1.2.6.3 Checks after Test Run
Perform the following checks after the test run is complete.
Record the contents of field setting.
Record them on the accessory “REQUEST FOR THE INDICATION” label.
And attach the label on the back side of the front panel.
Record the installation date.
Record the installation date on the accessory “REQUEST FOR THE INDICATION” label in
accordance with the IEC60335-2-40.
And attach the label on the back side of the front panel.
NOTE:
After the test run, when handing the unit over to the customer, make sure the EL.COMPO.BOX
lid, the inspection door, and the unit casing are all attached.