- Û ìêˆó ìâ ùô p.3
- Pozitīvajam vērtējumam saskaņā ar p.3
- En positief beoordeeld door p.3
- Are in conformity with the following standard s or other normative document s provided that these are used in accordance with our instructions p.3
- Z późniejszymi poprawkami p.3
- Och godkänts av p.3
- Directivelor cu amendamentele respective p.3
- Tarafından tarafından olumlu olarak değerlendirildiği gibi p.3
- Kaip nustatyta p.3
- Daikin europe n v â ó è âíô ûèô ôùëì óë ó û óù íâè ùôó â óèîfi ê îâïô î ù ûîâ p.3
- Следвайки клаузите на p.3
- Smernice v platnom znení p.3
- I henhold til p.3
- Daikin europe n v er autoriseret til at udarbejde de tekniske konstruktionsdata p.3
- În urma prevederilor p.3
- Positiv beurteilt gemäß p.3
- Ekhbrd011adv1 ekhbrd014adv1 ekhbrd016adv1 ekhbrd011ady1 ekhbrd014ady1 ekhbrd016ady1 p.3
- Ar pilnu atbildību apliecina ka tālāk aprakstītās iekārtas uz kurām attiecas šī deklarācija p.3
- Y es valorado positivamente por p.3
- Ob upoštevanju določb p.3
- Directivas según lo enmendado p.3
- Tanúsítvány p.3
- Järgi vastavalt p.3
- Daikin europe n v yra įgaliota sudaryti šį techninės konstrukcijos failą p.3
- Примечание p.3
- Skladni z naslednjimi standardi in drugimi normativi pod pogojem da se uporabljajo v skladu z našimi navodili p.3
- Hinweis p.3
- Daikin europe n v p.3
- În conformitate cu p.3
- Piezīmes p.3
- E giudicato positivamente da p.3
- And judged positively by p.3
- Wie in der p.3
- Noudattaen määräyksiä p.3
- Directivas conforme alteração em p.3
- Компания daikin europe n v уполномочена составить комплект технической документации p.3
- Siguiendo las disposiciones de p.3
- Gitt i henhold til bestemmelsene i p.3
- Da belirtildiği gibi ve p.3
- Î è îú óâù è ıâùèî fi ùô p.3
- Pen402191 1b_2017_09 book page 1 friday october 6 2017 7 03 pm p.3
- E com o parecer positivo de p.3
- Alapján a z p.3
- Vyhlasuje na vlastnú zodpovednosť že zariadenie na ktoré sa vzťahuje toto vyhlásenie p.3
- Napomena p.3
- Dichiara sotto la propria responsabilità che gli apparecchi a cui è riferita questa dichiarazione p.3
- Tamamen kendi sorumluluğunda olmak üzere bu bildirinin ilgili olduğu donanımının aşağıdaki gibi olduğunu beyan eder p.3
- Jotka on esitetty asiakirjassa p.3
- Daikin europe n v teknik yapı dosyasını derlemeye yetkilidir p.3
- Както е изложено в p.3
- Shigeki morita director ostend 1st of december 2016 p.3
- Gemäß den vorschriften der p.3
- Conformément aux stipulations des p.3
- Ìâ ù úëûë ùˆv è ù íâˆv ùˆv p.3
- Pastaba p.3
- Direttive come da modifica p.3
- Ako bolo uvedené v p.3
- Visiška savo atsakomybe skelbia kad įranga kuriai taikoma ši deklaracija p.3
- Nagu on näidatud dokumendis p.3
- Değiştirilmiş halleriyle yönetmelikler p.3
- Tal como estabelecido em p.3
- Jak bylo uvedeno v p.3
- Daikin europe n v on volitatud koostama tehnilist dokumentatsiooni p.3
- Как указано в p.3
- Sertifikasına p.3
- Following the provisions of p.3
- Conformément au p.3
- Ëïòóâè ìâ ôîïâèûùèî ùë â ı óë fiùè ô âíô ïèûìfi ûùôó ô ô ô ó ê úâù è ë úô û ïˆûë p.3
- Pagal pagal p.3
- Direktīvās un to papildinājumos p.3
- According to the according to the p.3
- Verklaart hierbij op eigen exclusieve verantwoordelijkheid dat de apparatuur waarop deze verklaring betrekking heeft p.3
- Märkus p.3
- Der den folgenden norm en oder einem anderen normdokument oder dokumenten entspricht entsprechen unter der voraussetzung daß sie gemäß unseren anweisungen eingesetzt werden p.3
- Tad ja lietoti atbilstoši ražotāja norādījumiem atbilst sekojošiem standartiem un citiem normatīviem dokumentiem p.3
- Ja jotka p.3
- Daikin europe n v on valtuutettu laatimaan teknisen asiakirjan p.3
- И оценено положително от p.3
- Secondo le prescrizioni per p.3
- F ˆ î ıôú âù è ûùô p.3
- Conform de volgende norm en of één of meer andere bindende documenten zijn op voorwaarde dat ze worden gebruikt overeenkomstig onze instructies p.3
- Ëìâ ˆûë p.3
- P402254 7b p.3
- Direktyvose su papildymais p.3
- A pozitívne zistené p.3
- Vastavalt nõuetele p.3
- Mukaisesti p.3
- Delineato nel p.3
- Sú v zhode s nasledovnou ými normou ami alebo iným i normatívnym i dokumentom ami za predpokladu že sa používajú v súlade s našim návodom p.3
- Ja heaks kiidetud p.3
- Daikin europe n v ma upoważnienie do zbierania i opracowywania dokumentacji konstrukcyjnej p.3
- И в соответствии с положительным решением p.3
- Secondo il p.3
- Et évalué positivement par p.3
- Como se establece en p.3
- Ëáèòv fi ˆ ô ó ùúô ô ôèëıâ p.3
