Daikin RXYQ42M9W1B [10/12] After sales service and warranty
![Daikin RXYQ16M7W1B [10/12] After sales service and warranty](/views2/1707498/page10/bga.png)
RX(Y)Q5M7W1B + RXQ8+10M8W1B + RXYQ8~16M8W1B +
RXYQ18~48M7W1B + RXQ5~10M9W1B + RXYQ5~48M9W1B +
REYQ8~48M7W1B + RXYSQ4~6M7V3B
VRVII and VRVII-S system air conditioner
4PW16234-1C
Operation manual
8
11. AFTER-SALES SERVICE AND WARRANTY
Warranty period
■ This product includes a warranty card that was filled out by the
dealer at the time of installation. The completed card was
checked by the customer and stored carefully.
■ If repairs to the air conditioner are necessary within the warranty
period, contact your dealer and keep the warranty card at hand.
11.1. After-sales service
■ Recommendations for maintenance and inspection
Since dust collects when using the unit for several years,
performance of the unit will deteriorate to some extent.
As taking apart and cleaning interiors of units requires technical
expertise and in order to ensure the best possible maintenance
of your units, we recommend to enter into a maintenance and
inspection contract on top of normal maintenance activities.
Our network of dealers has access to a permanent stock of
essential components in order to keep your air conditioner in
operation as long as possible.
Contact your dealer for more information.
■ When asking your dealer for an intervention, always state:
• the complete model name of the air conditioner;
• the manufacturing number (stated on the nameplate of the unit);
• the installation date;
• the symptoms or malfunction, and details of the defect.
■ Recommended inspection and maintenance cycles
Be aware that the mentioned maintenance and replacement cycles
do not relate to the warranty period of the components.
Table 1 “Inspection Cycle” and “Maintenance Cycle” list
Table 1 assumes the following conditions of use:
1. Normal use without frequent starting and stopping of the unit.
Depending on the model, we recommend not starting and
stopping the machine more than 6 times/hour.
2. Operation of the unit is assumed to be 10 hours/day and 2,500
hours/year.
11.2. Shortening of “maintenance cycle” and
“replacement cycle” needs to be considered in
following situations
■ The unit is used in locations where:
1. heat and humidity fluctuate out of the ordinary;
2. power fluctuation is high (voltage, frequency, wave distortion, etc.);
(The unit cannot be used if power fluctuation is outside the allowable
range.)
3. bumps and vibrations are frequent;
4. dust, salt, harmful gas or oil mist such as sulfurous acid and
hydrogen sulfide may be present in the air;
5. the machine is started and stopped frequently or operation time is
long (sites with 24 hour air-conditioning).
■ Recommended replacement cycle of wear parts
Table 2 “Replacement Cycle” list
Contact your dealer for details.
■ Moving and discarding the unit
• Contact your dealer for removing and reinstalling the total unit.
Moving units requires technical expertise.
• This unit uses chlorofluorocarbon.
Contact your dealer when discarding this unit. It is required by law
to collect, transport and discard the refrigerant in accordance with
the “chlorofluorocarbon collection and destruction” regulations.
WARNING
■ Do not modify, disassemble, remove, reinstall or
repair the unit yourself as incorrect dismantling or
installation may cause an electric shock or fire.
Contact your dealer.
■ In case of accidental refrigerant leaks, make sure
there are no naked flames. The refrigerant itself is
entirely safe, non-toxic and non-combustible, but it will
generate toxic gas when it accidentally leaks into a
room where combustible air from fan heaters, gas
cookers, etc. ... is present.
Always have qualified service personnel confirm that
the point of leakage has been repaired or corrected
before resuming operation.
Component Inspection cycle
Maintenance cycle
(replacements and/or repairs)
Electric motor
1 year
20,000 hours
PCB 25,000 hours
Heat exchanger 5 years
Sensor (thermistor, etc.) 5 years
Remote controller and
switches
25,000 hours
Drain pan 8 years
Expansion valve 20,000 hours
Electromagnetic valve 20,000 hours
NOTE
1. Table 1 indicates main components.
Refer to your maintenance and inspection contract for
more details.
