Daikin UATY10KY1 [56/87] Installation

Daikin UATY09KTAL [56/87] Installation
ED43-441 Installation
Packaged Air Conditioners UATY-K Series 55
(1) Before starting the installation, confirm that the foundation is strong enough so that the unit will not make noise or
vibrations.
Secure the unit to the foundation with foundation bolts.
(Prepare 4 sets of M12 foundation bolts with the proper nuts and washers.)
The foundation bolts should extend 20 mm from the surface of the base. (See right Fig.)
Place more than three antivibration pads under a unit per one side.
4
INSTALLATION
CAUTION
(2) Remove the yellow packing brace from the
compressor as shown in the figure at the right.
Retighten the installation bolts for the compres-
sor.
Two packing braces are attached to the front of
each compressor.
CAUTION
Carry out the specified installation work after taking into account strong winds, typhoons or earthquakes.
Improper installation work may result in the equipment falling and causing an accident.
Make sure that the drainage of the unit will not inconvenience neighbors or harm the environment. Construct a
drainage ditch if necessary.
If the unit is to be installed on a rooftop, make certain that it will be capable of withstanding the weight of the
unit and that measures have been taken to ensure watertightness.
Model A B
UAT06K(A)
650 1460
UATY06K
UAT08~12K(A)
1230 1200
UATY08~12K
UAT15~21K(A)
1930 1080
UATY15~21K
Return air filter
Filters must be installed in duct work in the field. Do not
operate the unit without a return air filter installed.
The air filter must be installed so that there is enough
space for maintenance.
Filter (commercially available)
Bolt
Compressor
Packing brace
(Yellow)
1PN02530D-4
20mm