Hitachi RAM-35QH5 [2/2] Air purging by vacuum pump
![Hitachi RAM-35QH5 [2/2] Air purging by vacuum pump](/views2/1332615/page2/bg2.png)
4. Preparation of Pipe
●
Use a pipe cutter to cut the copper pipe.
●
Before flaring, please put on the flare nut.
Outer
Diameter (Ø)
6.35 (1/4”)
9.52 (3/8”)
For R410A tool
0
~
0.5mm
0
~
0.5mm
For R22 tool
A (mm)
●
Recommend to use
R410A flaring tool.
Copper
pipe
Trimming tool
A
Die
Die
Copper pipe
1.0mm
1.0mm
Wrench
Torque
wrench
Flare nut
Outer diameter of pipe (Ø)
Torque N·m (kgf
·
cm)
Small diameter side
●
Please be careful when bending the copper pipe.
●
Screw in manually while adjusting the center. After that, use of torque wrench to tighten the connection.
Large diameter side
6.35 (1/4”)
13.7-18.6 (140-190)
9.52 (3/8”) 34.3-44.1 (350-450)
Small diameter side
Large diameter side
6.35 (1/4”)
19.6-24.5 (200-250)
9.52 (3/8”)
19.6-24.5 (200-250)
Valve head
cap
12.3-15.7 (125-160)
Valve core cap
Connecting cord should have
arranged with piping using tape
previously.
Indoor unit No. 1
Indoor unit No. 2
Pipe connection port for Indoor unit No. 1
Pipe connection port for Indoor unit No. 2
CAUTION
!
●
In case of removing flare nut of a indoor unit, first remove a nut of small diameter side, or seal cap of large
diameter side will fly out. Free from water into the piping when working.
●
During connection, keep away from water.
●
Be sure to tighten the flare nut to the specified torque using a torque wrench. If the flare nut is tightened
excessively, it may crack as time elapses, causing refrigerant leakage.
●
Install the unit in a stable place to minimize vibration or noise.
●
After arranging the cords and pipes, secure them in place.
Gas leakage inspection
Please use gas leakage detector to check if leakage occurs
at connection of flare nut as shown on the right.
If gas leakage occurs, further tighten the connection to stop
leakage. (Use the detector provided for R410A)
Lo Hi
Vacuum for more
than 10 min.
Stop valve
Charge hose
Stop
valve
Vacuum pump adapter
Be sure the stop valve
is always fully opened.
Valve cap
Valve cap of valve core
Valve cap
Valve cap
Valve core
Valve cap of
valve core
Stopper
O-Ring
Pipe
Pipe
Seal cap
Flare nut
Spindle
Meter showing pressure
When the meter reaches -101KPa (-76cmHg) during
pumping, fully tighten the shuttle.
Air purging by vacuum pump
Closed
Vacuum pump
R410A Manifold valve
When pumping starts,
slightly loosen the flare
nut to check of air
sucked in. Then tighten
the flare nut.
The refrigerant channel is opened so
that the refrigerant will flow from the
outdoor unit into the indoor unit.
Remove the valve cap of valve core.
Run the vacuum pump.
Stop the vacuum pump.
Connect the charge hoses to the
vacuum pump and the charge port of
the valve core large dia. pipe side
service valve, respectively.
Remove the valve cap from the
spindle of the service valve.
Disconnect the charge hose from the
service valve.
Tighten the valve cap of valve core.
[Torque 12.3 - 15.7 N
¥
m (125 - 160
kgf
¥
cm)]
Attach the valve cap to the spindles
of each large and small dia. pipe
side service valves.
Tighten the valve cap of the spindle.
[Torque 19.6 - 24.5 N
¥
m (200 - 250
kgf
¥
cm)]
Turn the spindles of each large and
small dia. pipe side service valves
full counterclockwise until they are
securely tightened. Then retighten
them more than 10 degrees [using a
hexagon wrench key (4mm )
without fail].
Fully open the LO knob of the
manifold valve.
Close the LO knob of the manifold
valve.
Tighten all the way by hand.
Do not tighten all at once, but tighten it while
fitting the flared surface to the pipe.
CAUTION
!
5. Pipe Connection
5.1 Pipe connection
Connecting the pipe to outdoor unit
(1) Remove the flare nut and seal cap from the service valve.
(2) Apply refrigerator oil to the service valve and the flared portion
of the pipe.
