Daikin UATYQ115AFC2Y1 [4/44] Commissioning 30

Daikin UATYQ115AFC2Y1 [4/44] Commissioning 30
Translation from original instructions
Installation manual
4
We reserve the right to make changes without any prior notice.
UATYQ*Y1
Packaged Rooftop
4P522680-1
5.3 Installation 23
5.3.1 Fittingofrainhoods 23
5.3.2 Externalpositioning 24
5.3.3 Anti-vibrationmounts 24
5.3.4 Minimumdistances 25
5.4 Electrical connections 26
5.5 Condensate drain connections 28
5.5.1 Condensatedrainoftheinternalaircoil 28
5.5.2 Condensatedrainoftheexternalaircoil 28
5.6 Aeraulic connections 29
5.6.1 Returnandsupplyducts 29
5.6.2 Connectionoftheducts 29
6 Commissioning 30
6.1 Preliminary operations 30
6.2 First starting 31
6.2.1 Preliminarychecks 31
6.2.2 Functionaltests 31
6.3 Calibration of safety components 32
6.4 Checks during operation 33
6.5 Alarms and malfunctions 34
6.6 Temporary stop 35
6.7 Stop for long periods of time 35
7 Maintenance 36
7.1 Adjustments 36
7.2 External cleaning 37
7.2.1 Cleaningthecoils 37
7.3 Internal cleaning 38
7.3.1 Cleaningtheunit 38
7.4 Periodic checks 39
7.5 Unscheduled maintenance 40
7.5.1 Specialwork 40
7.5.2 Exceptionalwork 40
8 Decommissioning 41

Содержание

Скачать