Ada GroundDrill-15 HERCULES А00520 [6/32] Grounddrill 15 hercules

Ada GroundDrill-15 HERCULES А00520 [6/32] Grounddrill 15 hercules
MEASUREMENT FOUNDATION
6
GroundDrill-15 HERCULES
Maintenance Each use: Check engine oil. Check air lter.
First 5 hours: Change engine oil.
5. Preparation before operation
Handles must be placed on the frame in the following way: handle with gas handle must be located on the right side of the starter handle.
Place the screws into the holes of handles and frame. Tighten the screws with the instrument from the complete set.
CONNECTION OF THE THROTTLE LEVER ARM AND SWITCH ON BUTTON
Place the switch on button and the throttle lever arm on the handle of the ground drill. Tighten the locking screw. Put on the rubber
cover on the handle.
CONNECTION OF THE AUGER TO THE REDUCTION GEAR
Combine drive shaft and shank end. Insert the shaft into the shank end. Fix the connection with the help of pin. Use the adapter if you
want to set the auger bit with another type or diameter of the attachement.
AUGER CHECKUP
1. Check availability of all parts. This goes especially for the spark plug.
2. Check the air intake and outlet for clogging.
3. The auger uses an air-cooled engine. If the air passage is blocked, the engine may overheat.
4. Check the air lter for dirt. A dirty air cleaner will cause the auger to burn excess fuel.

Похожие устройства

Скачать