2.
Table 1 indicates recommended intervals of
maintenance cycles. However, in order to keep the
unit operational as long as possible, maintenance
work may be required sooner.
Recommended intervals can be used for appropriate
maintenance design in terms of budgetting
maintenance and inspection fees. Depending on the
content of the maintenance and inspection contract,
inspection and maintenance cycles may in reality be
shorter than listed.
Component Inspection cycle Replacement cycle
Air filter
1 year
5 years
High efficiency filter
(Optional)
1 year
Fuse 10 years
Crankcase heater 8 years
NOTE
1. Table 2 indicates main components.
Refer to your maintenance and inspection contract for
more details.
2.
Table 2 indicates recommended intervals of
replacement cycles. However, in order to keep the
unit operational as long as possible, maintenance
work may be required sooner.
Recommended intervals can be used for appropriate
maintenance design in terms of budgetting
maintenance and inspection fees.
NOTE
Damage due to taking apart or cleaning interiors of
units by anyone other than our authorised dealers may
not be included in the warranty.
Содержание
- And system air conditioner 1
- Operation manual 1
- Operation manual 3
- Safety cautions 3
- Before 5
- Changeover switch name and function of each switch 5
- Controller 5
- Cooling heating fan only and automatic operation 5
- Function 5
- Hangeover 5
- Operation 5
- Operation procedure 5
- Operation range 5
- Peration 5
- Procedure 5
- Remote controller 5
- Switch 5
- What to do before operation 5
- Explanation of heating operation 6
- For systems with cool heat changeover remote control switch 6
- For systems with cool heat changeover remote control switch see figure 5 6
- For systems without cool heat changeover remote control 6
- For systems without cool heat changeover remote control switch 6
- Program dry operation 6
- Switch see figure 3 6
- Adjusting the air flow direction 7
- Adjusting the air flow direction 7
- Energy saving and optimum operation 7
- For reyq series see figure 9 7
- For rxyq rxysq series see figure 8 7
- Movement of the air flow flap see figure 7 7
- Nergy saving and optimum operation 7
- Precautions for group control system or two remote controller control system 7
- Setting the master remote controller 7
- Aintenance 8
- Following symptoms are not air conditioner troubles 8
- Maintenance 8
- Maintenance after a long stop period 8
- Maintenance before a long stop period 8
- Ollowing symptoms are not air conditioner troubles 8
- Roubleshooting 9
- Troubleshooting 9
- After sales service 10
- After sales service and warranty 10
- Sales service and warranty 10
- Shortening of maintenance cycle and replacement cycle needs to be considered in followi 10
- Shortening of maintenance cycle and replacement cycle needs to be considered in following situations 10
- Pwen16234 1c 12
Похожие устройства
- Daikin RXYQ42M9W1B Инструкция по монтажу
- Daikin RXYQ40M9W1B Инструкция по монтажу
- Daikin RXYQ44M9W1B Технические данные
- Daikin RXYQ46M9W1B Технические данные
- Daikin RXYQ44M9W1B Руководство по вводу в эксплуатацию
- Daikin RXYQ44M9W1B Инструкция по эксплуатации
- Daikin RXYQ44M9W1B Инструкция по монтажу
- Daikin RXYQ46M9W1B Руководство по вводу в эксплуатацию
- Daikin RXYQ46M9W1B Инструкция по эксплуатации
- Daikin RXYQ46M9W1B Инструкция по монтажу
- Chieftec GPM-750C Техническая спецификация
- Chieftec GPM-650S Техническая спецификация
- Chieftec GPM-650C Техническая спецификация
- Chieftec GPM-550S Техническая спецификация
- Chieftec GPM-450S Техническая спецификация
- Chieftec GPM-1250C Техническая спецификация
- Chieftec GPM-1000C Техническая спецификация
- Chieftec GPF-400P Техническая спецификация
- Chieftec GPS-700A8 Техническая спецификация
- Chieftec GPS-650A8 Техническая спецификация