Contracor CCT [10/36] Storage

Contracor CCT [10/36] Storage
CONTRACOR
®
Version 2.0
10
Checking hose system for leakage: Adjust the supply pressure to 0.5 bar and then connect
the blast helmet to the BAF airline lter system, via the Contracor CCT Air Conditioner and the
breathing air supply hose. Using a suitable device, pinch the black air hose, interrupting the supply
to the blast helmet. Then, apply soapy water with a brush to the possible areas causing the leakage.
Soap bubbles clearly indicate any leakage. Comply with the instructions relevant to the chosen blast
helmet.
4.3. Maintenance schedule.
Prior to initial use: Functional test and leakage inspection.
Prior to use: Performance check by the user, check of regulator valve.
After use: Cleaning and disinfecting of the complete system.
Every 6 months: Cleaning and disinfecting of the complete system.
Functional check and leakage inspection of the complete system.
Cleaning and disinfecting of the breathing air connections.
5. Storage.
After use and cleaning, store the entire system in a cool, dry and dark location. Take
measures to ensure that no component parts of the system come into contact with oils,
grease, solvents, acids or other chemicals.