Gaggenau AI 280 [20/24] Installation

Gaggenau AI 280 [20/24] Installation
20
Installation
Note:
the extractor hood is to be installed to a kitchen
ceiling or suspended ceiling. Ensure that the ceiling
is capable of providing a firm hold for a maximum
weight of hood and accessories of 45 kg.
Before marking the securing holes, make sure that
no electricity wires or water pipes or other wires/
pipes are laid at the drilling points in the ceiling.
Before installation check the enclosed wall plugs
and screws are suitable for your ceiling. If
necessary use special wall plugs.
Installation of the extractor hood:
1 Using the drilling template mark the position of
the screws on the ceiling.
2 Drill 4 holes Ø 8 mm for the wall plugs. Push
the plugs flush with the ceiling.
3 Turn two screws to a 10 mm gap. Both screws
are placed in a position, in which at a later
stage of the installation the key-holes of the
supporting frame are found (namely back left
and front right from the control panel of the
hood).
4 Adjust the support frame to the desired height
and secure with 8 screws (12 screws for the
longer ventilation ducts). The length of the
support frame can be adjusted in steps of
20 mm.
Note:
ensure that the minimum distance between the
hob and the extractor hood is maintained -
600 mm for an electric hob and 700 mm for a
gas hob.
Circulating air mode only: there are four brackets,
which fix the circulating air switch module to the top
of the support frame. These should be bent outward
in a 90° angle.
346
200
Circulating air mode only

Похожие устройства

Скачать