INSTALLATION
Installation and maintenance should be carried out by technical
personnel qualified for this type of machine, in compliance with
current safety regulations.
When receiving the unit please check its state, verifying if any
damage occurred during the transport.
Refer to the relevant technical sheets for installation and use of
possible accessories.
Identify model and version of the unit from the indications stated on
the carton package.
U
SE
AND
OPERATING
LIMITS
Daikin shall not be held liable
- if the unit has been installed by non-qualified personnel,
- if the unit has been used improperly,
- if the unit has been used under conditions that are not permitted,
- if maintenance operations specified in this manual have not been
carried out,
- if non original spare parts have been used.
Keep the unit in its packaging until it is ready to be installed, to
prevent dust getting inside.
Operating limits are shown here below; all other uses are considered
improper:
thermal fluid: water/glycol
water temperature: 5°C~95°C
maximum operating pressure: 10 bar
air temperature: 5°C~43°C
voltage tolerance: ±10%
Selection of location:
do not install the unit in rooms where inflammable gases are
present
do not let water spray directly on the unit;
install the unit on ceilings or walls that bear its weight. Leave
enough space all around for proper operation and maintenance
of the unit, taking into account all installed optional accessories.
never place the heating unit immediately under an electric
plug-socket.
D
IMENSIONS
(See figure 1)
I
NSTALLATION
Remove the cabinet, where existing, by unscrewing the 4 fastening
screws reachable through the lifted side doors (see figure 2). In case
of FWL versions, also unscrew the 2 screws on the front panel.
Install the basic unit onto the wall/ceiling using the 4 mounting slots
and the supplied anchor screws, keeping the unit at least 100 mm
above the floor for a proper air suction and an easy pulling out of the
filter in case of FWV and FWM models. In case of ceiling models
FWM and FWL verify that the installation height corresponds to what
is specified in figure 3, in order to avoid excessive hot air stratification
in the upper part of the room; in case of greater installation heights
we suggest to proceed with the back suction from the lower part of
the room. The installation heights refer to the maximum running
speed.
Carry out the hydraulic connections to the heat exchanger and in
case of cooling operation, to the water drainage system.
In case of cooling applications, make sure to insulate all field installed
piping and fittings as to avoid condensate dripping on the floor. Non
insulated piping can cause water damage!
We suggest to provide for the water inlet from the bottom side of the
heat exchanger and the outlet on the upper side.
For a better water drainage lean the drain pipe downwards at least
3 cm/m avoiding loops or narrowing on its way.
FWV
FWL
FWM
Fan coil units
Installation and
operation manual
Read this manual attentively before starting up the unit. Do
not throw it away. Keep it in your files for future reference.
Improper installation or attachment of equipment or
accessories could result in electric shock, short-circuit,
leaks, fire or other damage to the equipment. Be sure only
to use accessories made by Daikin which are specifically
designed for the use with the equipment and have them
installed by a professional.
If unsure of installation procedures or use, always contact
your Daikin dealer for advice and information.
The optional EEH (electric heater kit) cannot be mounted
on units which are set up for 4-pipe systems (=FW*CAFN,
FW*CAFV or option ESRH)
1
Clear space for hydraulic connections
(*)
(*) Indications applicable to units with hydraulic connections on the left side; in case
of right side connections the indications for "clear space" are reversed.
2
Slots for wall/ceiling mounting 9 x 20 mm
3
Clear space for electric connections
(*)
4
Hydraulic connections (4 DF = 4 pipe system)
5
Condensate drainage for vertical installation
6
Air outlet for concealed models
7
Air suction for concealed models
8
Condensate draining for horizontal installation
9
Air outlet
10
Air inlet
1D_I+OM_4PW17548-1B.book Page 1 Wednesday, October 5, 2005 9:04 AM

Содержание

I OM_4PWI7548 IB book Pagel Wednesday October 5 2005 9 04 AM DAIKIN FWV FWL FWM Installation and operation manual Fan coil units Read this manual attentively before starting up the unit Do not throw it away Keep it in your files for future reference Improper installation or attachment of equipment or accessories could result in electric shock short circuit leaks fire or other damage to the equipment Be sure only to use accessories made by Daikin which are specifically designed for the use with the equipment and have them installed by a professional If unsure of installation procedures or use always contact your Daikin dealer for advice and information DIMENSIONS See figure 1 1 Clear space for hydraulic connections1 2 Slots for wall ceiling mounting 9 x 20 mm 3 Clear space for electric connections1 1 4 Hydraulic connections 4 DF 4 pipe system 5 Condensate drainage for vertical installation 6 Air outlet for concealed models 7 Air suction for concealed models 8 The optional EEH electric heater kit cannot be mounted on units which are set up for 4 pipe systems FW CAFN FW CAFV or option ESRH Condensate draining for horizontal installation 9 Air outlet 10 Air inlet Indications applicable to units with hydraulic connections on the left side in case of right side connections the indications for clear space are reversed BEFORE INSTALLATION INSTALLATION Installation and maintenance should be carried out by technical personnel qualified for this type of machine in compliance with current safety regulations Remove the cabinet where existing by unscrewing the 4 fastening screws reachable through the lifted side doors see figure 2 In case of FWL versions also unscrew the 2 screws on the front panel When receiving the unit please check damage occurred during the transport Install the basic unit onto the wall ceiling using the 4 mounting slots and the supplied anchor screws keeping the unit at least 100 mm above the floor for a proper air suction and an easy pulling out of the filter in case of FWV and FWM models In case of ceiling models FWM and FWL verify that the installation height corresponds to what is specified in figure 3 in order to avoid excessive hot air stratification in the upper part of the room in case of greater installation heights we suggest to proceed with the back suction from the lower part of the room The installation heights refer to the maximum running its state verifying if any Refer to the relevant technical sheets for installation and use of possible accessories Identify model and version of the unit from the indications stated on the carton package speed USE AND OPERATING LIMITS Carry out the hydraulic connections to the heat exchanger and in case of cooling operation to the water drainage system Daikin shall not be held liable if the unit has been installed by non qualified personnel In case of cooling applications make sure to insulate all field installed piping and fittings as to avoid condensate dripping on the floor Non insulated piping can cause water damage if the unit has been used improperly if the unit has been used under conditions that are not permitted if maintenance operations specified in this manual have not been carried out We suggest to provide for the water inlet from the bottom side of the heat exchanger and the outlet on the upper side if non original spare parts have been used Keep the unit in its packaging until it is ready to be installed to prevent dust getting inside For a better water drainage lean the drain pipe downwards at least 3 cm m avoiding loops or narrowing on its way Operating limits are shown here below all other uses are considered improper thermal fluid water glycol water temperature 5 C 95 C maximum operating pressure 10 bar air temperature 5 C 43 C voltage tolerance 10 Selection of location do not install the unit in rooms where inflammable gases are present do not let water spray directly on the unit install the unit on ceilings or walls that bear its weight Leave enough space all around for proper operation and maintenance of the unit taking into account all installed optional accessories never place plug socket the heating Installation and operation manual unit immediately under an electric DAIKIN FWVtFWL FWM Fan coil units 4PW17548 1B

Скачать