Fubag ti 2600 [23/70] Operator s manual

Содержание

rubaq Operator s manual www fubag ru NOTE Some appliances can cause an overload and as a result red overload indicator turns on and current feed stops Electric engines during startup usually consume 2 3 times more energy than in normal mode 1 Before start the two stations in parallel mode disconnect it from all connected electrical loads 2 Connect the parallel connection plugs of the device 2 into the socket 3 on the front of the station 3 Connect the ground clamp 4 to ground terminal 5 on the station 4 Always ground the generator if connected customers are grounded 5 Start each motor according to the procedure specified in the STARTING If after the engine start instead of green output indicator a red overload indicator will turn on the ignition switch should be put in position STOP OFF Switch off the engine and then restart the engine Important Check the connection of the load cable on each power station If any of the cables is not connected the generator could be damaged during startup 6 Make sure that all connecting appliances are turned off and then insert the appliance electric plug 7 into AC socket of the device for parallel connection 6 NOTE Make sure that connecting appliance is turned off Switched on appliance can suddenly start to work during the connection which can lead to injury or accident 22