Section 07 BODY AND HULL
Subsection 02 (BODY)
smr2009-042-005_a
1. Disconnect these connectors
14. Detach steering cable from steering column.
14.1 Remove bolt securing ball joint to steer-
ing column.
smr200
9-042-006_a
1. Steering cable ball joint
2. Steering column
14.2 Remov
e bolts retaining steering cable
clamp
.
14.3 Unlatch steering cable clamp.
smr2009-042-007_a
1. Steering column
2. Steering column clamp bolts
3. Steering column clamp
4. Steering cable adjusting nut
14.4 Place steering in its lower position.
14.5 Free steering cable from fixed clamp.
15. Install lifting straps.
15.1 Using both mooring cleats under steer-
ing, install two lifting straps.
smr2009-042-079_a
1. Front lifting strap hooks into steering mooring cleats
15.2 Install a
nother lifting strap on seat handle.
16. Attach all lifting straps to an lifting device to
lift the moving deck. Make sure lifting device
is located at the center of the vehicle to rise
moving deck horizontally.
17. Raise moving deck slowly and drive steering
cable out of steering column.
18. Place th
e moving deck on a level surface.
Moving Deck Installation
1. Instal
l 2 pieces of wood under lateral supports.
smr2009-042-071
2. Slowly, lower the moving deck just enough to
able to insert the end of steering cable in steer-
ing column.
NOTICE
Mak
e sure not to pinch electrical har-
nes
s while lowering the moving deck.