Aqara SWK42 [132/217] Installation

Aqara SWK42 [132/217] Installation
Installation
Please make sure that the main switch of the power supply is off before
installation!
Aer the device powers on, all the conductors (including the antenna) of the
device may be connected with strong electricity. Please make sure that the
product is fixedly installed in a protective environment that cannot be reached by
hands, such as switch pattress and protective cover of the bulb.
Please do not overload it. Please make sure that the 10A over-current protection
circuit breaker on the front end of this product works normally before it powers on.
Recommended stripping length for terminal wiring: 6~8 mm.
1. According to the requirements, please connect the wires through any of the
following methods;
Method 1: L1 is connected to the load wire. S0 and S1 are connected to the two
ends of the external switch respectively. L is connected to the live wire, and N is
connected to the neutral wire (Diagram 1)
03

Содержание

Скачать