Daikin EHYHBH08AFV32 [176/252] Configuration

Daikin EHYHBX08AFV3 [176/252] Configuration
8 | Configuration
Installer reference guide
176
EVLQ05+08CAV3 + EHYHBH05AF + EHYHBH/X08AF + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1F – 2020.10
5 Replace the O-ring (c) and the gas restriction (d) with the rings from the
conversion set.
6 Reassemble in reverse sequence.
7 Open the gas tap.
8 Check the gas connections before the gas valve for gastightness.
9 Switch on the mains power.
10 Check the gas connections after the gas valve for gastightness (during
operation).
11 Now check the setting of the CO
2
percentage at high setting ( in display) and
low setting ( in display).
12 Put a sticker indicating the new gas type on the bottom of the gas boiler, next
to the nameplate.
13 Put a sticker indicating the new gas type next to the gas valve, over the
existing one.
14 Put the front panel back in its place.
a
b
c
d
a Coupling
b Gas mixing tube
c O-ring
d Gas metering ring
INFORMATION
The gas boiler is configured for operation with gas type G20 (20mbar). However, if
the gas type present is G25 (25 mbar), the gas boiler can still be operated without
modification.

Содержание

Похожие устройства

Скачать