Haier HSU-12LEB13-H [2/4] Mm 1 2
![Haier HSU-12LEA13-F [2/4] Mm 1 2](/views2/1814851/page2/bg2.png)
Selection of pipe
To this unit, both liquid and gas pipes shall be insulated
as they become Iow temperature in operation.
Use optional parts for piping set or pipes covered with
equivalent insulation material.
2
1.Fitting of the Mounting Plate and Positioning of the wall Hole
2.Making a Hole on the Wall and Fitting the Piping Hole Cover
When the mounting plate is first fixed
1.Carry out, based on the neighboring pillars or lintels, a proper leveling for the plate to be
fixed against the wall, then temporarily fasten the plate with one steel nail.
2. Make sure once more the proper level of the plate, by hanging a thread with a weight from
the central top of the plate, then fasten securely the plate with the attachment steel nail.
3. Find the wall hole location A using a measuring tape
Make a hole of 60 mm in diameter,
slightly descending to outside the wall.
Install piping hole cover and seal it
off with putty after installation
(Section of wall hole)
Piping hole pipe
Outdoor side
Thickness
of wall
Indoor side
Wall hole
60mm
G
Indoor unit
Floor fixing dimensions
of the outdoor unit
(Unit:mm)
Floor fixing dimensions
of the outdoor unit
(Unit:mm)
140
500
140
113.5
583
113.5
9 5.1
3
Floor fixing dimensions
of the outdoor unit
(Unit:mm)
140 140415
280
For 22k,24k,
15.88mm(5/8")
9.52mm(3/8")
Liquid pipe ( )
For 5k,7k,9k,10k
6.35mm(1/4")
Gas pipe ( ) 9.52mm(3/8")
For 12k,-18k
6.35mm(1/4")
12.7mm(1/2")
A=145mm
B= 60mm
30mm
HSU-22HEA03
HSU-24HEA03
18CRA03-T,
HSU-12LEA03
HSU-18LEA03
HSU-18LEA13-W
HSU-10LEA03-T
HSU-13LEA03-T
HSU-09LEB13-H
HSU-09LEA13-H
HSU-12LEA13-H
HSU-14LEA13-H
HSU-12LEB13-H
HSU-14LEB13-H
HSU-18LEA13-H
HSU-12CRA03-T
HSU-18CRA03-T
HSU-18HEA13(T3)
HSU-18HEA03(T3)
AMS12H03-N
AMS18H03-N
PAS18L03-N(T3)
HSU-12LEA13-M
HSU-18LEA13-M
HSU-18LEA03(T3)
HSU-18LEA13(T3)
HSU-12LEA13-F
HSU-09HEA03/(DB)
HSU-09HEA03/(BP)
HSU-12HEA03/(DB)
HSU-12HEA03/(BP)
HSU-12HEA03
HSU-18HEA03
HSU-22LEA03
HSU-24LEA03
HSU-22LEA13-W
HSU-18LEA03-T
AMS22H03-N
HSU-05LEA03
HSU-07LEA03
HSU-09LEA03
HSU-09LEA13-W
HSU-12LEA13-W
HSU-09LEA13-F
HSU-09HEA03
HSU-07HEA03
HSU-12HEB03
HSU-09CRA03-T
AMS09H03-N
YKS-09HEA03
YKS-12HEA03
YKS-18HEA03
YKS-22HEA03
A=145mm
B= 60mm
30mm
HSU-09LEA03-N
256
18LEA03-T,
HSU-18LED03-T
HSU-10LED03-T
HSU-13LED03-T
HSU-18LED03-T1
18LED03-T
18LEA03-T1
HSU-09LEN03
HSU-12LEN03
HSU-18LEN03
HSU-09HEC03
HSU-12HEC03
HSU-12CB2
HSU-18LB2
HSU-18LA2
HSU-12CA2
HSU-09CA2
HSU-24LA2
HEC-18LEA03(T3)
HSU-09LM11
HSU-12LM11
HSU-12HEA13-B
For 05K~12K
For 13K~24K
HSU-18HEA13-B
HSU-09HEA13-B
HSU-05LEA03/LW
HSU-09LEA03/LW
HSU-07LEA13-B HSU-09LEA13-B
HSU-07HEA13-B
HSU-10LX11
HSU-13LX11
HSU-18LX11
HSU-18LX11
HSU-12CA8M5
HSU-18LA8M5
18LA8M5
HSU-12LCJ03
HSU-09LCJ03
HSU-15LA8M5
Содержание
- Accessory parts 1
