Sea-Doo GTX Limited iS 2009 Инструкция по эксплуатации онлайн [369/555] 12053

Sea-Doo GTX Limited iS 2009 Инструкция по эксплуатации онлайн [369/555] 12053
Section 05 ELECTRICAL SYSTEM
Subsection 07 (GAUGE)
smr2009-036-006_a
BATTERY VOL
TAGE TEST
7. Remove the cover from fuse box 2 (FB2).
2009-027-009_a
1. Fuse box #1
2. Fuse bo
x#2
8. Press the START/STOP button to energize elec-
trical system and install the D.E.S.S. key.
9. Test f
or battery voltage between each of the
termi
nals atop the gauge fuse and battery
groun
d as per following table.
VOLTAGETESTATFB1
GAUGE
FUSE
TEST P
ROBES
READI
NG
A12
(Vio
let)
Fuse pin
numb
ers
A11
(Vio
let)
Battery (-)
post
Battery
Vdc
smr2009-027-011_g
VOLTAGE TES
TATFUSECONTACTS
smr2009-027-011_d
TYPICAL -
CONTACT COORDINATES (FRONT VIEW FB1)
If battery voltage is measured at A12 but not at
A11 (with fuse installed), replace the fuse.
If no volt
age is measured at fuse contact A12,
slightly
lift one corner of the long bus-bar (12
contacts
long).
10. Measure for battery Vdc between the bus-bar
and battery ground.
smr2009-036-007_a
VOLTAGE TEST AT LONG BUS-BAR
If bat
tery voltage is measured at the long bus-bar,
repai
r or replace the wire jumper C12 to A12 (be-
hind f
use box).
If no voltage is measured at the long bus-bar,
test for voltage at the short bus-bar, refer to the
POWER DISTRIBUTION
subsection.
346 smr2009-036
Скачать