(3) Using a wrench, security tighten.
●
Jagged edge will cause leakage.
●
Point the side to be trimmed downwards during trimming to
prevent copper chips from entering the pipe.
7. Operation test
●
Please ensure that the air conditioner is in normal operating condition during the operation test.
●
Explain to your customer the proper operation procedures as described in the user’s manual.
●
If the indoor unit does not operate, check to see that the connections are correct.
CAUTION
●
Trial run should be conducted on one unit at a time to check for incorrect
wiring of connecting cord.
!
6. Removal Of Air From The Pipe And Gas Leakage Inspection
6.1 Air purging by using vacuum pump
Fig. 6-1
Fig. 6-2
Fig. 6-3
<
IA586: C
>
INS RAM-35QH5 31/3/09, 12:262
Содержание
- Be sure that the unit operates in proper condition after installation explain to customer the proper way of operating the unit as described in the user s guide 1
- Cable length 1
- Carefully read through the procedures of proper installation before starting installation work 1
- Caution 1
- Checking for the electric source and the voltage range 1
- Connection of the connecting cords and power cord 1
- Fig 3 1 1
- Fig 3 2 1
- Fig 3 3 1
- Figure showing the installation of outdoor unit 1
- Flare tool vacuum pump adapter manifold valve charge hose vacuum pump 1
- For service personnel only 1
- Hexagonal wrench key 4mm 1
- Ia586 c 1
- If you wish to prepare the copper tubes and insulation material in the field we recommend the following 1
- Indoor unit 2 indoor unit 1 1
- Installation procedure and notice 1
- Mark is exclusive use tool for r410a 1
- Measuring tape 1
- Names of outdoor components 1
- Outdoor unit 1
- Outdoor unit pipe connection port 1
- Pipe cutter 1
- Please note the following matters and obtain permission from customer before installation 1
- Pliers 1
- Proper place for installation 1
- Read the safety precautions carefully before operating the unit 1
- Safety precaution 1
- Screwdriver 1
- Split unit air conditioner installation manual 1
- The contents of this section are vital to ensure safety please pay special attention to the following sign 1
- The sales agent should inform customers regarding the correct operation of installation 1
- Up to 1 6m up to 15m up to 25m 1
- Vinyl tape 1
- Warning 1
- Warning incorrect methods of installation may cause death or serious injury caution improper installation may result in serious consequence make sure to connect earth wire this sign in the figures indicates prohibition 1
- Wire cross section 1
- Wiring 1
- Wrench 14 17 22 26mm gas leakage detector 1
- Ø 65mm power drill 1
- Air purging by vacuum pump 2
- Caution 2
- Ia586 c 2
Похожие устройства
- Hitachi RAM-35QH5 Каталог кондиционеров Hitachi
- ТОРГМАШ М-600 Инструкция по эксплуатации
- ТОРГМАШ М-600 Сертификат
- ТОРГМАШ М-600 Каталог оборудования ТОРГМАШ
- Haier AB36ES1ERA(S) / 1U36HS1ERA(S) Инструкция по эксплуатации и монтажу
- Haier AB36ES1ERA(S) / 1U36HS1ERA(S) Каталог оборудования Haier
- Haier AB36ES1ERA(S) / 1U36HS1ERA(S) Сертификат
- Hitachi RAK-18NH5 Инструкция по эксплуатации
- Hitachi RAK-18NH5 Инструкция по установке
- Hitachi RAF-25NX2 Инструкция по эксплуатации
- Hitachi RAF-25NX2 Каталог кондиционеров Hitachi
- Panasonic CS-YW7MKD / CU-YW7MKD Инструкция по эксплуатации
- Panasonic CS-YW7MKD / CU-YW7MKD Сертификат
- Panasonic CS-W07MKD / CU-W07MKD Инструкция по эксплуатации
- Panasonic CS-W07MKD / CU-W07MKD Сертификат
- Haier AD12SS1ERA(N)(P) / 1U12BS3ERA Инструкция по эксплуатации
- Haier AD12SS1ERA(N)(P) / 1U12BS3ERA Сертификат
- Smeg CTP1015 Инструкция по эксплуатации
- Haier AD18SS1ERA(N)(P) / 1U18FS2ERA Инструкция по эксплуатации
- Haier AD18SS1ERA(N)(P) / 1U18FS2ERA Каталог оборудования Haier