- Overholder følgende standard er eller andet andre retningsgivende dokument er forudsat at disse anvendes i henhold til vore instrukser p.3
- Direktiver med senere ændringer p.3
- Vastaavat seuraavien standardien ja muiden ohjeellisten dokumenttien vaatimuksia edellyttäen että niitä käytetään ohjeidemme mukaisesti p.3
- Megjegyzés p.3
- Deklaruje na własną wyłączną odpowiedzialność że urządzenia których ta deklaracja dotyczy p.3
- Szerint p.3
- Izjavljuje pod isključivo vlastitom odgovornošću da oprema na koju se ova izjava odnosi p.3
- Daikin europe n v je pooblaščen za sestavo datoteke s tehnično mapo p.3
- Certificate p.3
-  ó è û ìêˆó ìâ ùô îfiïô ıô úfiù ô ïïô ááú êô î óôóèûìòó fi ùëó úô fiıâûë fiùè úëûèìô ôèô óù è û ìêˆó ìâ ùè ô ëá â ì p.3
- Overeenkomstig de bepalingen van p.3
- Direktiver med foretatte endringer p.3
- V súlade s p.3
- Megfelelnek az alábbi szabvány ok nak vagy egyéb irányadó dokumentum ok nak ha azokat előírás szerint használják p.3
- Deklarerar i egenskap av huvudansvarig att utrustningen som berörs av denna deklaration innebär att p.3
- Sunt în conformitate cu următorul următoarele standard e sau alt e document e normativ e cu condiţia ca acestea să fie utilizate în conformitate cu instrucţiunile noastre p.3
- Irányelv ek és módosításaik rendelkezéseit p.3
- Daikin europe n v je ovlašten za izradu datoteke o tehničkoj konstrukciji p.3
- Заявляет исключительно под свою ответственность что оборудование к которому относится настоящее заявление p.3
- Richtlijnen zoals geamendeerd p.3
- Estão em conformidade com a s seguinte s norma s ou outro s documento s normativo s desde que estes sejam utilizados de acordo com as nossas instruções p.3
- Zoals vermeld in p.3
- Overeenkomstig p.3
- Direktiven gemäß änderung p.3
- A daikin europe n v está autorizada a compilar a documentação técnica de fabrico p.3
- V souladu s p.3
- Low voltage 2014 35 eu machinery 2006 42 ec electromagnetic compatibility 2014 30 eu p.3
- Declară pe proprie răspundere că echipamentele la care se referă această declaraţie p.3
- Spoločnosť daikin europe n v je oprávnená vytvoriť súbor technickej konštrukcie p.3
- Ir kaip teigiamai nuspręsta p.3
- Daikin europe n v is bevoegd om het technisch constructiedossier samen te stellen p.3
- Забележка p.3
- Respektive utstyr er i overensstemmelse med følgende standard er eller andre normgivende dokument er under forutssetning av at disse brukes i henhold til våre instrukser p.3
- Están en conformidad con la s siguiente s norma s u otro s documento s normativo s siempre que sean utilizados de acuerdo con nuestras instrucciones p.3
- Bunun koşullarına uygun olarak p.3
- Installation manual p.4
- Refer to the heater kit installation manual for further details p.5
- An optional ekrp1ahta demand pcb can be connected to the indoor unit this pcb is needed when the optional heater kit ekbuh or daikin room thermostat ekrtr or ekrtw is installed or when multiple set point control is used and provides the communication with the indoor unit p.5
- Refer to the demand pcb installation manual for further details p.5
- An optional ekbuh heater kit can be combined with the indoor unit purpose is to provide an additional heating capacity during cold outdoor temperatures the heater kit has a heating capacity of 6 kw and available for both 1 phase and 3 phase power supply specifications when using this heater kit installation of the optional demand pcb is required as well p.5
- Operation of the indoor unit is described in the indoor unit operation manual p.5
- Model identification p.5
- Installation of the ersq or errq heat pump outdoor is described in the outdoor unit installation manual p.5
- Using a balancing bottle will affect the optimal pump control of the unit and will increase the cost of the system unnecessarily p.5
- Indoor unit p.5
- Typical application examples p.5
- If this option is installed it is not possible to use the remote controller thermostat function p.5
- This installation manual describes the procedures for handling installing and connecting all ekhbrd indoor unit models p.5
- If only 1 heat emitter all system has 1 water set point it is recommended not to use a balancing bottle p.5
- The application examples given below are for illustration purposes only p.5
- Space heating and domestic hot water heating with a single remote controller installed in the living room p.5
- I application 1 p.5
- Scope of this manual p.5
- Heater kit option p.5
- Room thermostat option p.5
- Digital i o pcb option p.5
- Remote controller option p.5
- Demand pcb option p.5
