RCF C 5212-96 [7/28] Installation

RCF C 5212-96 [7/28] Installation
7
ENGLISH
INSTALLATION
Loudspeakers are to be install by qualied personnel, respecting all safety standards.
Loudspeakers are to be installed securely.
Make sure the support structure (walls / ceilings) has the necessary mechanical
characteristics for the loudspeaker weight, without the risk of a fall that could damage
things or cause an injury.
Use attachments elements suitable for walls / ceilings (e.g. wall plugs for bricks, concrete, etc.).
a) HORIZONTAL MOUNTING WITH U BRACKET
NECESSARY OPTIONAL ACCESSORY:
- AC NC12 H-BR (for the C 5212-64, C 5212-66, C 5212-94, C 5212-96,
C 5212-99, C 7312-64, C 7312-94 models)
- AC NC15 H-BR (for the C 5215-64, C 5215-66, C 5215-94, C 5215-96,
C 5215-99, C 9315-64, C 9315-94 models).
Fix the U bracket to the wall / ceiling through at least 4 lateral wall plugs (max. M8) plus a
central one (max. M10).
Mount the U bracket to the loudspeaker by tightening the two M10x35 bolts into the two
central holes of the multiplates, as shown in the gure below.
As an alternative, it is possible to install the loudspeaker a bit less prominent, tanks to the U
bracket inner holes. Before tightening the two M10 bolts, adjust the loudspeaker vertical tilt
and then x it through two M5x20 bolts into one of the 7 small holes of the U bracket.
Note: do Not tilt the loudspeaker upwards!
iNstead of simple m10 bolts, it is possible to use the iNcluded kNobs (haviNg m10 bolts).
Скачать