Daikin UATYQ50ABAY1 Инструкция по монтажу онлайн [14/44] 608593

Daikin UATYQ45ABAY1 Инструкция по монтажу онлайн [14/44] 608592
Translation from original instructions
Installation manual
14
We reserve the right to make changes without any prior notice.
UATYQ*Y1
Packaged Rooftop
4P522680-1
A pallet is secured under the unit so that it can also be unloaded and handled with a suitable forklift truck.
If anti-vibration mounts are installed under the base of the unit, this must be done with the unit raised by no more than
200 mm from the ground and without putting any parts of the body under it.
Beforeslidingoutthepallet,removethescrewsxingittotheunit.
Use a 10 mm spanner to unscrew the screws that are visible through the slotted holes of the base.
Fig.1Detailofpositionofpalletxingscrews
After the pallet has been removed, the unit should be lifted using only and solely the lifting slings and tubes supplied
withit,insertedintheliftingeyesmarkedwiththeplatesprovided(yellowplates).
For smaller sizes "UATYQ20A***Y1, UATYQ25A***Y1 and UATYQ30A***Y1", the slings can be inserted directly
through the lifting eyes.
Forsmallersizes"1.2,3.2and4.2",theslingscanbeinserteddirectlythroughtheliftingeyes.
Fig. 2 Lifting with slings
To prevent the slings from being damaged on the edges of the lifting eyes, use suitable protective
devices.
To prevent the slings from touching the unit, suitable protective devices must be placed on the upper
edges.

Содержание

Скачать