- Refer to the wiring diagram or connection diagram for connecting this pcb to the unit p.5
- Application examples with only 1 heat emitter and 1 heat source ekhbrd unit p.5
- Refer to the room thermostat installation manual for further details p.5
- An optional secondary ekruahta remote controller with room thermostat functionality can be connected to the indoor unit purpose is to provide the possibility to install the standard remote controller near the unit for service reasons and install another remote controller in another place e g living room to operate your installation p.5
- Refer to the operation manual of the indoor unit and to the digital i o pcb installation manual for more information p.5
- An optional room thermostat ekrtr or ekrtw can be connected to the indoor unit p.5
- Refer to the installation of the remote controller on page 17 for further details p.5
- An optional ekrp1hba digital i o pcb can be connected to the indoor unit and be used to remotely monitor your system this address card offers 3 voltage free outputs p.5
- Refer to the chapter electrical wiring work on page 15 about connecting the master and slave remote controller p.6
- Optionally the daikin room thermostat ekrtr or ekrtw can be connected to the daikin system daikin can not guarantee neither good operation nor reliability of the system if another thermostat is used for those reasons daikin can not give warranty of the system in such case p.6
- I application 3 p.6
- I application 2 p.6
- There is only a room thermostat on off control there is no smart logic functionality for space heating when there is simultaneous demand of space heating and domestic hot water the domestic hot water operation is performed according to the minimum and maximum timer operation p.6
- The remote controller gives immediate feedback to the indoor unit and by doing so it matches in a smart way the unit performance to the demanded space heating requirements in this way there is no frequent start stop of the unit or there are no too big temperature fluctuations in the to be heated rooms this remote controller has also a smart logic functionality which controls the combined space heating and domestic hot water demand e g if room temperature drops more than 3 c during domestic hot water operation the unit will automatically switch back to space heating there is no remote controller near the unit during service maintenance an additional remote controller can be connected by a service person p.6
- The remote controller gives immediate feedback to the indoor unit and by doing so it matches in a smart way the unit performance to the demanded space heating requirements in this way there is no frequent start stop of the unit or there are no too big temperature fluctuations in the to be heated rooms this remote controller has also a smart logic functionality which controls the combined space heating and domestic hot water demand e g if room temperature drops more than 3 c during domestic hot water operation the unit will automatically switch back to space heating the main remote controller c1 is installed in the living room and can access all settings master the second remote controller c2 can not access schedule and field settings slave p.6
- Space heating and domestic hot water heating with one remote controller installed with the unit and another remote controller installed in the living room p.6
- Space heating and domestic hot water heating with a single remote controller installed with the unit and the external room thermostat installed in the living room p.6
- Using different heat emitters means using different water set points for the system p.7
- Such installations must be done using a balancing bottle and each kind of heat emitter should have a specific pump p.7
- Space heating provided through a combination of floor heating loops fan coil unit and radiator heating for floor heating applications in combination with radiators the water temperature delivered by the daikin system is too high for this reason a temperature reducing device field supply is required to lower the water temperature the hot water will be mixed with cold water to lower the temperature the control of this field supplied valve is not done by the heat pump system the operation and configuration of the field water circuit and selection of the balancing bottle the pumps etc are the responsibility of the installer daikin only offers the possibility to have multiple set points on request p.7
