Daikin FXCQ63AVEB [8/30] Preparation before installation

Daikin FXCQ32AVEB [8/30] Preparation before installation
7 English
4. PREPARATION BEFORE INSTALLATION
(1) Check the relation of location between the ceiling opening and the indoor unit hanging bolts.
(unit [mm])
(2) Make the ceiling opening required for installation. (in case of existing ceiling)
Use the installation pattern paper (5) matched to the ceiling opening dimension.
Make the ceiling opening required for installation at the installation location and carry out refrigerant/
drain piping, power supply wiring, remote controller wiring (not needed in case of wireless remote con-
troller) and wiring between the indoor and outdoor units. (Refer to each section “6. REFRIGERANT PIP-
ING WORK, 7. DRAIN PIPING WORK and 8. ELECTRIC WIRING WORK”)
After making the opening, sometimes it is necessary to reinforce the ceiling framework to keep the level
of the ceiling and prevent vibration of the ceiling.
For details, consult with the builder and interior designer.
Model A B C D
FXCQ20·25·32·40AVEB 1030 820 775 1070
FXCQ50·63AVEB 1245 1035 990 1285
FXCQ80·125AVEB 1700 1490 1445 1740
B (Hanging bolt pitch)
20 20
C (Unit outside dimension)
520
(Hanging bolt pitch)
620
(Unit outside dimension)
640
(Ceiling opening)
700
(Panel outside dimension)
30 30
A (Ceiling opening)
Top view
D (Panel outside dimension)
(unit [mm])
Decoration panel
Ceiling opening
Indoor unit
Hanging bolt (4 pcs.)
[Relation of locations between the ceiling and the indoor unit]
Hanger
160
Ceiling surface
Side view
(unit [mm])
01_EN_3P249378-7M.fm Page 7 Wednesday, September 12, 2012 1:05 PM