6.1.5. Cleaning of painted parts
Do not clean the painted parts with wet rags when the unit is in
operation or hot to prevent thermal shock to the paint which may cause
it to detach. Do not use abrasive or aggressive products or materials.
Clean with damp cotton or paper towels.
The silicon paints used to paint MCZ products possess the
highest quality technical characteristics that make them
resistant to very high temperatures.
There is however a physical limit (380°-400°) beyond which
the paint begins to fade or (over 450°) to vitrify; it may then
flake and detach from the steel surface. If these effects are
noticed, it means temperatures have been reached that are
well above those at which the product should properly
operate. Therefore, you should use the amount of fuel
specified in the technical tables.
6.1.6. Cleaning and characteristics of marble and
steatite cladding.
Steatite and marble are natural materials taken from
blocks of stone and then worked. Therefore, veins,
colour variations or other characteristics are natural
parts of the stone and should not be considered
defects.
It is important to clean carefully and with the correct
products. Cleaning the cladding incorrectly may stain
or damage the finish of the stone or marble.
Cleaning of these materials is very important and delicate. It must be
done using materials that are specifically for stone/marble.
Carefully follow the instructions on the packages of the special products
used for cleaning. Generally, you should always use water-based
materials and a soft cotton cloth.
6.1.7. Cleaning flue pipe
Mechanical cleaning of the flue pipe is recommended at least once a
year. Excessive deposits of unburnt solid material can cause problems
with the evacuation of smoke, and gives rise to a risk of chimney fires
6.2. CLEANING BY SPECIALISED PERSONNEL
WARNING:
The frequency with which the stove is cleaned should
be determined based on the type of use that is made
of the stove and the type of installation.
MCZ suggests relying on an authorized service centre
for end-of-season cleaning and maintenance, who will
carry out all of the previously mentioned work and
make a general check of the stove's components.
Содержание
- Anthea myria luna quasar nadir pulsar sirio zenit venus cometa alpha orion modulo legna 1
- Bimschv art 15a b vg vkf aeai regensburger bstv erfüllt 2
- Bimschv art 15a b vg vkf aeai regensburger münchener bstv erfüllt 2
- Contents technical service mcz s p a all rights reserved reproduction prohibited 2
- Leggere e seguire le istruzioni lire et suivre les instructions bedienungsanleitung lesen und beachten lees en respecteer de aanwijzingen 2
- Mg nm3 13 o2 33 mg mj 2
- Mg nm3 13 o2 9 mg mj 2
- Modulo legna 2
- Quasar 2
- How to read the manual 4
- Introduction 4
- Manual preservation 4
- Revisions to the publication 4
- Script 4
- Operating warnings 5
- Safety warnings 5
- Warnings and warranty conditions 5
- Warranty conditions 5
- Exclusions 6
- Restrictions 6
- Notions for installation according to uni 10683 7
- Operating area 7
- Precautions 7
- External air outlet 8
- Chimney flue 9
- Chimney flue connections 9
- Max 2 mt 9
- Examples of chimney flues 10
- Chimenypot 11
- Dimensions and technical specifications 12
- Prestige line 12
- Ø 150 12
- 320 ø 150 13
- Ø 150 13
- 320 ø 150 14
- Design line 15
- Ø 150 15
- Ø 150 17
- Modulo line 18
- Ø 150 18
- Installation and assembly 19
- Positioning 19
- Preparation and unpacking 19
- Assembly and feet adjustment 20
- Ceramics assembly 20
- Frame assembly wood module 20
- Do not demand full heating performance straight away 21
- Operation 21
- Pre lighting warnings 21
- Control of combustion 22
- Loading the fuel 22
- Stove use 22
- First lighting 23
- Max min 23
- Model adjustments luna myria anthea modulo 23
- Model adjustments pulsar nadir 23
- Model adjustments quasar orion sirio venus cometa zenit alpha 23
- Attention 24
- Chapter 24
- Emergency treatment 25
- Cleaning of stainless steel and satin finish surfaces 26
- Cleaning out the ashes 26
- Cleaning the glass 26
- Cleaning to be performed by the user 26
- Cleaning upper calorite deflectors 26
- Maintenance and cleaning 26
- Cleaning and characteristics of marble and steatite cladding 27
- Cleaning by specialised personnel 27
- Cleaning flue pipe 27
- Cleaning of painted parts 27
Похожие устройства
- MCZ Quasar Сертификат
- MCZ Forma Gas 95 Инструкция по эксплуатации
- MCZ Forma Gas 95 Руководство по установке
- MCZ Forma Gas 95 Сертификат
- MCZ Pulsar salt&pepper/sand/bordeaux Инструкция по эксплуатации
- MCZ Forma Gas 115 Инструкция по эксплуатации
- MCZ Forma Gas 115 Руководство по установке
- MCZ Forma Gas 115 Сертификат
- Green GRI/GRO-09 IH Инструкция по эксплуатации
- Green GRI/GRO-09 IH Сертификат
- Green GRI/GRO-09 IH Гарантийный талон
- MCZ Quasar Acciaio black Инструкция по эксплуатации
- MCZ Quasar Acciaio black Сертификат
- VIATTO DH-30B-A 220В Инструкция по эксплуатации
- VIATTO DH-30B-A 220В Каталог оборудования VIATTO
- Bartscher 135017 Инструкция по эксплуатации
- Bartscher 135017 Паспорт на Bartscher 135017 (англ.)
- Bartscher 135017 Схема
- Bartscher 135017 Электрическая схема
- Bartscher Deli II 306.054 Инструкция по эксплуатации