- Refer to the chapter multiple set point control on page 29 for more information about the configuration of your system p.7
- I pattern b the domestic hot water tank is installed in a separate circuit with a 3 way valve of the temperature reducing device s this configuration does not allow simultaneous domestic hot water and space heating operation p.7
- I pattern a the domestic hot water tank is installed in parallel with the temperature reducing device s this allows operating the unit in space heating and domestic water heating simultaneously the balancing of the water distribution is in this case the responsibility of the installer p.7
- I application 4 p.7
- Application examples with 2 or more different heat emitters and 1 heat source ekhbrd unit p.7
- Space heating with an auxiliary boiler alternating operation p.8
- Daikin shall not be held liable for any damage resulting from failure to observe this rule p.8
- Space heating application by either the daikin indoor unit or by an auxiliary boiler connected in the system an auxiliary contact decides whether either the ekhbrd indoor unit or the boiler will operate this auxiliary contact can e g be an outdoor temperature thermostat an electricity tariff contact a manually operated contact etc p.8
- Bivalent operation is only possible for space heating operation not for the domestic hot water heating operation domestic hot water in such an application is always provided by the domestic hot water tank which is connected to the daikin indoor unit p.8
- Never set the target leaving water temperature set point on the boiler controller above 80 c p.8
- Application examples with 2 different heat sources auxiliary boiler ekhbrd unit p.8
- Make sure that the room thermostat th is not frequently turned on off p.8
- Make sure that the non return valves field supply are correctly installed in the system p.8
- Make sure that return water to the ekhbrd heat exchanger never exceeds 80 c p.8
- I operation when the room thermostat th closes either the ekhbrd unit or the boiler starts operating depending on the position of the auxiliary contact c p.8
- I make sure that auxiliary contact c has sufficient differential or time delay so as to avoid frequent changeover between the ekhbrd unit and the boiler if the auxiliary contact c is an outdoor temperature thermostat make sure to install the thermostat in the shade so that it is not influenced or turned on off by the sun p.8
- I field wiring p.8
- I during heating operation of the ekhbrd unit the unit will operate so as to achieve the target leaving water temperature as set on the user interface when weather dependent operation is active the water temperature is determined automatically depending on the outdoor temperature p.8
- I daikin can not be put responsible for incorrect or unsafe situations in the boiler system p.8
- I be sure that the boiler and the integration of the boiler in the system is in accordance with relevant european and national regulations p.8
- I application 5 p.8
- When using 2 heat sources it is recommended to use a balancing bottle as follows p.8
- Frequent switching may cause corrosion of the boiler in an early stage contact the manufacturer of the boiler p.8
- Valve in the return water flow of the ekhbrd unit p.8
- For this reason never put the target leaving water temperature set point on the boiler controller above 80 c and install an aquasta p.8
- The auxiliary boiler must be integrated in the piping work and in the field wiring according to the illustrations below p.8
- During heating operation of the boiler the boiler will operate so as to achieve the target leaving water temperature as set on the boiler controller p.8
- When replacing an old gas or fuel oil boiler by a air to water heat pump system ekhbrd p.9
- When designing the hydraulic system always consult typical application examples on page 2 for references p.9
- When designing the hydraulic system always consider the available external static pressure of the ekhbrd unit p.9
- This external static pressure graph is valid at maximum pump rpm p.9
- The pump will adjust its rpm rotations per minute as to control a fixed t between return and leaving water temperature p.9
- Simultaneous operation of the auxiliary boiler and the ekhbrd unit is not allowed p.9
- Pay special attention to the control of the circulation pump of the auxiliary boiler this pump should not operate simultaneously with the ekhbrd unit a simultaneous operation of both systems will risk the plate heat exchanger of the ekhbrd unit to freeze up p.9