- Drawing for the installation of indoor and outdoor units 1
- Explain sufficiently the operating means to the user according to this manual 1
- Installation manual of room air conditioner 1
- Necessary tools for installation 1
- No 010515 136 1
- Read this manual before installation 1
- A 145mm 2
- As they become iow temperature in operation 2
- B 60mm 2
- Carry out based on the neighboring pillars or lintels a proper leveling for the plate to be fixed against the wall then temporarily fasten the plate with one steel nail 2 make sure once more the proper level of the plate by hanging a thread with a weight from the central top of the plate then fasten securely the plate with the attachment steel nail 3 find the wall hole location a using a measuring tape 2
- Equivalent insulation material 2
- Fitting of the mounting plate and positioning of the wall hole 2
- Floor fixing dimensions of the outdoor unit unit mm 2
- For 12k 18k 2
- For 5k 7k 9k 10k 2
- Gas pipe 9 2mm 3 8 2
- Hsu 05lea03 lw 2
- Hsu 09lcj03 2
- Hsu 09lea03 lw 2
- Hsu 09lea13 f 2
- Hsu 09lm11 2
- Hsu 10lx11 hsu 13lx11 2
- Hsu 12ca8m5 2
- Hsu 12lcj03 2
- Hsu 12lm11 2
- Hsu 15la8m5 2
- Hsu 18la8m5 2
- Hsu 18lx11 2
- Indoor unit 2
- Make a hole of 60 mm in diameter slightly descending to outside the wall install piping hole cover and seal it off with putty after installation 2
- Making a hole on the wall and fitting the piping hole cover 2
- Mm 1 2 2
- Mm 1 4 2
- Mm 3 8 liquid pipe 2
- Mm 5 8 2
- Selection of pipe 2
- To this unit both liquid and gas pipes shall be insulated 2
- Use optional parts for piping set or pipes covered with 2
- When the mounting plate is first fixed 2
- Connecting the indoor outdoor electric cable 3
- Indoor unit 3
- Removing the wiring cover 3
- When connecting the cable after installing the indoor unit 3
- Attaching drain elbow 4
- Connection of pipes 4
- For 22k 24k 4
- Outdoor unit 4
- Purging method 4
Похожие устройства
- Haier HSU-12LEB13-H Инструкция по эксплуатации
- Haier HSU-14LEB13-H Инструкция по монтажу
- Haier HSU-14LEB13-H Инструкция по эксплуатации
- Haier HSU-09CRA03-T Инструкция по монтажу
- Haier HSU-09CRA03-T Инструкция по эксплуатации
- Hyundai H-TAE100 Инструкция по эксплуатации
- Hyundai H-TAE120 Инструкция по эксплуатации
- Hyundai H-TAE140 Инструкция по эксплуатации
- Hyundai H-TAE200 Инструкция по эксплуатации
- Hyundai H-TAE220 Инструкция по эксплуатации
- Hyundai H-TAE240 Инструкция по эксплуатации
- Hyundai H-TAE260 Инструкция по эксплуатации
- Hyundai H-TAI400 Инструкция по эксплуатации
- Hyundai H-TAI260 Инструкция по эксплуатации
- Hyundai H-TAI280 Инструкция по эксплуатации
- Hyundai H-TAI380 Инструкция по эксплуатации
- Hyundai H-TAI100 Инструкция по эксплуатации
- Hyundai H-TAI200 Инструкция по эксплуатации
- Hyundai H-TAI220 Инструкция по эксплуатации
- Hyundai H-TAI240 Инструкция по эксплуатации