Falmec Mirabilia Isola 85 Fenice Vetro (800) ECP [22/72] Instructions for mirabi1ja island 85 island 65 central chimney

Falmec Mirabilia Isola 85 Fenice Vetro (800) ECP [22/72] Instructions for mirabi1ja island 85 island 65 central chimney
20
Phase 3
- To prevent the hood from detaching if pressure is exerted from beneath, secure it to the wall
with the brackets supplied (fig. O3).
- Fit pipe/hose (E) into (D).
Phase 4
Place extension (H) in the chimney (G) and fasten this assembly to the body of the hood
using screws (V1).
- Slide the extension (H) until it is positioned at the desired height.
- Once you have found the best position, lean the bracket (L) on the wall, verify the horizontal
alignment with a spirit level and mark 2 drilling points at the ends.
- Drill the holes, insert 2 expansion bolts of 4mm ø and fasten the bracket (L) with the relative
screws.
- Tighten the extension (H) to the bracket (L) using screws (M).
- Power the hood in accordance with regulations in force (sec. D).
O2 -
INSTRUCTIONS FOR MIRABILIA ISLAND 85/ISLAND 65 CENTRAL CHIMNEY
Phase 1
- Identify the desired height for the positioning of the hood.
- Slide the lattice-works (C) and (C1) to the desired height (H2), then block them with the 8 self-
threading screws (V2) (Fig.1a).
- Fasten the lattice-work (C) to the ceiling using the four Ø 8 expansion plugs and relative
screws(V1) (Fig.1b).
Phase 2
- Insert the extension on the flue and fasten them to each other with masking tape (Fig. 2).
- Fasten the flue-extension assembly (D+E) to the lattice-work (C) with the 4 M4 metric screws
(V3) inserted in the existing holes without tightening them completely (Fig. 2).
- For suction version: identify the optimal height for the rigid or flexible exhaust pipe (F) and
connect it to the motor connection.
Phase 3
- Raise the hood, hooking it onto the 4 M5 metric screws (V4) pre-tightened to the lattice-work
(C) (center the Ø11 holes on the slot of the inner liner and move it laterally)(Fig. 3a).
- Completely tighten the 4 M5 screws (V4) (Fig. 3b).
-
Remove the masking tape (Fig. 3c), remove the four M4 metric screws (V3) previously tightened
onto the lattice-work (Fig. 3d) and slide the flue-extension assembly downwards. (Fig. 3e).
- Connect the pipe to the connection of the ceiling discharge hole. (Fig. 3f).
- Make electrical connections only after having removed electrical power supply.
- Fasten the extension to the lattice-work (C) by means of the 4 M4 metric screws (V3), without
tightening them completely(Fig. 3g).
- Block the extension completely to the lattice-work (C) by screwing down the 4 M4 metric
screws (V3).
- Block the flue with the 2 self-threading screws (V5) (Fig. 3i).
- Use the extension support elements(A) (Fig. 2) only if the upper lattice-work is not used, or in
the case of a false ceiling.
- Fit the glass panels (fig. O5).

Содержание

Похожие устройства

Phase 3 To prevent the hood from detaching if pressure is exerted from beneath secure it to the wall with the brackets supplied fig 03 Fitpipe hose E into D Phase 4 Place extension H in the chimney G and fasten this assembly to the body of the hood using screws V1 Slide the extension H until it is positioned at the desired height Once you have found the best position lean the bracket L on the wall verify the horizontal alignment with a spirit level and mark 2 drilling points at the ends Drill the holes insert 2 expansion bolts of 4mm o and fasten the bracket L with the relative screws Tighten the extension H to the bracket L using screws M Power the hood in accordance with regulations in force sec D 02 INSTRUCTIONS FOR MIRABI1JA ISLAND 85 ISLAND 65 CENTRAL CHIMNEY Phase 1 Identify the desired height for the positioning of the hood Slide the lattice works C and CD to the desired height H2 then block them with the 8 self threading screws V2 Fig 1a Fasten the lattice work C to the ceiling using the four 0 8 expansion plugs and relative screws V1 Fig lb Phase 2 Insert the extension on the flue and fasten them to each other with masking tape Fig 2 Fasten the flue extension assembly D E to the lattice work C with the 4 M4 metric screws V3 inserted in the existing holes without tightening them completely Fig 2 For suction version identify the optimal height for the rigid or flexible exhaust pipe F and connect it to the motor connection Phase 3 Raise the hood hooking it onto the 4 M5 metric screws V4 pre tightened to the lattice work C center the 011 holes on the slot of the inner liner and move it laterally Fig 3a Completely tighten the 4 M5 screws V4 Fig 3b Remove the masking tape Fig 3c remove the four M4 metric screws V3 previously tightened onto the lattice work Fig 3d and slide the flue extension assembly downwards Fig 3e Connect the pipe to the connection of the ceiling discharge hole Fig 3f Make electrical connections only after having removed electrical power supply Fasten the extension to the lattice work C by meansof the4 M4 metric screws V3 without tightening them completely Fig 3g Block the extension completely to the lattice work C by screwing down the 4 M4 metric screws V3 Block the flue with the 2 self threading screws V5 Fig 3i Use the extension support elements A Fig 2 only if the upper lattice work is not used or in the case of a false ceiling Fit the glass panels fig 05 20

Скачать