- I please always check the specifications of the pump of the old unit p.9
- I if the external static pressure of that pump is higher than the external static pressure of the air to water heat pump system please install an additional pump with higher external static pressure in combination with a balancing bottle p.9
- Example of a high external static pressure system p.9
- Design of the hydraulic system p.9
- Ccessories p.10
- Accessories supplied with this unit p.10
- Verview of the indoor unit p.10
- Main components p.10
- Switch box main components p.11
- Functional diagram p.11
- Selecting an installation location p.12
- Nstallation of the indoor unit p.12
- Installing the indoor unit p.12
- Inspecting and handling the unit p.12
- Dimensions and service space p.12
- Water piping work p.15
- Refrigerant piping work p.15
- Iping connection work p.15
- Guidelines for flare connection p.15
- Checking the water circuit p.15
- Check that the total water volume in the entire water circuit is lower than this value p.16
- Calculating the pre pressure of the expansion vessel p.16
- When circulation in each space heating radiator loop is controlled by remotely controlled valves it is important that this minimum water volume of 20 l is kept even if all the valves are closed p.16
- Using the table and instructions below determine if the expansion vessel pre pressure requires adjustment and determine if the total water volume in the installation is below the maximum allowed water volume p.16
- To determine the maximum allowed water volume in the entire circuit proceed as follows p.16
- To assure proper operation of the unit the pre pressure of the expansion vessel might need to be adjusted and the minimum and maximum water volume must be checked p.16
- The unit is equipped with an expansion vessel of 12 litre which has a default pre pressure of 1 bar p.16
- The pre pressure pg to be set depends on the maximum installation height difference h and is calculated as below p.16
- Pg h 10 0 bar p.16
- In most applications this minimum water volume will have a satisfying result p.16
- In critical processes or in rooms with a high heat load though extra water volume might be required p.16
- If this is not the case the expansion vessel inside the indoor unit is too small for the installation p.16
- Example p.16
- Determine for the calculated pre pressure pg the corresponding maximum water volume using the graph below p.16
- Checking the water volume and expansion vessel pre pressure p.16
- Checking the maximum allowed water volume p.16
- Check that the total water volume in the installation excluding the internal water volume of the unit is 20 l minimum p.16
- Connecting the water circuit p.17
- Setting the pre pressure of the expansion vessel p.17
- Precautions when connecting field piping and regarding insulation p.17
- Method for adding water p.17
- Harging water p.17
- Switch box components list p.18
- Precautions on electrical wiring work p.18
- Lectrical wiring work p.18
- Internal wiring parts table p.18
- I the electrical connection diagram can be found on the inside of the switch box cover p.19
- I most field wiring on the indoor unit side is to be made on the terminal block inside the switch box to gain access to the terminal blocks remove switch box service panel refer to the unit switch box cover for instructions how to remove this panel and gain access to the inside of the switch box p.19
- I install the indoor and outdoor unit power supply cable and communication cable s at least 1 meter away from televisions or radios to prevent image interference or noise depending on the radio waves a distance of 1 meter may not be sufficient to eliminate the noise p.19
- I cable tie mountings are provided at the wiring entries of the switch box see switch box main components on page 8 p.19
- I be sure to route all cables between the unit side plate and the wiring retention bar as shown in figure 3 p.19
- V17 models only y17 models only p.19
- Connection of the indoor unit power supply and communication cable s p.19
- Using the appropriate cable connect the power supply and communication cable s to the appropriate terminals as shown on the wiring diagram and according to figure 3 p.19
- Cable requirements p.19
- System overview of field wiring p.19
- After finishing the electric work confirm that each electric part and terminal inside the electric parts box is connected securely p.19
