SilverStone ST65ZF [7/12] St65zf manual 07

SilverStone SST-ST65ZF [7/12] St65zf manual 07
ZEUS ST65ZFZEUS ST65ZF
3.5 No load operation
No damage or hazardous condition should occur with all the DC output connectors
disconnected from the load. The power supply may latch into the shutdown state.
4. TIMING
4.1 Signal timing drawing
Figure 2. is a reference for signal timing for main power connector signals and rails
Figure 2. PS-OK Timing Sequence
(1) T2: Rise time (0.1ms~70ms)
(2) T3: Power good signal turn on delay time (100ms~1000ms)
(3) T4: Power good signal turn off delay time (1ms min)
(4) T5: Rise time (10ms max)
(5) T6: Hold up time (17ms min)
4.2 Hold up time
When the power loss its input power, it shall maintain 17ms in regulation limit at normal
input voltage (AC:115V/60Hz or 230V/50Hz)
5. ENVIRONMENT
5.1 Operation
5.2 Shipping and Storage
06
T5
T1
T6
T2
T4
T3
~
~
~
~
on
VAC
PS-ON
+12V/+5V/+3.3V O/P
pw-OK
pw-OK Sense level=95% of
nominal
off
95%
10%
Temperature 0 to 508C
Relative Humidity
10 to 90%, non-condensing
Temperature -20 to 608C
Relative Humidity
5 to 90%, non-condensing
Скачать