CALPEDA B-N4 65-315A [12/44] Electrical connection

CALPEDA B-N4 32-200B/A [12/44] Electrical connection
between pump casing feet and baseplate.
First tighten the screws joining the foot and the
base and then, the screw between the foot and the
support. In this way, alignment will not be altered by
the support foot.
After alignment procedure, before star-
ting the pump attatch the coupling guard
(safety protection against
accidental con-
tact).
5. Electrical connection
Electrical connection must be carried
out only by a qualified electrician in
accordance with local regulations.
Follow all safety standards.
The unit must be properly earthed (grounded).
Compare the frequency and mains voltage with the
name-plate data and connect the supply conduc-
tors to the terminals in accordance with the name-
plate specifications and the operating instructions
(if available) of the motor.
With motor power rating 5,5 kW, avoid direct
starting. Provide a control panel with star-
delta starting or an other starting device.
Install a device for disconnection from the mains
(switch) with a contact separation of at least 3 mm
on all poles.
Install an overload pro
tection device appropriate
for the rated current of the pump.
6. Starting
ATTENTION: never run the pump dry - not
even for a short trial run.
Start the pump after filling it completely with liquid.
When the pump is located above the water
level (suction lift operation, fig. 4) or with a positi-
ve suction head which is too low (less than 1 m)
to open the non-return valve, fill the suction pipe
and the pump through the priming hole (fig. 8).
Replace threaded plug after each operation.
When the liquid level on the suction side is
above the pump (inflow under positive suction
head), fill the pump by opening the suction gate
valve slowly and completely, keeping the delivery
gate valve open to release the air.
Close the delivery gate valve completely, and check
the pressure of the suction head to make sure the
maximum final pressure does not then exceed 10 bar.
Start the pump with the delivery gate valve clo-
sed. Then slowly open the discharge gate valve and
proceed to regulate the pump duty point within the
limits indicated on the nameplate.
Never run the pump for more than five
minutes with a closed gate valve.
Make sure the direction of rotation is as shown by
the arrow on the pump casing. If rotation is in the
opposite direction disconnect electrical power and
reverse the connections of two phases.
6.1. Stopping
Close the delivery gate valve if a check valve is
not fitted.
Close the suction gate valve if a foot valve is not fitted.
Switch off the motor.
7.
Periodical checks and maintenance
Make sure the pump operates in conformity with
the range of specified levels of performance and
that absorbed current indicated on the nameplate
is not exceeded.
Check the alignment of the coupling (see section 4.).
7.1. Pumps with mechanical seal
Mechanical seals do not require maintenance.
Except for possible initial leakage after the first
start-up, the mechanical seal on the shaft must
function without any loss of liquid.
Do not run the pump when dry.
When a leak occurs and gradually increases, the
seal must be replaced.
Replacing the mechanical seal (see section 8).
Make sure that the spring of the new seal has a
clockwise winding (when viewing the seal from
the stationary part) to conform with the direction
of rotation of the shaft.
Make sure that all the parts which the seal comes
into contact with are clean and that there are no
cutting edges or burr on the chamfered edges
where the elastic seal rings are fitted in the sea-
ting of the fixed part and on the shaft or shaft
sleeve.
ATTENTION: never allow seal rings in EPDM
(Ethylene-Propylene-Diene Monomer) to
come
into contact with oil or grease. To make
assembly easier, lubricate the seatings and seal
rings with water or other liquids compatible with
the material in which the seal rings are made.
Care must be taken to avoid damaging the seal
surfaces by impact.
12
4.93.141
Fig. 8 Filling.

Содержание

between pump casing feet and baseplate First tighten the screws joining the foot and the base and then the screw between the foot and the support In this way alignment will not be altered by the support foot A After alignment procedure before star ting the pumpattatch the coupling guard safety protection against accidental con tact 5 Electrical connection A Electrical connection must j out only by a qualified accordance with local regulations Follow all safety standards be carried electrician in The unit must be properly earthed grounded Compare the frequency and mains voltage with the name plate data and connect the supply conduc tors to the terminals in accordance with the name plate specifications and the operating instructions if available of the motor With motor power rating 5 5 kW avoid direct starting Provide a control panel with star delta starting or an other starting device Install a device for disconnection from the mains switch with a contact separation of at least 3 mm on all poles Install an overload protection device for the rated current of the pump appropriate 6 Starting___________________________ ATTENTION never run the pump dry not even for a short trial run Start the pump after filling it completely with liquid When the pump is located above the water level suction lift operation fig 4 or with a positi ve suction head which is too low less than 1 m to open the non return valve fill the suction pipe and the pump through the priming hole fig 8 Replace threaded plug after each operation Fig 8 Filling When the liquid level on the suction side is above the pump inflow under positive suction head fill the pump by opening the suction gate 12 valve slowly and completely gate valve open to release the air keeping the delivery Close the delivery gate valve completely and check the pressure of the suction head to make sure the maximum final pressure does not then exceed 10 bar Start the pump with the delivery gate valve clo sed Then slowly open the discharge gate valve and proceed to regulate the pump duty point within the limits indicated on the nameplate A Never run the pump for more than five minutes with a closed gate valve Make sure the direction of rotation is as shown by the arrow on the pump casing If rotation is in the opposite direction disconnect electrical power and reverse the connections of two phases 6 1 Stopping Close the delivery gate valve if a check valve is not fitted Close the suction gate valve if a foot valve is not fitted Switch off the motor 7 Periodical checks and maintenance Make sure the pump operates in conformity with the range of specified levels of performance and that absorbed current indicated on the nameplate is not exceeded Check the alignment of the coupling see section 4 7 1 Pumps with mechanical seal Mechanical seals do not require maintenance Except for possible initial leakage after the first start up the mechanical seal on the shaft must function without any loss of liquid Do not run the pump when dry When a leak occurs and gradually increases the seal must be replaced Replacing the mechanical seal see section 8 Make sure that the spring of the new seal has a clockwise winding when viewing the seal from the stationary part to conform with the direction of rotation of the shaft Make sure that all the parts which the seal comes into contact with are clean and that there are no cutting edges or burr on the chamfered edges where the elastic seal rings are fitted in the sea ting of the fixed part and on the shaft or shaft sleeve ATTENTION never allow seal rings in EPDM Ethylene Propylene Diene Monomer to come into contact with oil or grease To make assembly easier lubricate the seatings and seal rings with water or other liquids compatible with the material in which the seal rings are made Care must be taken surfaces by impact to avoid damaging the seal