- Select all cables and wire sizes in accordance with relevant local and national regulations p.19
- R4t returning water thermistor r5t leaving water thermistor r6t discharge thermistor r7t liquid thermistor r134a r8t fin thermistor rc a p receiver circuit s1ph high pressure switch s1s benefit kwh rate power supply contact field supply s3s mixing station input 1 field supply s4s mixing station input 2 field supply ss1 a1p selector switch emergency ss1 a2p selector switch master slave ss1 a7p selector switch optional tc a p transmitter circuit t1r t2r a p diode bridge t3r power module v1c v8c ferrite core noise filter v1c v12c ferrite core noise filter x1m x3m terminal block x1y x4y connector x m a p terminal block on pcb optional y17r 4 way valve z1f z5f a p noise filter p.19
- Ps power supply see figure 3 lv low voltage see figure 3 hv high voltage see figure 3 p.19
- Procedure p.19
- Open the unit and put the switch box in front of the unit as described in opening the unit on page 36 p.19
- Open the switch box cover p.19
- I when wiring route the cable bundles that are outside the unit away from each other by at least 25 mm in order to avoid receiving electric noise external noise p.19
- I to avoid receiving electric noise be sure that the cables are put in the correct bundle and routed in the correct bundle tray as shown in figure 3 p.19
- Installation of the remote controller p.20
- Connection to a benefit kwh rate power supply p.20
- In case of benefit kwh rate power supply installation remove the wiring bridges on x2m before installing the normal kwh rate power supply p.21
- For y17 unit types only 3 p.21
- For v17 unit types only 1 p.21
- When the indoor and outdoor unit are connected to a benefit kwh rate power supply the voltage free contact of the receiver controlling the benefit kwh rate signal of the electricity company must be connected to clamps 7 and 8 of x3m as illustrated in the figure above p.21
- When parameter 6 04 2 at the moment that the benefit kwh rate signal is sent by the electricity company that contact will close and the unit will go in forced off mod p.21
- When parameter 6 04 1 at the moment that the benefit kwh rate signal is sent by the electricity company that contact will open and the unit will go in forced off mod p.21
- Possible types of benefit kwh rate power supply p.21
- Possible connections and requirements to connect the equipment to such power supply are illustrated in the figures below p.21
- Up and configuration p.22
- Pre operation checks p.22
- Field settings p.22
- Procedure p.23
- Detailed description p.23
- When setback function is enabled the setback operation will have priority over the scheduled action in the schedule timer if on instruction is active if off instruction is active this will have priority over the setback function at any time the off instruction will have the highest priority p.24
- When setback function is enabled the setback operation will have priority over the scheduled action in the schedule timer p.24
- Operation example schedule timer based on temperature set points p.24
- Operation example schedule timer based on on off instruction p.24
- Off on on p.24
- In the following tables both methods on how to interpret the schedule timer are shown p.24
- When the reheat temperature is reached the further heat up till storage temperature of the domestic hot water tank will be decided by the running timers which are programmed by the installer p.29
- When requesting space heating and domestic water heating storage at the same time domestic water will be heated according to running timer then space heating will start again according to running timer then domestic water heating will start again according to running timer this will continue till storage set point is reached p.29
- When requesting space heating and domestic water heating reheat at the same time the domestic water will be heated till maximum reheat temperature then space heating will start again p.29
- Storage operation p.29
- Simultaneous demand of space heating and domestic water heating p.29
- See chapter final check on page 34 for more information p.29
- Remote controller leaving water temperature control p.29
- Reheat operation p.29
- On off p.29
- I e 04 2 high pump speed operation if you select e 04 1 or 2 and 6 00 1 the unit will activate the domestic hot water 3 way valve this function is a helpful feature to get all air removed out of the system as well in space heating as in domestic hot water heating p.29
