Kuppersberg RFCN 2011 X [44/96] Any replacement or maintenance of the led lam

Kuppersberg RFCN 2011 W [44/96] Any replacement or maintenance of the led lam
44
TECHNICAL PASSPORT ENGLISH
Refrigerators & Freezers
2.5 Starting
 Before turning on the refrigerator for the
rst time, wait approximately two hours after in-
stalling it before connecting it to the mains.
 Before putting fresh or frozen food into
the refrigerator, turn it on and let it run for about
2-3 hours, or 4 hours in summer when the ambi-
ent temperature is high.
 Leave enough free space for opening
doors, pulling out drawers and removing acces-
sories without obstruction.
Light source in this product is replaceable only by qualified engineers.
1. Please take out the
plug before removal.
3. Take down the lamp
panel.
4. Remove the connection
terminal.
2. Remove the lampshade with
a screwdriver.
Any replacement or maintenance of the LED lamps is intended
to be made by the manufacturer,its service agent or similar
qualified person.
Light source in this product is replaceable only by qualified engineers.
1. Please take out the
plug before removal.
3. Take down the lamp
panel.
4. Remove the connection
terminal.
2. Remove the lampshade with
a screwdriver.
Any replacement or maintenance of the LED lamps is intended
to be made by the manufacturer,its service agent or similar
qualified person.

Содержание

Похожие устройства

Скачать