Timberk T-AC07-S29 Руководство по эксплуатации онлайн [8/52] 706417

Timberk T-AC07-S29 Руководство по эксплуатации онлайн [8/52] 706417
IM2020
8
Requirements for operations at raised height:
When carrying out installation at 2 m or higher above the base level, safety belts must be
worn and ropes of sufficient strength be securely fastened to the outdoor unit, to prevent
falling that could cause personal injury or death as well as property loss.
Grounding Requirements:
The air conditioner is the type I electrical appliance and must ensure a reliable grounding.
Do not connect the grounding wire to a gas pipe, water pipe, lightning rod, telephone line,
or a circuit poorly grounded to the earth.
The grounding wire is specially designed and shall not be used for other purpose, nor shall
it be fastened with a common tapping screw.
Others:
The model and rating value of the fuse shall be subject to the silkscreen on corresponding
controller or fuse sleeve.
INSTALLATION OF INDOOR UNIT
Dimension drawing of indoor unit installation
Fig. 2
Mounting plate
1. The wall for installation of the indoor unit shall be hard and firm, so as to prevent vibration.
2. Use the "+" type screw to fasten the peg board, horizontally mount the peg board on the wall,
and ensure the lateral horizontal and longitudinal vertical.
3. Pull the peg board by hand after the installation, to confirm whether it is solid.

Содержание

Скачать