- Do not forget to restore the field setting e 04 to the default value when commissioning is finished p.29
- When requesting space heating and domestic water heating reheat at the same time the domestic water will be heated till maximum reheat temperature then space heating will start again p.30
- Storage operation p.30
- Reheat operation p.30
- On off p.30
- External room thermostat p.30
- When the reheat temperature is reached the further heat up of the domestic hot water tank will be decided by the external room thermostat thermo conditions and running timers which are programmed by the installer p.30
- When requesting space heating and domestic water heating storage at the same time domestic water will be heated according to running timer then space heating will start again according to running timer then domestic water heating will start again according to running timer this will continue till storage set point is reached p.30
- When the reheat temperature is reached the further heat up till storage temperature of the domestic hot water tank will be decided by the remote controller room thermostat in order to prevent the room temperature to drop too much p.31
- When requesting space heating and domestic water heating storage at the same time domestic water will be heated but as soon as the room temperature drops 3 c from set point space heating will start till 0 c above set point then domestic water will be heated again till storage set point p.31
- When requesting space heating and domestic water heating reheat at the same time the domestic water will be heated till maximum reheat temperature then space heating will start again p.31
- Storage operation p.31
- Remote controller room temperature control p.31
- Reheat operation p.31
- On off p.31
- Multiple set point control p.32
- Field settings table p.35
- Temperature read out mode p.37
- Procedure for space heating p.37
- Procedure for domestic water heating p.37
- Inal check and test run p.37
- Final check p.37
- Test run p.37
- Roubleshooting p.38
- Maintenance activities p.38
- General guidelines p.38
- Checks p.38
- Aintenance and service p.38
- The switch box can now be placed just before the indoor unit the compressor cable located at the backside of the unit can be untied to place the switch box further away from the unit p.39
- Switch off all power supply also outdoor unit power supply etc before removing the switch box service cover p.39
- Opening the unit p.39
- Loosen the front screws and unhitch the total switch box p.39
- I to gain access to the indoor unit at the front side the total switch box can be removed from the unit p.39
- I to facilitate access to the air purge valve thermal cut out 3 way valve thermistors field wiring duct the top decoration panel of the unit can be removed by removing the 2 screws at the rear and then unhitch the panel both the drain plates can be removed p.39
- I parts inside the unit can be hot and burning is possible p.39
- I make sure to switch off all power supplies before removing the switch box from the unit p.39
- I make sure to always fix the cover with the screws when removing the switch box p.39
- General symptoms p.39
- To remove the front decoration panel remove the 2 bottom screws and then unhitch the panel p.39
- When a safety device is activated the user interface led will be flashing and an error code will be displayed p.40
- Reset the safety by pushing the button p.40
- In case this procedure for resetting the safety is not successful contact your local dealer p.40
- Error codes p.40
- A list of all errors and corrective actions can be found in the table below p.40
- Technical specifications p.41
- Nit specifications p.41
- Electrical specifications p.41
- General overview and guide to start up the unit p.42
- Domestic water heating p.43
- Simultaneous demand of space heating and domestic water heating p.44
Похожие устройства
-
Daikin EKHBRD016ADY17Инструкция по монтажу -
Daikin EKHBRD016ADY17Инструкция по эксплуатации -
Daikin EKHBRD014ADY17Инструкция по монтажу -
Daikin EKHBRD014ADY17Инструкция по эксплуатации -
Daikin EKHBRD011ADY17Инструкция по монтажу -
Daikin EKHBRD011ADY17Инструкция по эксплуатации -
Daikin EKHBRD016ADV17Инструкция по монтажу -
Daikin EKHBRD016ADV17Инструкция по эксплуатации -
Daikin EKHBRD014ADV17Инструкция по монтажу -
Daikin EKHBRD014ADV17Инструкция по эксплуатации -
Daikin EKHBRD011ADV17Инструкция по эксплуатации -
Daikin EKHBRD016ADY1Инструкция по монтажу